IC, VK, VM, JH, ND; Summary of the ring commissioning meeting
|
- Went up to 100kV in the cavity once it was tuned.
- Achieved nice storage stable for 2500 turns and some beam for > 100ms
- Measured the tune: several peaks around 0.35[1] (near the expected value) and one peak not understood at 0.5 |
ND; Réunion Physique ThomX
|
Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/
Quelques notes de la réunion de Physique de ThomX:
- Présentation de Marie sur les mesures dans le linac |
IC, VK, LS, JH, ND; Summary of the ring commissioning meeting
|
=== Summary of last week:
- Frequency was reduced to 500.0202MHz but the beam stayed only for 100s of turns
- Good storage was achieved at 500.40MHz: |
VK, IC, JH, VM, LS, MB, ND; Summary of the ring commissioning meeting
|
Main studies:
- Measure bucket width in phase on Thursday at 500.02MHz => no storage beyond 45kV
- Measure frequency with spectrum analyser => 500.39MHz |
KD; Mise en place Ligne X 
|
Aujourd'hui (09/06/2023), la Table1 de la ligne X est mise en position faisceau. Je l'ai approximativement alignée dans le faisceau.
Le cablage du pico1 (XLI/OP/TMD.01) est le suivant :
- ch1: diode écran fluo (XLI/OP/TMD.01/I1) |
IC, VK, VM, LS, JH, MB, ND; Summary of the ring commissioning meeting
|
Comments:
* There are strong evidences that part of the frequency problem comes from mechanical issue
* Fring field of the dipoles seems to be longer than anticipated. This could lead to shortening of the orbit. |
IC, VK, VM, LS, JH, SC, ND; Summary of the ring commissioning meeting
|
Report from last week:
- Attempted the strategy suggested by Alex
- Comparison of orbit with RF ON and RF OFF helped understand the "natural" frequency of the ring: 500.33MHz |
KD; RE: Mise en place Ligne X
|
hier et ce matin la ligne a été re-réglé.
La table optique a été déplacé d'environ 1cm vers le canon pour s'aligner un peu mieu à la sortie
CFP. |
VK, IC, LS, ND; Summary of the ring commissioning meeting
|
Discussion mécanique
- Tous les dipoles ont été alignés par rapport à des surfaces de référence
- Le décalage du centre magnétique par rapport au centre mécanique a été mesuré par Cynthia et pris |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020; demarrage a blanc 3 dec 2020
|
Bilan démarrage à blanc 3 dec 2020 : (H Monard, S Cavalier)
but : verification etat IHM pour conditionnement RF avec H Monard + JN Cayla
Sur compte H Monard : sur Client2 plateforme IHM ne se lance pas |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020; signal photodiode laser
|
| |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020; signal photodiode 03-12-20
|
| |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020;
|
Signaux RF - REdPitaya 03-12-20
Photodiode laser - RP.04 A
QS RP.04 B |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020;
|
| signaux photodiode PrC Qs test avec generateur impulsion ! 2 V , 3 µs (bleu ciel) et signal avec rampe, 1V (moire), photodiode (rose) |
Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020; re-organisation PC-client en SdC
|
suite à la discussion de lundi 7 /12/20, les PC clients en SdC ont été déplacés et re-organisé avec les numeros
client1 ,2 , 3 ,4 ,5 dans le sens horaire en salle de controle, en commencant par la gauche en entrant
+----------------------------------------------------------------+ |
CB/HG/SC/KD; Programme linac semaine 5 décembre
|
Lundi 5 décembre : redémarrage technique
Pb refroidissement Pb réglé le mercredi matin concomitance (anneau/linac), sensible à la pression qui est dans
le réseau primaire, à surveiller |
Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020;
|
Laser :
Camera : mettre le temps d'exposition à 0.2 secondes |
CB/SC; liste des actions à menées
|
| |
MO; démarrage
|
| 8h35 mise sous tension: PSS, LB9000, modulateur, chillers |