HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Notes concernant la preparation du Commissionning, Page 2 of 3  Not logged in ThomX    logo
Entry   VK, IC, VI, JH, SC, ND; Summary of the ring commissioning meeting #5 
Entry   Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020; Clients 1, 4 et 5 non fonctionnels 
Entry   IC, VK, VI, VC, JH, HG, ND; Summary of the ring commissioning meeting #1 
Entry   IC, VK, VI, VC, JH, HG, ND ; Ring objectives 
Entry   VK, IC, AM, ND; Summary of the ring commissioning meeting #2 
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: Ring objectives 
Entry   IC, VK, VI (ND); Summary of the ring commissioning meeting #3 
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: Ring objectives 
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: RE: Ring objectives 
Entry   VK, IC, VM, JH, ND; Summary of the ring commissioning meeting 
Entry   VK, IC, VM, JH, KD, ND; Summary of the ring commissioning meeting 
    Reply   ND; RE: Summary of the ring commissioning meeting 
Entry   IC, VK, VM, SC, ND; Summary of the ring commissioning meeting 20_injections.jpg
Entry   VK, VM, SC, ND, HG; Summary of the ring commissioning meeting 
Entry   VK,IC, SC, VM, ND; Summary of the ring commissioning meeting 
Entry   ND; Notes from ThomX Physics meeting 
Entry   ND; Verification variables pour l'anneau ring_vars_2023_02_09_12_15.png
Entry   VM, VK, ND; Summary of the ring commissioning meeting 
    Reply   ND; RE: Notes from ThomX Physics meeting 
Entry   IC, VM, SC, JH, VC, ND; Summary of the ring commissioning meeting data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png
ELOG V3.1.4-395e101