  Notes concernant la preparation du Commissionning, Page 2 of 3  Not logged in ThomX    logo
Entry   KD; Mise en place Ligne X gain_pico.pngfenetre_pico.png
Aujourd'hui (09/06/2023), la Table1 de la ligne X est mise en position faisceau. Je l'ai approximativement alignée dans le faisceau. 

Le cablage du pico1 (XLI/OP/TMD.01) est le suivant :

- ch1: diode écran fluo (XLI/OP/TMD.01/I1)
    Reply   KD; RE: Mise en place Ligne X 
hier et ce matin la ligne a été re-réglé.

La table optique a été déplacé d'environ 1cm vers le canon pour s'aligner un peu mieu à la sortie
CFP.
Entry   IC, VM, SC, JH, VC, ND; Summary of the ring commissioning meeting data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png
Excitation (betatron oscillation) on the beam observed by exciting it with the extraction kicker => initial measures of the tune.

Tune measured close from expected value.

Reason for oscillation damping is not understood.
Entry   IC, VK, VM, SC, ND; Summary of the ring commissioning meeting 20_injections.jpg
Notes from last week:


Beam was very unstable (probably energy instabilities), lot of time was spent tuning the injector.
Beam instabilities prevented
us from having a good storage.
Unable to start the extraction line dipole.


Comments:
Entry   IC, VK, VM, LS, JH, SC, ND; Summary of the ring commissioning meeting 
Report from last week:

- Attempted the strategy suggested by Alex

- Comparison of orbit with RF ON and RF OFF helped understand the "natural" frequency of the ring: 500.33MHz
Entry   IC, VK, VM, LS, JH, MB, ND; Summary of the ring commissioning meeting 
Comments:

* There are strong evidences that part of the frequency problem comes from mechanical issue

* Fring field of the dipoles seems to be longer than anticipated. This could lead to shortening of the orbit.
Entry   IC, VK, VM, JH, ND; Summary of the ring commissioning meeting 
- Went up to 100kV in the cavity once it was tuned.

- Achieved nice storage stable for 2500 turns and some beam for > 100ms

- Measured the tune: several peaks around 0.35[1] (near the expected value) and one peak not understood at 0.5
Entry   IC, VK, VI, VC, JH, HG, ND ; Ring objectives 
This entry is to be updated as the work progresses.

1) Re-establish beam transport to ring

2) Scan in time the septum
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: Ring objectives 
(1),  (2), (4) and (5) from last week have been done other items in progress.

New to do list:

(0) Re-establish beam transport to ring
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: Ring objectives 
New to do list:

(0) Re-establish beam transport to ring

(0bis) Check energy jitter in TL/BPM.02 and TL/SST.02
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: RE: Ring objectives 
To do list:

(0) Re-establish beam transport to ring

(0bis) Check energy jitter in TL/BPM.02 and TL/SST.02
Entry   IC, VK, VI, VC, JH, HG, ND; Summary of the ring commissioning meeting #1 
Status slides presented by Iryna available on indico at https://indico.ijclab.in2p3.fr/event/8749/

The beam parameters required for a good injection in the ring were discussed.

The following required parameters were identified:
Entry   IC, VK, VI (ND); Summary of the ring commissioning meeting #3 

Shift summaries for the ring for last week are at

https://elog.lal.in2p3.fr/THOMX/Commissionning/568

https://elog.lal.in2p3.fr/THOMX/Commissionning/570

https://elog.lal.in2p3.fr/THOMX/Commissionning/571

The
problem with the pulse jumpis with 12ns delays has been identified and fixed (it was related to the synchronisation system).

The main issue identified
Entry   IC, VK, LS, JH, ND; Summary of the ring commissioning meeting 
=== Summary of last week:

- Frequency was reduced to 500.0202MHz but the beam stayed only for 100s of turns

- Good storage was achieved at 500.40MHz:
Entry   IC, VK, AM, VC, ND; Beam requirements for the ring 
The following parameters are required for ring operations:

- At least 50pC on TL/DG/ICT.01 with std <20pC

- At least 20pC on TL/DG/ICT.02 with std <20pC
    Reply   Hayg; RE:  
Pour info :


client 1 ne fonctionne pas encore. Il n'a pas été utilisé depuis longtemps, Guillaume a été prévenu
pour y jeter un oeil.
Client 3 et 5 sont maintenant aux places qui n'ont qu'un seul écran. Une MAJ de la salle devra être
Entry   Hayg; WC tests TANGO 

CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean


 

Dans les variables MeanStd :


Charge 1 :

er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean 


Charge 2 :

er_ca_rac.05-elr.01-wac.02_Ch0_chargeMean   
er_ca_rac.05-elr.01-wac.02_Ch3_chargeMean  
er_ca_rac.05-elr.01-wac.02_Ch4_chargeMean  


Charge
    Reply   Hayg; RE: WC tests TANGO Screenshot_from_2021-03-03_11-29-57.png
 




Hayg
wrote:




CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean


 
Entry   HM MO; redemarrage 17 aout 2022 
9h30 redemarrage HM MO

- niveau 1 verifié (circuit eau, air comprimé, etat modulateur et SF6)

- ronde modulateur faite
Entry   Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020; test moteur solĂ©noide en charge 
Prise de mesure relative entre les deux bobines : 18.7cm avec les alimentations éteintes mais du refroidissement.

Mise en route des alimentations 80A sur la contre champ, et 275 sur la focalisante.

Prise de mesure à nouveau : 18.7cm --> ca n'a pas bougé