Entry   VM, VK, ND; Summary of the ring commissioning meeting 
This week: beam on Thursday.

So far we did not see any screenshot of Ring variables check.

Looking at last week's data, shot to shot charge instability seems to be > 15%
Entry   VK,IC, SC, VM, ND; Summary of the ring commissioning meeting 
No beam last week. No beam this week.

Machine recovery on 2/2 => Nicolas may try to tune the machine with students.

Data taking on 9/2 for diags and machine characterization.
Entry   VK, VM, SC, ND, HG; Summary of the ring commissioning meeting 
Summary of last week:

- On Thursday the beam energy was very different from usual (magnets current higher 172A for TL; 176A for RI) => made it impossible to re-use
previous settings for the ring and to find new settings.
Entry   VK, IC, VM, JH, ND; Summary of the ring commissioning meeting 
Discussed recent orbit correction of the expanded orbit. 

Need to make run with  cavity detuning from its resonant conditions
used in the conditioning. 

 

Discussed measurement of tune, and possible origins of inconsistant/noisy measurements.
 Either BPMs signal processing or  weak excitation. Beam size?

Need to do measurements with scope, to see if we can interpret TbT
Entry   VK, IC, VM, JH, KD, ND; Summary of the ring commissioning meeting 
The ring orbit has been re-established despite some difficulties after the shutdown.

The ring cavity has been started. Whatever the phase it kills the beam.
Two hypothesis:
Entry   VK, IC, VI, JH, SC, ND; Summary of the ring commissioning meeting #5 
See slides attached to the indico page https://indico.ijclab.in2p3.fr/event/8885/

Pb with BPM => visual check of electrodes + hardware swap

Pb with steerer => Need to identify who will do the intervention and when
Entry   VK, IC, VI, JH, ND; Summary of the ring commissioning meeting #4 
- 300 turns achieved.

- Probably more but limited by libera cut-off frequency.

- Need to measure the injection axis
Entry   VK, IC, LS, ND; Summary of the ring commissioning meeting 
Discussion mécanique

- Tous les dipoles ont été alignés par rapport à des surfaces de référence

- Le décalage du centre magnétique par rapport au centre mécanique a été mesuré par Cynthia et pris
Entry   VK, IC, JH, VM, LS, MB, ND; Summary of the ring commissioning meeting 
Main studies:

- Measure bucket width in phase on Thursday at 500.02MHz => no storage beyond 45kV

- Measure frequency with spectrum analyser => 500.39MHz
Entry   VK, IC, AM, ND; Summary of the ring commissioning meeting #2 
Slides are at https://indico.ijclab.in2p3.fr/event/8750/

- There is a difference in BPM numbering in Tango and MML => we should stick to Tango names.

- Beam was very unstable during the past week
Entry   ND, IC; Steerers and BPM map for the ring BPM_ring.pngBPM_ring.pptx
See attached files.
    Reply   ND; RE: Beam requirements for the ring 
An IHM to check some of these parameters has been created (git/panneaux/StatusInfoIHM_ring_vars.py) and added to Plateforme_IHM...




Quote:



The following parameters are required for ring operations:
    Reply   ND; RE: Summary of the ring commissioning meeting 
Regarding the remote control of the RF synthetizer: it can only be controlled via GPIB and RS-232.

=> Phase shift will be done from the synchro synthetiser

=> Power control can be done with a variable attenuator controlled by the synchro synthetiser or a delay generator.
Entry   ND; Notes from ThomX Physics meeting 
Present: IC, VK, VM, VC, SC, MEK, KD, MJ, HG, ND, MO (sous réserve d'oublis)

Visio: CB

L'ordre du jour et les transparents présentés en réunion sont sur: https://indico.ijclab.in2p3.fr/event/9205/
Entry   ND; Verification variables pour l'anneau ring_vars_2023_02_09_12_15.png
L'IHM de verification des variables pour l'anneau a ete mis a jour.

Il est accessible dans plateforme IHM section "Outils", éeme collone, "eme ligne: "Check vars for RING".

Utilisation de l 'IHM (voir copie d'ecran ci-joint):
    Reply   ND; RE: Notes from ThomX Physics meeting 
Présent: VK, SC, KD, MJ, HG, ND

Présentation par Marie. Cf indico https://indico.ijclab.in2p3.fr/event/9242/

Demo par Slava.
Entry   ND; Réunion Physique ThomX 
Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/

Quelques notes de la réunion de Physique de ThomX:

- Présentation de Marie sur les mesures dans le linac
Entry   MO HM; test RF modulateur longue durée (journée) Screenshot_from_2022-08-18_15-56-17.png
but : test fonctionnement modulateur et RF sur la journée

8h55 démarrage modulateur et refroidissement

10h00 démarrage RF ( HV=1090V )
Entry   MO; démarrage 
8h35  mise sous tension: PSS, LB9000, modulateur, chillers
Entry   KD; mesures et shifts Linac 
Réunion 31/03

Prochaines mesures à faire :

Canon :