44
Mon Dec 6 11:22:08 2021
Kevin Dupraz
Under Process
info
lasers and optics | detectors and electronics
Optical room
Cameras Calibration
45
Tue Dec 7 11:48:33 2021
Kevin Dupraz
Under Process
info
lasers and optics | detectors and electronics
Optical room
Cameras Calibration
After check a mistake has been found on
the magnification. This seems to be the good
calibration (feel free to cross check). The
46
Fri Dec 10 16:57:56 2021
Kevin Dupraz
Under Process
report
lasers and optics
Optical room
Manip 10 12 2021 (optimization injection Burst)
Manip 10/12/2021
Après recherche de la résonnance
principale
47
Tue Dec 14 12:59:07 2021
Kevin Dupraz
Under Process
report
lasers and optics
Optical room
Manip 14 12 2021 injection optimization (and calibration)
Matin :
moteurs :
M1, M2 (plans): 5.110500m
48
Thu Dec 16 10:40:55 2021
Kevin Dupraz
Under Process
report
lasers and optics
Optical room
Manip 14 12 2021 injection optimization (and calibration)
Après-midi :
* Optimisation
de l'alignement en injection pour avoir
49
Thu Dec 16 12:12:10 2021
Kevin Dupraz
Under Process
report
lasers and optics
Optical room
Manip 16 12 2021 montée en puissance
Matin:
* Redémarrage Tangor 4W
- couplage 15%
50
Thu Dec 16 12:13:52 2021
Kevin Dupraz
Under Process
report
lasers and optics
Optical room
Manip 16 12 2021 montée en puissance
52
Fri Dec 17 17:03:34 2021
Kevin Dupraz
Under Process
report
lasers and optics
Optical room
Manip 17 12 2021 reprise réf nouvelle injection pour polarisation
Tangor : 4.2W
* Réalignement de l'injection
suite aux modifications :
17
Tue Sep 7 14:27:07 2021
Blanc
Fixed
info
lasers and optics
Optical room
Polarisation Results of the NKT
I made many tests about polarization and
we can see some points thanks to the following
figures :
18
Tue Sep 7 17:48:50 2021
Blanc
Fixed
info
lasers and optics | detectors and electronics
Optical room
Locking of the cavity and setup changing
We change the setup a bit to have the same
polarization on the photodiode and the PDH
(in reflexion of the cavity). CF: schematics
19
Wed Sep 8 10:50:38 2021
Blanc
Fixed
info
lasers and optics
Optical room
Polarisation Results of the NKT
To have the polarisation, we must have
1 value because the laser in entry of the
system has 1 polar. Due to that, the graphe
20
Thu Sep 9 16:34:37 2021
Blanc
Fixed
info
lasers and optics
Optical room
Ring light in the cavity
We put a diaphragm in the input beam but
it doesn't work to suppress the ring
light only but it attenuates the whole transmitted
21
Thu Sep 16 18:23:13 2021
Blanc
Fixed
info
lasers and optics
Optical room
Polarization Results in transmission
After data processing, I finally find the
polarization in transmissin of the FPC. As
you can see below, the polarisation is not
23
Fri Oct 1 16:55:47 2021
Blanc
Fixed
info
mechanics | lasers and optics | detectors and electronics
Optical room
1GHz oscillator Frep measurement
a previous cavity FSR measurement was giving
a center frequency around 867.5MHz.
the
present 1GHz oscillator Frep measurement
33
Thu Oct 7 17:53:53 2021
Blanc
Fixed
info
lasers and optics | detectors and electronics
Optical room
Finess and coupling measurement
We did the measurement of the Finess and
coupling with the NKT, with 2 EOM, without
AOM (so the lock signal is noisy), on the
34
Fri Oct 8 16:02:19 2021
Blanc
Fixed
info
lasers and optics | detectors and electronics
Optical room
Setup and measurements
To summerize the results of this week :
We made the setup in attachement
5 and align it to have the good mode in the
39
Thu Oct 21 09:44:35 2021
Blanc
Fixed
info
mechanics | lasers and optics | detectors and electronics
Optical room
1GHz oscillator Frep measurement
The optical spectrum of the GHz oscillator:
FWHM ~ 4nm
40
Thu Oct 21 10:24:01 2021
Blanc
Fixed
info
utilities
Other
Presentations
Here the first part
of all the presentations since the beginning
of the project.
41
Thu Oct 21 10:30:38 2021
Blanc
Fixed
info
utilities
Other
Presentations
Here the second part
of all the presentations since the beginning
of the project.
42
Thu Oct 21 10:32:54 2021
Blanc
Fixed
info
utilities
Other
Presentations
Here the last part
of all the presentations since the beginning
of the project.
Goto page
Previous
1
, 2,
3
,
4
,
5
Next
All
ELOG V3.1.4-395e101