Entry   VK, IC. VM; Srart of the beam physics measurements 14x
The main idea fo this week is to prepare the beam for the search of the first X-rays.

Start machine without RF cavity. During the day several reboot of the libera.02 (TL).

Study of the dispersion. Measurements of the horizontal dispersion by changing the injector energy (RF section attenuator).
Entry   VK, IC. VM; Orbit correction, BLM in the Ring 7x
The BLM detector boxes were installed in the ring. We connected 3 fibers and 2 scintillator detectors in th ring to be able to observe the beam losses.

Cabling, connection and checks of the BLM without the beam.

Machine start-up. Modulator was switched on at ~9h30.
Entry   VK, IC. VM, AL, ND, LS; Orbit correction, optimization of the storage, study of the RF frequency 8x
9h30 Start of the modulator and lasser (GATE is closed).

9h46 Data is taken as background.

Cavity is tuned to 500.38 MHz. Optimization of the energy and phase. 
Entry   VK, IC, DN, RC, JN; search for X-rays 
8h30 Start of the modumator, laser, magnet cycling

9h45 Beam is ON. Scan charge vs. RF phase.

Attribute Li/OP/OPT.01-ATT.01  is showing value 340mm, this is different from the nominal ones of 300-303. Charge to be remeasured at nominal
Entry   VK, IC. VM, LS, JNC; Test of the new optics (27-28 July) 6x
Start of the modulator and laser at ~9h and hour later start the beam.

Working at 500.38 MHz to retrieve the previous state of the ring. Then switching to 500.33 MHz (assumed ring proper frequency).

- Optimization of the injection and ring (orbit, betatron/synchrotron oscyllations,  tune....)
Entry   VK, IC. VM, LS; Work on the new optics 
9h30 Start of the modulator and laser

Start of the beam. Problem with charge, the max charge at the end of the TL 60 pC. We can not increase it by the attenuator. To be understood.



Corrector ri-c2/ps/str.03-h.01 does not work => problem to control and tune the orbit. JNC will look
Entry   VK, VM, IC, LS; Work on the new ring lattice (August, 2-4) 13x
Starting point nominal lattice D1Thomx_017_064_r56_02_chro00 with the MCF=0.014  chro=0/0

Goal: test the new lattice with MCF=0.0231  chro=0/0 which alows to decrease the RF frequesncy down to 500.25 MHz. This will make possible
operation witht eh FPC.
Entry   RC VC MJ ; commitionning 2024-01-31_16_01_44_el_dg_sst_01-ccd_01_RAW.png2024-01-31_16_02_12_tl_dg_sst_01-ccd_01_RAW.png
Chauffage mod 11h

demarrage machine 14H

on suit le star faisceau step par step
Entry   KD, VK, VM; run du 27 février 2024 
9h: mise en chauffe de la machine (chillers, laser, aimants, modulateur)

Mohamed regle la cavité RF sur 500.06MHz
Entry   IC, VM, VK; Restart and tuning of the injector Screenshot_from_2024-03-05_15-13-48.png
10h Intervention to repair the water leakage. It was repaired.

New problem with vacuum pomp is found in the ring. The two problems are due to the water leakage. Intervention is ongoing.

12h Warm up of the machine
Entry   IC, VM, VK; X-ray generation Screenshot_from_2024-03-06_10-56-53.pngScreenshot_from_2024-03-06_17-18-12.pngScreenshot_from_2024-03-06_15-08-24.png
8h50 Warming up the machine

10h start the beam

Tuning the injector
Entry   VK, VM, IC; Recomissioning of the SR, search for the X-rays Screenshot_from_2024-03-07_09-02-36.png
8h50 Warming up the machine

Problem with the vaccum around the RF cavity (see screenshot attached). Intervention of vacuum team is needed.

Mohamed is installing the powermeter to monitor the incomingt RF power for the accelerating structure.
Entry   KDn Dupraz from 109.222.35.58 on Thu Oct 31 08:19:12 2024; shift du 31 octobre 2024 Screenshot_from_2024-10-31_13-37-11.pngScreenshot_from_2024-10-31_12-07-13.pngclosed_orbit_31102024.png
8h15: mise en chauffe en remote (modulateur, laser, chiller, Cycling)

Tuning of the linac and injection to the ring

Goal: Search for the non-dispersive orbit and proper RF frequency
Entry   VM Entered by Super Team from 134.158.195.141 on Thu Nov 21 08:26:43 2024;  
08H25 Start ThomX

09H45 HV is 'ON'

09h49 Breakdown in the RF Gun
Entry   VM, IC, VK ;  
08h18 Start ThomX

10h00 HV is 'ON'

10h35 RF Gun phase is 174 dg. Section Phase is  209 dg. Sect. Att. is 2.70 dB TL/BPM2 X=0, Charge is -127 pC
Entry   VM Entered by Super Team from 134.158.195.141 on Thu Dec 5 08:31:12 2024;  
08h28 Start ThomX

08h40 Some magnets remain switched off. Cycling was not performed

10h20 V is 'ON'
Entry   VM, IC, VK, HG ;  8x
08h25 Start ThomX

09h55 HV is 'ON'

10h18 RF Gun Phase is 159 dg. Sect. Phase is 208 dg. Att. 2.66 TL/BPM2 X=-2mm, Isol =230 A, Charges: -115 pC, -95.7 pC, -100 pC
Entry   VM, IC, VK;  Screenshot_from_2024-12-13_11-28-46.pngScreenshot_from_2024-12-13_14-44-28.pngScreenshot_from_2024-12-13_14-46-59.png
08h23 Start ThomX

09h40 HV is 'On'

10h24 RF Gun Phase 183 dg. Sect. Att. is 2.533, Phase 212 dg. Charges; -100.0 pC, -93.0 pC, -109.0 pC, Linac steerers H [2.68 -4.4], V [-2.0
Entry   IC, VK, VM;  
11h05 Start ThomX

11h50 BPM02-Libera04 wiring has been checked: 'OK' 

12h20 HV is 'ON' 1215 V
Entry   IC, VK, VM, ND;  10x
08h25 Start ThomX: Modulator, Frigo, cycling all magnets

08h30 Start chillers

10h00 HV is 'On'