Entry   Entered by Hayg Guler from 134.158.91.29 on Thu Sep 22 10:08:17 2022; , entered from 134.158.91.29 
 
Entry   Entered by Nicolas Delerue from 134.158.88.175 on Tue Oct 4 17:33:52 2022; Planning shift Thursday 6th October 
- Study beam position on SST and BPM vs iris size / TL/BPM.01

- Start AcQAttrManager

- Study RDP vs TL/BPM.02
Entry   VK, VM, HG,IC, AL;  
Shift started with machine receipy from Monday .

Scan parameters, injection to find orbit in the ring. Testing alghrithms for orbit correction.

15.55 Energy , charge not stable, asked Hayg to stabilize .
Entry   Entered by Nicolas Delerue from 80.119.21.73 on Thu Oct 27 11:12:17 2022; Programme prise de donnĂ©e 28/10 
 

 

===
Entry   ND/VK/IC/KD/HG/MJ; Prise de donnee 13/01 scan_charge_phase_min_0.0_max_360.0_9_54_10.pngscan_charge_phase_min_190.0_max_230.0_9_54_54.png2023-01-13_09_58_47_li_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png2023-01-13_10_01_07_tl_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
Mise en chauffe

9:45 Cyclage aimants

9:48 Demarrage
Entry   Entered by Marie Jacquet from 134.158.205.47 on Wed Mar 8 11:45:31 2023; I-dipole vs X_TLBPM02 - Mesures/Simul (suite elog 28 fev) 
Tue Feb 28 08:48:29 2023

8H50-demarrage chiller et chauffage klystron

   * Laser réaligné avec phase (foc max) et (foc max -3deg).
Entry   ; , entered from 134.158.195.141 
<p>12h10: Mise en chauffe modulateur, laser et chiller + PA</p>

<p>14h30: mesure phase relative sortie pilote/ sortie PA  Vrms pilote, Vrms PA   <strong>Sans HT dans le Klystron</strong></p>
Entry   KD MJ;  
 
Entry   IC, VK, VM, ND; Ring studies, MRSV 36x
07h50 Start ThomX

09h20 HV is 'ON'

09h25 HV  1215 V
Entry   VM, IC, VK; 70 MeV WP 
10h30 Start beam

Since Friday evening the problem to store the beam at 70 MeV. There is 1 turn only. Probably some subsystem failure. At this moment the reason
is not found. Help is needed: synchronization/Diag/Magnets.
Entry   HG, DN. VM, MJ;  mrsv_2_positions_fente.png
11h40 Thomx warm-up

12h35 HV is ON

12h40 HV 1215 V
Entry   Entered by Super Team from 134.158.195.141 on Fri Oct 24 08:33:07 2025;  
08h32 Warm-up ThomX: Modulator, Laser, Fridge

08h37 Chilers were started, cycling all magnets

09h38 HV is ON
Entry   Entered by Super Team from 134.158.195.141 on Tue Oct 28 08:40:06 2025;  Screenshot_from_2025-10-28_11-48-31.pngScreenshot_from_2025-10-28_11-47-12.pngScreenshot_from_2025-10-28_11-46-55.pngScreenshot_from_2025-10-28_15-34-03.png
08h40 Warm-up ThomX: Modulator, Laser, Fridge

08h45 Chillers were started, cycling all magnets

09h45 HV is ON
Entry   Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025;  Screenshot_from_2025-11-05_17-49-33.pngScreenshot_from_2025-11-05_17-51-14.pngScreenshot_from_2025-11-05_17-50-44.png
Matin :

Soucis synchro :
- Nicolas les a redémarré
Entry   IC; Ring studies Screenshot_from_2026-01-15_11-04-16.pngScreenshot_from_2026-01-15_11-33-33.pngRi_C1_Quads_is_off_Screenshot_from_2026-01-15_18-19-14.pngScreenshot_from_2026-01-15_16-42-27.pngScreenshot_from_2026-01-15_17-36-28after1LOCO.png
08h56 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.
Low SF6 pressure. 
Entry   IC, VM, ND;  Screenshot_from_2026-01-16_18-28-24.pngScreenshot_from_2026-01-16_13-22-12.pngScreenshot_from_2026-01-16_13-23-01.pngScreenshot_from_2026-01-16_13-31-16MODEl.pngScreenshot_from_2026-01-16_16-02-15LOCO_1it.png
08h29 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.

10h48 Beam is in the ring after resolving a lot of problems. The receipt loaded: recipe_recipe_LI_TL_RI_all_20260115_18_10_34.txt, with Linac-Tl
Entry   VM, ND, VC;  
08h35 Warm-up ThomX: Modulator, Laser, Fridge
08h41 Chillers were started, cycling all magnets.

09h40 HV is ON
Entry   IC; Ring studies 
9h40: mise en chauffe (chillers/frigo, modulateur, cyclage)

HV ON

The ICT signal (GUN) is frozen. Need help to restart it. Use the BPM SpSum instead.
Entry   IC, VM;  
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

09h19 HV is on
Entry   VM;  
09h00 Warm-up ThomX: Modulator, Laser, Fridge

09h05 Chillers were started, cycling all magnets

10h03 HV is on