Entered by Hayg Guler from 134.158.91.29 on Thu Sep 22 10:08:17 2022; , entered from 134.158.91.29
|
| |
Entered by Nicolas Delerue from 134.158.88.175 on Tue Oct 4 17:33:52 2022; Planning shift Thursday 6th October
|
- Study beam position on SST and BPM vs iris size / TL/BPM.01
- Start AcQAttrManager
- Study RDP vs TL/BPM.02 |
VK, VM, HG,IC, AL;
|
Shift started with machine receipy from Monday .
Scan parameters, injection to find orbit in the ring. Testing alghrithms for orbit correction.
15.55 Energy , charge not stable, asked Hayg to stabilize . |
Entered by Nicolas Delerue from 80.119.21.73 on Thu Oct 27 11:12:17 2022; Programme prise de donnée 28/10
|
=== |
ND/VK/IC/KD/HG/MJ; Prise de donnee 13/01   
|
Mise en chauffe
9:45 Cyclage aimants
9:48 Demarrage |
Entered by Marie Jacquet from 134.158.205.47 on Wed Mar 8 11:45:31 2023; I-dipole vs X_TLBPM02 - Mesures/Simul (suite elog 28 fev)
|
Tue Feb 28 08:48:29 2023
8H50-demarrage chiller et chauffage klystron
* Laser réaligné avec phase (foc max) et (foc max -3deg). |
; , entered from 134.158.195.141
|
<p>12h10: Mise en chauffe modulateur, laser et chiller + PA</p>
<p>14h30: mesure phase relative sortie pilote/ sortie PA Vrms pilote, Vrms PA <strong>Sans HT dans le Klystron</strong></p> |
KD MJ;
|
| |
IC, VK, VM, ND; Ring studies, MRSV 36x
|
07h50 Start ThomX
09h20 HV is 'ON'
09h25 HV 1215 V |
VM, IC, VK; 70 MeV WP
|
10h30 Start beam
Since Friday evening the problem to store the beam at 70 MeV. There is 1 turn only. Probably some subsystem failure. At this moment the reason
is not found. Help is needed: synchronization/Diag/Magnets. |
HG, DN. VM, MJ;
|
11h40 Thomx warm-up
12h35 HV is ON
12h40 HV 1215 V |
Entered by Super Team from 134.158.195.141 on Fri Oct 24 08:33:07 2025;
|
08h32 Warm-up ThomX: Modulator, Laser, Fridge
08h37 Chilers were started, cycling all magnets
09h38 HV is ON |
Entered by Super Team from 134.158.195.141 on Tue Oct 28 08:40:06 2025;   
|
08h40 Warm-up ThomX: Modulator, Laser, Fridge
08h45 Chillers were started, cycling all magnets
09h45 HV is ON |
Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025;  
|
Matin :
Soucis synchro :
- Nicolas les a redémarré |
IC; Ring studies    
|
08h56 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.
Low SF6 pressure. |
IC, VM, ND;    
|
08h29 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.
10h48 Beam is in the ring after resolving a lot of problems. The receipt loaded: recipe_recipe_LI_TL_RI_all_20260115_18_10_34.txt, with Linac-Tl |
VM, ND, VC;
|
08h35 Warm-up ThomX: Modulator, Laser, Fridge
08h41 Chillers were started, cycling all magnets.
09h40 HV is ON |
IC; Ring studies
|
9h40: mise en chauffe (chillers/frigo, modulateur, cyclage)
HV ON
The ICT signal (GUN) is frozen. Need help to restart it. Use the BPM SpSum instead. |
IC, VM;
|
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
09h19 HV is on |
VM;
|
09h00 Warm-up ThomX: Modulator, Laser, Fridge
09h05 Chillers were started, cycling all magnets
10h03 HV is on |