HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX  Not logged in ThomX    logo
Message ID: 787     Entry time: Mon Jul 31 16:57:11 2023
 Author: VK, IC. VM, LS 
 Status:  
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject: Work on the new optics 
 Icon:  

9h30 Start of the modulator and laser

Start of the beam. Problem with charge, the max charge at the end of the TL 60 pC. We can not increase it by the attenuator. To be understood.

Corrector ri-c2/ps/str.03-h.01 does not work => problem to control and tune the orbit. JNC will look at it. 

permanent probmem with Libera.02 and Libera.04

Work at 500.32 MHz without orbit correction.

ELOG V3.1.4-395e101