  Toutes les notes concernant les Commissionning de ThomX, Page 5 of 63  Not logged in ThomX    logo
Entry   VK/ND/SC; Faisceau Anneau 10x
Modulateur Impossible à passer en Standby ==> problème manque d'eau.

      * Remise à ~4bars le réseau principal

      *  Restart du soft du modulateur (sinon l'erreur reste)
Entry   IC, VM, VK, AL, JH; Optimization of the ring 6x
Start of the modulator at 9h45

11h30 Problem with water regulation. Probably falseread of GUN PT100. Hayg and Viktor is tryig to adjust manually the temperature of the chiller
for RF gun. We stopped at the settings as attached.
Entry   VC VK IC; Commissionning 
8H15 demarrage chauffage Klystron et chiller

9h15 bunker ouvert (intervention société extérieure jusqu'à 9H30)

10H injection dans l'anneau avec recette 20221020-1420
Entry   VK, VM, IC, KD; Ring commissioning 7x
Start of the machine by KD

11h20 The beam is in the ring

Optimization of the injection with the RCDS
Entry   KD; shift du 9 decembre 2022 
8h25 : Mise en chauffe (pression eau toujours OK)

 Intervention casemate :

- Sextupoles SP02 resseré
Entry   SC/ND/IC/VK/VM; Faisceau  11x
Mise en chauffe modulateur et refroidissements

Résistivité : 3.53 MOhm et Pression eau : 3.7

9:40: Cyclage des aimants. Problemes habituels.
Entry   ND, VK, VM; Shift 23/2 9x
9h22 mise en chauffe

 

Pb site elog; autres sites web OK
Entry   ND, Enzo Crou, Noé Idesheim, Jean-Nicolas Quenot; Prise de donnee 16/3/2023 17x
9:15 Mise en chauffe

10:30 Ronde casemate

10:40 Start beam
Entry   IC, VM, VK, ND; RIng commissioning 10x
8:50 Mise en chauffe

10h Starting the beam

Tuning of the TL
Entry   VK, VM, IC, LS; Restart storage in the Ring 
~9h Start of the modulator

10h Tuning of the injector with KD

11h Try to inject in the ring. Only 1-2 turns after optimization. We tried previous injector settings, the situation is the same. We retuned
Entry   KD VM VK JN SL; shift du 5 mai 2023 Screenshot_from_2023-05-05_17-25-28.pngScreenshot_from_2023-05-05_17-13-31.pngScreenshot_from_2023-05-05_17-13-41.pngScreenshot_from_2023-05-05_17-52-52.pngScreenshot_from_2023-05-05_17-50-31.png
8h30 : accès casemate controlé 

==> septum et kickers OFF et cavité RF OFF

==> problème cavité RF, mux 3 défaut de communication
Entry   ND, LS, IC, VK, VM, SW; Ring operation 15/5 7x
10:00 Machine warm up

Magnets cycling

11:00 Start machine
Entry   LS, ND, IC, VK; Ring operation 16/5 health_check_2023_05_16_12_02.pngscan_charge_phase_min_0.0_max_360.0_12_8_7.png2023-05-16_12_13_52_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngring_storage_quality__2023_05_16_16_06.png
9:33 Start warming up

9:45 Ducre is working on the plumbing but it shuld not affect operations

11:00 Intervention JNC pour problemes refroidissement
Entry   VK, IC. AL; Understanding of the shift in RF frequency 18x
8:40 Start warming up, problem with PSS. It was restarted.

Problems to start and tune the RF cavity. A clear working procedure and reliable tuning should b defined to optimize the Ring comissioning progress.

Feedback for teh RF has the suspicious behavior. At motor position close to the nominal, the feedback ofsets the motor in the negative direction
Entry   VK, IC; RF frequency of the Ring scan_charge_phase_min_0.0_max_360.0_10_43_35.pngScreenshot_from_2023-05-19_13-50-56.pngScreenshot_from_2023-05-19_13-56-41.pngScreenshot_from_2023-05-19_12-15-50.png
In the morning, after the start-up pf the machine, scan phase-charge and small tuning it was possible to store the beam with the settings from previous
day.

The storage was optimize withthe dipole current of 159.9 (best storage up to now). RF cqvity voltqge 20-100 kV.
Entry   VK, IC. VM, LS; Studies on the beam revolution frequency 12x
The main task for today is to measure the revolution frequency without RF cavity with the spectrum analyzer.

Start-up of the machine.

After setting the previous setting, the orbit was very different. We checked the injector, the beam also was different (based on the beam images)
Entry   ND, LS, IC, VK, VM; Studies on the Ring revolution frequency 8x
Goal: understanding of teh beam natural revolution frequency. Study the effect of the dipoles.

We have started from the previous setting of the machine. Then we loaded the settings from last december and received better storage. RF cavity
is OFF.
    Reply   ND, LS, IC, VK, VM; RE: Studies on the Ring revolution frequency 
Bonjour,

Pouvez vous enregistrer les images de l'oscilloscope et le donnée brute à la place des screenshots. Il y a une option dans
l'interface web pour enregistrer l'oscillogramme "proprement". De même pour les images, cela permet de faire des traitements à
Entry   VK, IC. VM; Reestablishing running conditions at 500.38 MHz scan_charge_phase_min_0.0_max_360.0_14_32_59.pngScreenshot_from_2023-06-12_15-23-07.pngScreenshot_from_2023-06-12_15-40-14.pngScreenshot_from_2023-06-12_17-38-24.pngScreenshot_from_2023-06-12_17-32-48.png
Goal of the shift: Reestablish the good storage at 500.38 and then try to optimize the storage and orbit.

Start up of the machine.

RF cavity start up by Mohamed. Water leakage. Jean-Noel will fix tomorrow mornig. Mohamed also says that aparently the sinal from ring syntetizer
Entry   VK, IC. VM, ND, LS; beam storage closed_orbit_13062023.pngScreenshot_from_2023-06-13_18-27-36.pngScreenshot_from_2023-06-13_18-25-45.pngScreenshot_from_2023-06-13_17-23-16_WO_RF.png
The main idea fo this week is to prepare the beam for the search of the first X-rays.

Start without RF cavity. Study of the orbit. Orbit correction. We menage to correct hor. and vert. orbit.

We put the RF cavity ON. A lot of interlocks during the day. Difficult to operate i this conditions.