VM, IC, VK; 10x
|
08h25 Start ThomX: Modulator, frigo
08h35 Start chilers, laser, cycling all magnets
10h05 HV is 'On' |
MV, IC, VK; 16x
|
08h43 Start ThomX: Modulator, frigo, laser, cycling all magnets
08h50 Chillers started
09h52 HV is 'On' |
MV, IC, VK, RC;
|
08h41 Start Thomx: Modulator, Frigo, Laser
08h46 Start chillers, all magnets sycling
09h50 Start RF |
Ring team; Ring Working Points 50 MeV/ 61.5 MeV / 70 MeV 8x
|
50 MeV
Configuration: good_20250123_17_53_01 "Working Point at 50 MeV for X_rays"
After RCDS optimization with X-rays good_20250124_15_05_25 "Updated WP with RCDS on X-rays 50 MeV " |
MV, IC, VK, RC;
|
08h45 Start Thomx: Modulator, frigo, laser
08h50 Start chillers, cycling all magnets
Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23) |
MV, IC, VK, RC;  
|
08h45 Start Thomx: Modulator, frigo, laser
08h50 Start chillers, cycling all magnets
Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23) |
ND, SC, Marie Labat, IC, VM; Opérations caméra à balayage / MRSV 20x
|
8h50 Mise en chauffe modulateur
Changement de la carte mère pour la badgeuse de la ligne X
31.2degres, toujours dAlignement laser dans la casemate |
Entered by Super Team from 134.158.195.141 on Fri Feb 14 08:21:09 2025;
|
08h20 Start ThomX: modulator, laser, fridge,cycling all magnets
08h25 chillers are started
09h50 Controlled access (Rhonic) |
Entered by Super Team from 134.158.195.141 on Wed Feb 19 08:27:57 2025;
|
08h26 Start ThomX: Modulator, Fridge, Laser
08h32 Chillers were started, cycling all magnets
11H changement de la carte synchro... Carte synchro opérationnel |
Entered by Super Team from 134.158.195.141 on Thu Feb 20 08:24:55 2025; 6x
|
08h25 Start ThomX; Start ThomX: Modulator, Fridge, Laser
08h32 Chillers were started, cycling all magnets
11h23 HV is 'On' |
VM, VC, RC, DN; 16x
|
08h53 Start ThomX
11h10 The oscilloscope installed in the bunker
11h11 HV is 'On' |
VM, VC, RC, IC; 12x
|
08h27 Start ThomX: Modulator, Laser, Frig
08h34 Chillers were started, cycling al magnets
12H ready to start beam ( 13H30) |
VM, IC, RC;   
|
08h00 ThomX started by Maher
09h50 Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.
ThomX configuration changed to 'Linac'. |
VM, IC, DN;
|
08h42 Start ThomX: Morulator, firg, laser
08h47 Chillers, cycling all magnets
10h40 HV is 'ON' |
VM, RC, DN, ND;    
|
08h15 Start Thomx: modulator, frig, laser
08h21 Chillers started, all magnets cycling
Filesystem very slow |
VM;
|
08h22 ThomX was started: modulator, frig, laser
08h28 Chillers was started, all magnets cycling
09h45 HV is 'ON' |
VM, IC, DN ;
|
08h20 ThomX was started: Modulator, frig, laser
08h27 Chillers were started, cycling all magnets
10h50 HV is 'ON' |
VM, IC; Ring BLM and charge linearity 6x
|
Goals:
- Work on the BLM to have the signals at the injection and from the arc in the ring.
- Study on the ring injection and beam storage at higher beam charge. Check the linearity. |
VM, IC; 9x
|
Goal: Beam Loss Monitors and Ring injection at high charge. Studies of the injector for high charge. Emittance measurements.
08h33 ThomX was started: modulator,frig, laser |
KD,VM,IC; 
|
08h00 ThomX was started
Goals: Emittance measurements, ring optics study
10h00 HV was 'ON' |
|