Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025;  
|
Matin :
Soucis synchro :
- Nicolas les a redémarré |
Entered by Marie Jacquet from 134.158.205.9 on Thu Oct 30 07:21:05 2025; Programme shift (X-rays spectres vs atte & phases)
|
08h17 Warm-up ThomX: Modulator, Laser, Fridge
08h24 Chillers were started, cycling all magnets
09h18 HV is ON |
Entered by Super Team from 134.158.195.141 on Tue Oct 28 08:40:06 2025;   
|
08h40 Warm-up ThomX: Modulator, Laser, Fridge
08h45 Chillers were started, cycling all magnets
09h45 HV is ON |
Entered by Super Team from 134.158.195.141 on Fri Oct 24 08:33:07 2025;
|
08h32 Warm-up ThomX: Modulator, Laser, Fridge
08h37 Chilers were started, cycling all magnets
09h38 HV is ON |
KD RC VC MJ; shift du 23 octobre 2025
|
7h45: mise en chauffe en remote (modulateur, laser, frigo/chillers, cyclage)
8h45 : mise en route Modulateur
recette "50MeV_smallorbit_with EL_20251016_19_49_25.txt" fichier VIDE |
HG, DN. VM, MJ;
|
11h40 Thomx warm-up
12h35 HV is ON
12h40 HV 1215 V |
MO VC ND VM; Shift summary
|
demarrage machine 8H35
9H45 hV on 1215V
Q linac 100pC |
KD, IC, VM; shift du 16 octobre 2025 6x
|
7h30: mise en chauffe en remote (chillers/frigo, laser, cyclage)
==> impossible de passer en Standby sur le modulateur ==> mail envoyé à Maher.
8h30 We inspected the modulator, made the rondes. The error (status 8 bit) remains. Need for help from Maher. problem: Modumator PSS. |
KD; shift du 14 octobre 2025 8x
|
7h55: mise en chauffe en remote (laser, frigo/chiller, modulateur, cyclage)
==> Nouvelle interface de cyclage, on ne voit plus la progression ou l'état des éléments. (impossible de savoir si
le cyclage à bien fonctionné) |
Hayg; Emittance QP3
|
QP3 scan
vary Soleno
Iris 1mm ATT 400 (150 pC) |
ND, VM; Prise de données 10/10 7x
|
9:00 Mise en chauffe
9:20 Intervention de deux personnes de Dalkia dans l'igloo.
9h30 Cyclage aimants |
Entered by Super Team from 134.158.195.141 on Thu Oct 9 08:37:29 2025; Shift "du Jeudi" : VM/HG/KD/DN/RC   
|
09h35 Warmup ThomX
09h40 Cycling all magnets
09h50 Start Chillers |
ND VC; Shift summary
|
Demarrage machine 9H
test cyclage: OK (relecture courant parfois NAN)
Correction des fenetre d'intégration de mesure de charge des ICTs |
Entered by Super Team from 134.158.195.141 on Thu Oct 2 08:31:43 2025;
|
08h30 ThomX warm-up
08h37 Cycling all magnets
10h20 HV is ON |
KD, IC, VM; shift du 1e octobre 2025
|
7h40: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage)
==> IHM cyclage très longue à lancer, (a planté hier, pas aujourd'hui), des nan apparaissent (cf. screenshot)
08h45 Start modulator |
KD; shift du 30 septembre 2025
|
8h40: mise en chauffe en remote (frigo/chiller, modulateur, laser)
9h30: ajout de graisse sur le verrin du shutter Xline dans la casemate
9h45: le klystron ne passe pas en HV, gros problème de perverance aussi (impossiblde de passer à 1215V) |
ND; Verifications IHM_cyclage
|
9:00 Accès pour FPC
Recherche des problemes de plantage de l'IHM cyclage.
Plantages difficiles a reproduire (pas de plantage quand j'essaie). |
KD, VM, IC; shift du 25 septembre 2025  
|
8h05: mise en chauffe en remote de la machine (modulateur, frigo/chiller, laser)
==> cyclage aimant plante, donc aimant non allumés ni cyclé.
9h All keys are in vertical position. Totes rondes sont tombees. We need help to restart. |
DN, KD, ND; Prises de données MRSV et Streak camera
|
Matin: Alignement.
Apres midi tentative de voir du faisceau en salle laser.
Faisceau tres faible. |
KD; shift du 19 septembre 2025
|
7h50: mise en chauffe en remote (modulateur, frigo/chiller, laser, cyclage)
==> plantage cyclage entre les QP Ri-C1 et Ri-C2 |