Message ID: 1169     Entry time: Mon Dec 15 08:06:26 2025
 Author: KD MJ 
 Status: Under Process 
 Type: Shift summary 
 Category: Linac Commissionning | Ring Commissioning 
 Important:
 Subject: shift du 15 décembre 2025 
 Icon:  

8h: mise en chauffe en remote (chiller/frigo, laser, modulateur, cyclage)

* cannot enter to the ring with the recipe "40_MeV_Enough_Good_20251211_14_07_28", probably due to mis alignment procedure of the QP1-QP3.
* reset de TL steerers with the recipe "40MeV_20250401_15_09_50", first turn ok but no storage.
* steerers Ring to 0.

12h --> back to previous cathod point (last week tuning was done at that position)

  • TEST/HL/ThomX_PhotoCathode/Horizontal_Iris_Position_set : <type 'float'> : 4.714
  • TEST/HL/ThomX_PhotoCathode/Vertical_Iris_Position_set : <type 'float'> : 3.524

17h: essaie avec la recette initial de mardi "recipe_recipe_LI_TL_RI_all_20251209_17_54_51.txt"

==> difficile de retouver le TBTsum de mardi, ==> après quelques ajustements (rcds, etc). on retrouve quelques choses de passable

==> MRSV totalement différent: long, étalé et pas au même endroit (à droite au lieu d'être hors écran à gauche)

==> problème de répétabilité. La seule différence est la température de la section. 

 

*** Scan FPC table (~16h) - A l'oeil FWHM ~ 300 microns ==> rms ~ 128 ==> sig_ele_Vert ~ 107 ==> sig_Source_Vert ~ 60 microns

Bilan imagerie du jour :
tres bas flux et faisceau tres instable .==>  Pas de contraste de phase visible. On espere que demain sera mieux ! 

======================================================================================================

*** programme ***

Mesure imagerie X à basse énergie (40MeV)

 