HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX  Not logged in ThomX    logo
This is a draft message, edit and submit it to make it permanent  
Message ID: 1171     Entry time: Wed Dec 17 07:17:06 2025
 Author: KD, IC, MV, DN, 
 Status: Under Process 
 Type: Shift summary 
 Category: Linac Commissionning | Ring Commissioning 
 Important:
 Subject: shift du 17 décembre 2025 
 Icon:  

7h15: mise en chauffe en remote (chiller/frigo, laser, modulateur, cyclage)

8h33 HV ON

09h30 Beam is in the ring 40 MeV, RF 100 kV ==> 150 kV I3+I4 up to 14000 pA. Vertical step at IP from -2 mm to +2 mm. MRSW 24.5 pix. Receipt  recipe_recipe_LI_TL_RI_all_20251217_09_17_49.txt

10h19 Hor. tune 0.177, sum of TbTsum 2e11. TL/BPM02 X=+3 mm, RF cavity phase 5 dg. Sect Att. 3.967 dB, Sect. phase 197 dg. RF gun phase 222 dg. Charges: -165, -157, -159, -161, -158 pA Laser Att. 300, Sol. 223 A

 

 

*** Programme ***

* faire 1 à 2 tomographie à 40 Mev avant de passer aux manips à 70MeV (besoin de flux pour la rapidité d'acquisition)

* passage à 70MeV, mesure de dosimétrie et spectre angulaire