The machine was warmed up remotemy
The FPC is ready. The laser is locked.
9h Start HV
9h08 Modulator is put to standby. Access to "repair" shutter X-line
9h20 Restart the beam
9h39 Problem with the camera laser photocathode. It does not start. So; feedback does not work and the generated charge is drifting.
9h45 Another access to fix/restart the camera
10h Camera is working. Chillers gun and RF structure are ON also now;
10h30 Beam in the ring
Miss triggering issues, see ICT data for example.
13h : Kevin recabled the delay box on the "right" cable to avoid bad 50 Hz signal.

|