KD MJ RC DN; shift du 09 décembre 2025 - 70 MeV et 40 MeV 6x
|
8h : mise en chauffe en remote (modulateur, cyclage, frigo/chillers, laser)
Stockage 70MeV ok, le faisceau MRSV semble gros en horizontal (cavité RF 250kV)
e-: |
Marie Julien Hayg Sophie; Matching ring-TL - Recherche des bons twiss pour la TL
|
Programme shift : etudes matching anneau-TL - Recherche param twiss TL
Valeurs ideales TL "de Julien" : betaX = 36 betaY = 36 alphaX = -4.5 alphaY
= -4.5 ( = figure of merit tres petit) |
Entered by Super Team from 134.158.195.141 on Fri Dec 5 08:31:45 2025;
|
08h31 Warm-up ThomX: Modulator, Laser, Fridge
08h36 Chillers were started, cycling all magnets.
10h07 HV is ON |
Entered by Super Team from 134.158.195.141 on Thu Dec 4 08:58:52 2025; Preparation/check of the 70 MeV WP for X-ray run  
|
Goal: preparation and checking the machine operation at 70 MeV and 40 MeV (ideally with X-rays)
8h54 Warming up
RF section 29.20 C -> 28.5 C |
Entered by Super Team from 134.158.195.141 on Wed Dec 3 11:08:54 2025; Demarrage ThomX
|
Soucis Septum : Maher help
C'est résolu |
Entered by Super Team from 134.158.205.28 on Tue Dec 2 09:27:54 2025; Shift ThomX/Xrays : Soucis démarrage
|
Last Recettes for 50 MeV:
recipe_recipe_LI_TL_RI_good_20251127_12_42_51.txt
recipe_recipe_LI_TL_RI_good_20251125_16_42_01.txt |
KD; shift du 27 novembre 2025    
|
8h: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage)
9h30: Chargement de la recette : "recipe_recipe_LI_TL_RI_all_20251126_09_35_14.txt" pour référence
ajustement energie linac et phase cavité RF pour réduire l'oscillation synchrotron. |
KD MJ VM DN RC; shift du 26 novembre 2025 8x
|
7h50: mise en chauffe à distance (frigo/chiller, laser, modulateur, cyclage)
11h13 Beam is in the ring, 50 MeV, RF gun phase 268 dg. ==> 272 dg., Sect. phase 211 dg., Sect. Att. 2.35 dB. Linac sreerers H [0.74 -2.98],
V [-2.56 3.0], Charges (BPMs) -112, -107, -112, -110 pA |
Entered by Super Team from 134.158.195.141 on Tue Nov 25 09:31:46 2025;
|
09h31 Warm-up ThomX: Modulator, Laser, Fridge
09h36 Chillers were started, cycling all magnets.
09h56 Unable to start MRSV and EL cameras. Need help. |
ND + JM + HG; Prise de données 24/11
|
9:15 Mise en chauffe
9h30 Arrivée du SPR: testsSSI ce matin => pas de faisceau avant midi => machine off
12h30 Mise en chauffe,cyclage aimants |
KD MJ DN Students; shift du 21 novembre 2025  
|
8h: mise en chauffe en remote (modulateur, frigo/chillers, laser, cyclage)
9h: start
Recette chargée: 50MeV_100pC_MRSV_20251014_18_22_53 |
VM, IC; BBA Ring 
|
Goal: Ring BBA
09h14 Unable to start thomx. Need help. Probably problem with cooling water.
12h35 |
HG + JM + ND (aprem); Shift mesure Twiss + Simu 7x
|
8:30 : demarrage à distance
12:10 : QP7 Scan 1 (Phase section 210) optimum sur ligne dispersive |
HG, JM, ND; Prise de données 18/11
|
9h Intervention laser
Intervention pour realignement el/dg/sst.01
11h Fin interventions demarrage machine |
KD; shift du 18 novembre 2025
|
7h50: mise en chauffe en remote de la machine (laser, frigo/chiller, cyclage)
==> le modulateur ne répond pas aux commandes (il est peut être en local) ==> Ok le modulateur était bien en local
(Maher est intervenu) |
KD MJ VM HG; shift du 13 novembre 2025 - spectres a differentes valeurs de bpmTL2_X
|
Apres que Kevin a regle tous les problemes synchro signal bpm etc etc etc
L'interface SST ne fonctionne pas - URGENT ==> probleme resolu
Libera 2 et 4 reboote une 2eme fois ... |
Entered by Super Team from 134.158.76.9 on Wed Nov 12 10:29:34 2025;
|
15h09 Cycling all magnets
15h12 HV is ON
15h15 The modulator was set to standby |
KD, M2 GI; shift du 10 novembre 2025
|
8h: mise en chauffe en remote (modulateur, laser, frigo/chiller)
10h: Démarrage machine
|
Entered by Super Team from 134.158.205.4 on Fri Nov 7 18:45:38 2025;  
|
08h34 Warm-up ThomX: Modulator, Laser, Fridge
08h40 Chillers were started, cycling all magnets
09h40 HV is ON but cannot trig because the interlock on low SF6 pressure. Assistance asked. |
Entered by Super Team from 134.158.195.141 on Thu Nov 6 08:30:37 2025; 
|
08h30 Warm-up ThomX: Modulator, Laser, Fridge
08h36 Chillers were started, cycling all magnets
09h33 HV is ON |