Entered by Super Team from 127.0.0.1 on Wed Jul 8 07:49:04 2026;
|
| 07h50 Start-up modulator, laser, fridge, chillers, cycling remotly |
Entered by Super Team from 127.0.0.1 on Wed Jul 1 11:24:31 2026;
|
|
Entered by Super Team from 127.0.0.1 on Tue Jun 30 09:48:28 2026;
|
Maher started the modulator
9h50 HV is on
09h53 Beam is in the ring w/o RF |
VC; redpitaya
|
Les redpitaya baie 17 'RF" ne "communiquent" plus avec JIVE.
IL faut les redémarrer... je ne sais pas faire!
Nicolas passe en fin de matinée pour essayer de les redémarrer |
IC, VM; Restart of the accelerator
|
07h30 Start-up modulator, laser, fridge, chillers, cycling remotly
Vacuum in the FPC is still ~1e-7 (sometimes goes to ~7-8e-8);
No RF signals. The same problem. |
IC, VM; Restart of the accelerator   
|
08h26 Start-up modulator, laser, fridge, chillers, cycling
09h31 Low SF6 pressure => JN helped
11h HV ON. We do not see the RF signals, even the baselines (RedPitaya). |
Entered by Super Team from 127.0.0.1 on Tue Jun 23 09:43:18 2026; Vaccum in the FPC
|
09h00 Start-up modulator, laser, fridge, chillers
After discussion with Daniele
Goal/Priority: Check for leakage in the FPC |
IC, VM; Restart of the accelerator
|
09h35 Start-up modulator
09h52 Start the fridge
09h55 Start chillers |
IC, VM; Ring working point studies
|
07h35 Start-up modulator (does not go to standby), laser, magnets, cycling.
9h50 HT ON
~10h30 Electricity cut |
IC, VM; Restart of the accelerator 
|
08h35 Start-up modulator (it was already on standby), laser, magnets, cycling.
As yesterday there is a problem with the MPS to start the machine. We are trying to investigate whether it is related to the vacuum or something
else. |
Entered by Super Team from 127.0.0.1 on Tue Jun 16 13:43:02 2026;
|
Hello,
I short-circuit the MPS input to modulator, we can trig modulator, the klystron filmant time goes to full time , need 45 min, you can start at 14:35 |
IC, VM; Restart of the accelerator
|
11h20 Try to restart the accelerator. Start-up modulator, laser, fridge, chillers
Problem, with all magnets control All DS are in FAULT state. Help is needed.
It is solved. |
Kevin D.; Laser PC status
|
mise à jours du post : https://elog.lal.in2p3.fr/THOMX/Commissionning/1188
** Laser PC ***
- Sortie Laser: 120 uJ |
Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026;
|
10h02 Start-up modulator, laser, fridge, chillers
The SF6 pressure is low. Magnet power supplies filed to start.
11h17 Stop ThomX |
IC, VM; Restart of the accelerator 
|
08h45 Start-up modulator, laser, magnets
09h38 Shutter Laser Linac is yellow. Tuning off the gun operation key does not change it to the red. Need help.
09h55 HV is on |
IC, HG, JNC; Restart of the accelerator
|
02/06/2026
~15h30 Starting all system
16h Start up of the modulator, laser, magnets |
Entered by Super Team from 127.0.0.1 on Wed May 13 08:35:01 2026; manip Gplast
|
demarrage machine 8h30
faisceau ok vers 10H
14h mesure 50 MeV |
Entered by Super Team from 127.0.0.1 on Tue May 12 08:42:31 2026; manip Gplast
|
Demarrage machine 8h40
pB reflechi canon... temp consigne 27.7C
10h50 redemarrage chiller gun ... |
Vincent; Manip Gplast
|
9h30 test radioprotection OK (mesure en dessous du bruit de fond)
13h30 fenetre installée pompage en cours
14h fin de l'intervention |
Entered by Super Team from 127.0.0.1 on Fri Apr 24 08:05:02 2026; , entered from 127.0.0.1
|
| 8h00 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage) |