Entry   Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025;  Screenshot_from_2025-11-05_17-49-33.pngScreenshot_from_2025-11-05_17-51-14.pngScreenshot_from_2025-11-05_17-50-44.png
Matin :

Soucis synchro :
- Nicolas les a redémarré
Entry   Entered by Marie Jacquet from 134.158.205.9 on Thu Oct 30 07:21:05 2025; Programme shift (X-rays spectres vs atte & phases) 
08h17 Warm-up ThomX: Modulator, Laser, Fridge

08h24 Chillers were started, cycling all magnets

09h18 HV is ON
Entry   Entered by Super Team from 134.158.195.141 on Tue Oct 28 08:40:06 2025;  Screenshot_from_2025-10-28_11-48-31.pngScreenshot_from_2025-10-28_11-47-12.pngScreenshot_from_2025-10-28_11-46-55.pngScreenshot_from_2025-10-28_15-34-03.png
08h40 Warm-up ThomX: Modulator, Laser, Fridge

08h45 Chillers were started, cycling all magnets

09h45 HV is ON
Entry   Entered by Super Team from 134.158.195.141 on Fri Oct 24 08:33:07 2025;  
08h32 Warm-up ThomX: Modulator, Laser, Fridge

08h37 Chilers were started, cycling all magnets

09h38 HV is ON
Entry   KD RC VC MJ; shift du 23 octobre 2025 
7h45: mise en chauffe en remote (modulateur, laser, frigo/chillers, cyclage)
8h45 : mise en route Modulateur
recette "50MeV_smallorbit_with EL_20251016_19_49_25.txt"   fichier VIDE
Entry   HG, DN. VM, MJ;  mrsv_2_positions_fente.png
11h40 Thomx warm-up

12h35 HV is ON

12h40 HV 1215 V
Entry   MO VC ND VM; Shift summary 
demarrage machine 8H35
9H45 hV on 1215V
Q linac 100pC
Entry   KD, IC, VM; shift du 16 octobre 2025 6x
7h30: mise en chauffe en remote (chillers/frigo, laser, cyclage)

==> impossible de passer en Standby sur le modulateur ==> mail envoyé à Maher.

8h30 We inspected the modulator, made the rondes. The error (status 8 bit) remains. Need for help from Maher. problem: Modumator PSS.
Entry   KD; shift du 14 octobre 2025 8x
7h55: mise en chauffe en remote (laser, frigo/chiller, modulateur, cyclage)

==> Nouvelle interface de cyclage, on ne voit plus la progression ou l'état des éléments. (impossible de savoir si
le cyclage à bien fonctionné)
Entry   Hayg; Emittance QP3  
QP3 scan

vary Soleno
Iris 1mm ATT 400 (150 pC)
Entry   ND, VM; Prise de données 10/10  7x
9:00 Mise en chauffe

9:20 Intervention de deux personnes de Dalkia dans l'igloo. 

9h30 Cyclage aimants
Entry   Entered by Super Team from 134.158.195.141 on Thu Oct 9 08:37:29 2025; Shift "du Jeudi" : VM/HG/KD/DN/RC Screenshot_from_2025-10-09_16-57-23.pngScreenshot_from_2025-10-09_16-50-25.pngScreenshot_from_2025-10-09_16-50-12.pngScreenshot_from_2025-10-09_17-17-57.png
09h35 Warmup ThomX

09h40 Cycling all magnets

09h50 Start Chillers
Entry   ND VC; Shift summary 
Demarrage machine 9H

test cyclage: OK (relecture courant parfois NAN)
Correction des fenetre d'intégration de mesure de charge des ICTs
Entry   Entered by Super Team from 134.158.195.141 on Thu Oct 2 08:31:43 2025;  
08h30 ThomX warm-up

08h37 Cycling all magnets

10h20 HV is ON
Entry   KD, IC, VM; shift du 1e octobre 2025 Capture_d’écran_2025-10-01_074548_IHM_cyclage.png
7h40: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage)

==> IHM cyclage très longue à lancer, (a planté hier, pas aujourd'hui), des nan apparaissent (cf. screenshot)

08h45 Start modulator
Entry   KD; shift du 30 septembre 2025 
8h40: mise en chauffe en remote (frigo/chiller, modulateur, laser)

9h30: ajout de graisse sur le verrin du shutter Xline dans la casemate

9h45: le klystron ne passe pas en HV, gros problème de perverance aussi (impossiblde de passer à 1215V)
Entry   ND; Verifications IHM_cyclage 
9:00 Accès pour FPC

Recherche des problemes de plantage de l'IHM cyclage.

Plantages difficiles a reproduire (pas de plantage quand j'essaie).
Entry   KD, VM, IC; shift du 25 septembre 2025 Screenshot_from_2025-09-25_12-16-58.pngScreenshot_from_2025-09-25_17-43-12.pngScreenshot_from_2025-09-25_17-05-57.png
8h05: mise en chauffe en remote de la machine (modulateur, frigo/chiller, laser)

==> cyclage aimant plante, donc aimant non allumés ni cyclé.

9h All keys are in vertical position. Totes rondes sont tombees. We need help to restart.
Entry   DN, KD, ND; Prises de données MRSV et Streak camera 
Matin: Alignement.

Apres midi tentative de voir du faisceau en salle laser.

Faisceau tres faible.
Entry   KD; shift du 19 septembre 2025 
7h50: mise en chauffe en remote (modulateur, frigo/chiller, laser, cyclage)

==> plantage cyclage entre les QP Ri-C1 et Ri-C2