Entry   IC, HG, JNC; Restart of the accelerator 
02/06/2026

~15h30 Starting all system

16h Start up of the modulator, laser, magnets
Entry   IC, VM; Restart of the accelerator GunCharge_vs_LaserAtt.pngGunDarkCurrent_vs_Att.png
08h45 Start-up modulator, laser, magnets

09h38 Shutter Laser Linac is yellow. Tuning off the gun operation key does not change it to the red. Need help.

09h55 HV is on
Entry   IC, VM; Restart of the accelerator 
11h20 Try to restart the accelerator. Start-up modulator, laser, fridge, chillers

Problem, with all magnets control All DS are in FAULT state. Help is needed.

It is solved.
Entry   IC, VM; Restart of the accelerator Screenshot_from_2026-06-17_15-54-18.pngScreenshot_from_2026-06-17_15-50-21.png
08h35 Start-up modulator (it was already on standby), laser, magnets, cycling.

As yesterday there is a problem with the MPS to start the machine. We are trying to investigate whether it is related to the vacuum or something
else.
Entry   IC, VM; Restart of the accelerator 
09h35 Start-up modulator

09h52 Start the fridge

09h55 Start chillers
Entry   IC, VM; Restart of the accelerator Screenshot_from_2026-06-26_15-41-00.pngIMG-20260626-WA0001.jpgScreenshot_from_2026-06-26_16-07-50.pngScreenshot_from_2026-06-26_17-17-00.png
08h26 Start-up modulator, laser, fridge, chillers, cycling

09h31 Low SF6 pressure => JN helped

11h HV ON. We do not see the RF signals, even  the baselines (RedPitaya).
Entry   IC, VM; Restart of the accelerator 
07h30 Start-up modulator, laser, fridge, chillers, cycling remotly

Vacuum in the FPC is still ~1e-7 (sometimes goes to ~7-8e-8);

No RF signals. The same problem.
Entry   IC, VM, VK; Restart and tuning of the injector Screenshot_from_2024-03-05_15-13-48.png
10h Intervention to repair the water leakage. It was repaired.

New problem with vacuum pomp is found in the ring. The two problems are due to the water leakage. Intervention is ongoing.

12h Warm up of the machine
Entry   Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026; Restart after strange last shift  
12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen put last motor positions (2266 && 4158) --> No spot on screen :(
13h05 : Gun activities incresed (Vac > 1e-7 && reflected power)
Entry   ND, Marie Labat; Reglage Cerenkov 29/9 health_check_2023_09_29_11_58.pngscan_Laser_vs_RF_phase_2023_09_29_12_02.png
9:07 Mise en chauffe

Verifucation Alignement laser

Maher: changement de dosimetres
Entry   VK, IC. VM; Reestablishing running conditions at 500.38 MHz scan_charge_phase_min_0.0_max_360.0_14_32_59.pngScreenshot_from_2023-06-12_15-23-07.pngScreenshot_from_2023-06-12_15-40-14.pngScreenshot_from_2023-06-12_17-38-24.pngScreenshot_from_2023-06-12_17-32-48.png
Goal of the shift: Reestablish the good storage at 500.38 and then try to optimize the storage and orbit.

Start up of the machine.

RF cavity start up by Mohamed. Water leakage. Jean-Noel will fix tomorrow mornig. Mohamed also says that aparently the sinal from ring syntetizer
Entry   Entered by Nicolas Delerue from 134.158.88.175 on Mon Sep 27 14:46:15 2021; Redémarrage suite coupure Électrique, entered from 134.158.88.175 Capture_2021-09-27_14.43.51.png
Bonjour,

Selon Astor, il y a encore des problèmes sur les clients 1, 5, 6 et 7...
Entry   ND; Redémarrage diags + synchro health_check_Diag_2024_01_11_14_54.pnghealth_check_2024_01_11_14_55.png
Pour la synchro, les generateurs de retard ont ete redemarres.

Pour les diags: redemarrage de icePapControllerB6 et Wavecatchers.

Signal OK (sans faisceau) sur BPM, ICT et sur ecrans.
Entry   ND/PG/JNC/MO/SC/VC/NE; Redémarrage ThomX 
Bonne Année à tous !

Redémarrage de ThomX

- Mise en route du CC (PG, JNC)
Entry   Entered by Nicolas Delerue from 134.158.88.175 on Mon Sep 27 14:46:15 2021; Redémarrage suite coupure Électrique 
Bonjour,

Selon Astor, il y a encore des problèmes sur les clients 1, 5, 6 et 7...
Entry   SC/JNC/VC; Redémarrage ThomX ping_automate.pngcamera_lidgsst.01.pngrf_gun_ihm.pngsrv4_astor.pngredpitaya_ihm.png
8h53 Serveur DNS et DHCP non redémarré, ping ne fonctionne pas, en attente d'une solution

Re-démarrage automate et cpci (JNC)

14h13 ping sur automate ok
icon8.gif   Entered by VC/SC from 134.158.195.141 on Mon May 2 14:02:42 2022; Redpitaya et modulateur 
Remise en chauffe du modulateur

Reboot des redpitayas pour avoir le signal HF sur l'IHM

En attente de la fin de chauffe du modulateur
Entry   MJ HG; Redemarrage machine apres probleme de synchro et/ou alim ICT.pngbpmLI.png
Apres un OFF/ON des baies alim et des transfo + baie synchro OFF/ON la synchro semble etre de nouveau alive

16h15 Chauffe Klystron

ICT bpm et yag semblent ne pas se declencher au bon moment
icon4.gif   Entered by Super Team from 134.158.195.141 on Fri Nov 5 09:35:02 2021; Redemarrage 05/11 9h35 
Après coupure électrique de cette nuit. Rédemarrage de tous les systèmes :

Général:

 - toutes les baies sont allumées
Entry   Entered by Super Team from 134.158.195.141 on Mon Mar 4 08:57:45 2024; Recomissioning of the SR, search for the revolution frequency  
08h50 Start up of the machine

- Problem  with the vaccum, the valves around the RF cavity are down. Eric came. He checked and the problem is with the cable. it should
be changed. Intervention is ongoing.