Message ID: 1252     Entry time: Fri Jun 26 08:27:22 2026
 Author: IC, VM 
 Status: Under Process 
 Type: Problem 
 Category: LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning 
 Important:
 Subject: Help!!!! 
 Icon:  

08h26 Start-up modulator, laser, fridge, chillers, cycling

09h31 Low SF6 pressure = JN helped

11h HV ON. We do not see the RF signals, even  the baselines (RedPitaya). The Wevecatchers are also not triggered. probably problem with timing or their configs. Help is needed.

Apparently, there was the electricity cut. Help is also needed with the RF cavity.

12h10 something happened. Modulater went to OFF, dipoles are in error state. The valves became orange on the PSS screen.  Help is needed !!!

 