Entry   VK, VM, IC; Recomissioning of the SR, search for the X-rays Screenshot_from_2024-03-07_09-02-36.png
8h50 Warming up the machine

Problem with the vaccum around the RF cavity (see screenshot attached). Intervention of vacuum team is needed.

Mohamed is installing the powermeter to monitor the incomingt RF power for the accelerating structure.
Entry   VC, DN, MJ, IC, VM; Recherche position image camera MRSV 2025-04-30_16-23-33_MRSV_fwhm_trends.png2025-04-30_17-14-26_total_beam.png2025-04-30_17-15-03_coupe_moitie_basse.png2025-04-30_17-15-54_coupe_moitie_haute.png
Start chauffage 9H

There were some problems: the phase section motor was in the wrong position, although the readings were normal; The rear door of the septum
power supply was not fully closed.
Entry   Entered by Super Team from 134.158.195.142 on Wed Nov 17 14:00:15 2021; Recherche du signal ICT après la section 2021-11-17_14_19_8_scan_charge_phase_TL1.jpg2021-11-17_14_20_22_scan_charge_phase_Li.jpg
Alexandre Moutardier :

Signal ICT (ER/CA/RAC.05-ELR.01-WAC.02 channel CH3) pas visible après la section bien que le faisceau passe au vu des signaux
sur le BPM et l'écran.
Entry   Entered by Moutardier Alexandre from 134.158.195.142 on Mon Feb 14 10:11:53 2022; Recette synchro 
Nouvelle recette synchro par défault enregistré : 20220201_reference.xml

A tester en faisceau dans la journée.

Ne pas en utiliser d'autre !
Entry   Entered by SC/HM/VC from 134.158.195.141 on Fri Feb 11 14:15:43 2022; Recette 
Recette sauvée : 20220211_1417.xml
Entry   Entered by sophie chance from 134.158.195.142 on Tue Oct 12 15:35:55 2021; Radioprotection 
Mesures radioprotection en cours
Entry   IC, VM, VK, ND; RIng commissioning 10x
8:50 Mise en chauffe

10h Starting the beam

Tuning of the TL
Entry   VK, IC; RF frequency of the Ring scan_charge_phase_min_0.0_max_360.0_10_43_35.pngScreenshot_from_2023-05-19_13-50-56.pngScreenshot_from_2023-05-19_13-56-41.pngScreenshot_from_2023-05-19_12-15-50.png
In the morning, after the start-up pf the machine, scan phase-charge and small tuning it was possible to store the beam with the settings from previous
day.

The storage was optimize withthe dipole current of 159.9 (best storage up to now). RF cqvity voltqge 20-100 kV.
Entry   MJ, KD; RF et anneau 24_4mm.png22_4mm.png
Apres 18h30 : prise ne main de la machine pour aller dans la LE ==> le kicker d'extraction est interlocké (abdandon) 

Essaie avec la derniere recette de l'anneau : à 159.3A le stockage n'est pas tres bon (cavité OFF)

On essai de jouer sur le plongeur pour accorder la cavité à la fréquence de révolution du paquet (voir 2 screenshot
Entry   VM, HG, RC, SC; RF conditionning : 2 aout  
Start from 10 dB 

decrease up to 1 dB : Vacuum is OK decrease up to 10â»8 mBar

11h10 : att.sec 0.7 dB ==> vide in section 1.1 10-8 mbar & vide out section 8 10-9 mbar 
Entry   Entered by sophie chance from 134.158.195.141 on Thu Oct 28 12:24:58 2021; RF + 5Hz + Solenoides 
Augmentation progressive du solenoide à 5Hz en cours
    Reply   Entered by Moutardier Alexandre from 91.168.92.148 on Thu Dec 16 10:39:49 2021; RE: test en ssh 
Modifications faites, testées et fonctionnelles.




Entered
by Moutardier Alexandre from 91.168.92.148 on Thu Dec 16 10:39:49 2021 wrote:



Connection
    Reply   ND; RE: shift du 20 février 2023 pb_vide_hc.pngpb_vide_atk.png
Healthcheck signal effectivement un probleme sur toute les vannes...  Et les atkpanels signalent un problème de communication... Est-ce que
l'expert correspondant a été prévenu?

 
    Reply   ND; RE: shift du 20 février 2023 Capture_d’eÌcran_2023-02-20_aÌ€_10.15.37.png
Healthcheck signal effectivement un probleme sur toute les vannes...  Et les atkpanels signalent un problème de communi




KD
wrote:



8h30 : Mise en chauffe de la machine (frigo, chiller, laser, modulateur)
    Reply   Entered by Marie Jacquet from 134.158.195.141 on Mon Feb 13 13:34:44 2023; RE: problemes avec SST et YAGLI 
1) Je viens de tenter de reproduire le problème. Il est normal que cela mette du temps à charger, surtout au premier allunage de la journée
(initialisation des caméras).

2) Cette image montre l'écran YAG qui est inséré comme on peut le voir sur la lecture de position du moteur. Les LEDs
    Reply   ND; RE: phase en delire 
Après un premier scan sur 0-360 degres le script lance un second scan sur la zone la plus probable de maximum de charge pour trouver plus précisement
le meximum de charge. Il met ensuite la phase au maximum de charge - 50 degres ce qui correspond à peu prêt au maximum d'énergie.




MJ
    Reply   Entered by Super Team from 134.158.195.141 on Tue Feb 15 17:37:50 2022; RE: nouvelle position miroirs 
Fin du run : 18h50.

Machine OFF




Entered
    Reply   Entered by Viktor Soskov from 134.158.195.153 on Tue Feb 1 10:43:30 2022; RE: logiciel ihm 
Salut Viktor,

le Ds du Laser était arreté. C'est ok maintenant.

H
    Reply   ND; RE: ecrans yag 1 et 2 desinchro 
Je viens de regarder LI/SST.01 et TL/SST.01 étaient en attenuation maximale. Si le problème se reproduit, il faut cliquer sur "Full
intensity" sur l'IHM SST.





.MJ
    Reply   Entered by Moutardier Alexandre; RE: camera TL/SST2 + fente 
Voici une mise a jours concernant les fentes :
- L'IHM fente est trouvable dans PlateformeIHM
- Les positions 0 des moteurs correspond a l'insertion des fentes la plus importante possible (Attention, switch