Entry   Entered by Super Team from 134.158.195.141 on Wed May 11 18:32:20 2022; Run machine : JNC/HG 2022-05-11_18_45_12_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_350.png2022-05-11_18_51_09_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_350.png2022-05-11_19_01_22_li_op_las_02_Iris1.5mm_log_scale_False_despeckle_False_min_scale_0_max_scale_300.pngScreenshot_from_2022-05-11_21-15-19.pngScan_pos_phase_LIL__at_11-05-2022__21-34-50.png
But du run :

refaire le transport jusqu'au DUMP en vérifiant le transport (steerers entrée section).
 
Entry   Entered by Super Team from 134.158.195.141 on Thu Dec 2 14:54:39 2021; Run Linac alignement  2021-12-02_14_59_31_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_25.pngcharge_phase__at_02-12-2021__15-32-58.jpg
Laser:

Viktor est intervenu pour tourner le hublot afin d'améliorer la distribution du spot laser sur la photocathode. La stabilité
reste très bonne.

Energie : on est revenu à 50 µJ
Entry   Entered by Super Team from 134.158.195.141 on Wed Dec 8 15:10:57 2021; Run Linac alignement laser_8Dec_16h40.pngRedpitaya_08Dec.png
Operateurs : EG, HG

but : travailler sur l'alignement de la tete de machine

Laser :

Spot pas bien défini, toujours probleme avec le hublot.
Entry   KD, HG; Run Linac  
 

Energie laser : 240 µJ en sortie Laser
Si la charge est basse il faut donc revoir la ligne de transport
Entry   IC, VM; Ring working point studies 
07h35 Start-up modulator (does not go to standby), laser, magnets, cycling.

9h50 HT ON

~10h30 Electricity cut
Entry   IC, VK, VM, ND; Ring studies, MRSV 36x
07h50 Start ThomX

09h20 HV is 'ON'

09h25 HV  1215 V
Entry   IC; Ring studies Screenshot_from_2026-01-15_11-04-16.pngScreenshot_from_2026-01-15_11-33-33.pngRi_C1_Quads_is_off_Screenshot_from_2026-01-15_18-19-14.pngScreenshot_from_2026-01-15_16-42-27.pngScreenshot_from_2026-01-15_17-36-28after1LOCO.png
08h56 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.
Low SF6 pressure. 
Entry   IC, VM; Ring studies 
7h45: mise en chauffe en remote (modulateur, cyclage, laser, frigo/chillers)

08h43 HV is on

RF gun phase (laser phase) for maximum charge is out of the range, close to 360 dg. or 10 dg. Help is needed! 
Entry   IC; Ring studies 
9h40: mise en chauffe (chillers/frigo, modulateur, cyclage)

HV ON

The ICT signal (GUN) is frozen. Need help to restart it. Use the BPM SpSum instead.
Entry   Entered by Super Team from 127.0.0.1 on Wed Mar 25 07:28:09 2026; Ring studies 
7h30 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)

08h40 HV ON

==> 50 MeV, Manual phase shifter value set to 3209. Sect. temperatute set to 30C at clarinette, (consigne = 29.2C).
Entry   LS, ND, IC, VK; Ring operation 16/5 health_check_2023_05_16_12_02.pngscan_charge_phase_min_0.0_max_360.0_12_8_7.png2023-05-16_12_13_52_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngring_storage_quality__2023_05_16_16_06.png
9:33 Start warming up

9:45 Ducre is working on the plumbing but it shuld not affect operations

11:00 Intervention JNC pour problemes refroidissement
Entry   ND, LS, IC, VK, VM, SW; Ring operation 15/5 7x
10:00 Machine warm up

Magnets cycling

11:00 Start machine
Entry   VK, VM, IC, KD; Ring commissioning 7x
Start of the machine by KD

11h20 The beam is in the ring

Optimization of the injection with the RCDS
Entry   Ring team; Ring Working Points 50 MeV/ 61.5 MeV / 70 MeV 8x
50 MeV

Configuration: good_20250123_17_53_01 "Working Point at 50 MeV for X_rays"

After RCDS optimization with X-rays good_20250124_15_05_25 "Updated WP with RCDS on X-rays 50 MeV "
Entry   VM, IC; Ring BLM and charge linearity 6x
Goals: 

- Work on the BLM to have the signals at the injection and from the arc in the ring.

- Study on the ring injection and beam storage at higher beam charge. Check the linearity.
icon1.gif   Entered by Hayg Guler from 134.158.195.141 on Tue Nov 9 18:30:22 2021; Resumé du jour  
Shift consacré à la calibration des moniteurs de pertes ainsi qu'à l'allignement de la tete de machine (Laser + Solénoide)



 Solénoide
:



cables de l'encodeur des moteurs LI/AE/COL.01(02)-MOT.01 étaient intervertis,
Entry   Entered by Sophie Chance from 134.158.195.142 on Thu Jun 10 17:40:23 2021; Resume shift 100621 
Tests RFs réalisés : difficultés avec le signal du réfléchi, la forme du signal est étrange.

Nous sommes passés de 500 ns à 2us de largeur de pulse.

Boite C mise en place sur le coupleur mais le signal n'est toujours pas celui attendu
Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Jan 16 11:57:39 2025; Resultats Tour de cle Q1-Q3 - Shift 15/01 Tour_de_cle_Q1Q3.png
Prise de donnees axe Q1Q3 du 14/01

Steerers  Axe q1q3     : str1[H V] = [2.45 -1.83]  
                                     
Entry   Entered by Super Team from 134.158.195.141 on Thu Nov 2 16:51:56 2023; Restauration Base de donnée TANGO 
Restauration de la base de donnée TANGO faite aujourd'hui.

Tests des DSs prévus demain matin. Redémarrage des DSs nécessaires avant via astor.

 
Entry   VK, VM, IC, LS; Restart storage in the Ring 
~9h Start of the modulator

10h Tuning of the injector with KD

11h Try to inject in the ring. Only 1-2 turns after optimization. We tried previous injector settings, the situation is the same. We retuned