HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX  Not logged in ThomX    logo
This is a draft message, edit and submit it to make it permanent  
Message ID: 1242     Entry time: Wed Jun 3 08:41:41 2026
 Author: IC, HG, JNC 
 Status:  
 Type: Shift summary 
 Category:  
 Important:
 Subject: Restart of the accelerator 
 Icon:  

02/06/2026

~15h30 Starting all system

16h Start up of the modulator, laser, magnets

Problem with the shutter, it is in the orange state. 

ELOG V3.1.4-395e101