Message ID: 853     Entry time: Mon Mar 4 08:58:01 2024
 Author: Entered by Super Team from 134.158.195.141 on Mon Mar 4 08:57:45 2024 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring | Ring Commissioning 
 Important:
 Subject: Recomissioning of the SR, search for the revolution frequency  
 Icon:  

08h50 Start up of the machine

- Problem  with the vaccum, the valves around the RF cavity are down. Eric came. He checked and the problem is with the cable. it should be changed. Intervention is ongoing.

- The water leakage is detected on teh Ring RF cavity. Intervention of Mohamed and Jean-Noel is needed. Jean-Noel is informed  about the problem.

- Synchro problem. Jitter at FPCavity scope screen. Vincent is working on that.