HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Notes concernant la preparation du Commissionning, Page 2 of 3  Not logged in ThomX    logo
Entry   VK, IC, VI, JH, ND; Summary of the ring commissioning meeting #4 
Entry   IC, VK, VI (ND); Summary of the ring commissioning meeting #3 
Entry   VK, IC, AM, ND; Summary of the ring commissioning meeting #2 
Entry   IC, VK, VI, VC, JH, HG, ND; Summary of the ring commissioning meeting #1 
Entry   VK, IC, VM, JH, ND; Summary of the ring commissioning meeting 
Entry   VK, IC, VM, JH, KD, ND; Summary of the ring commissioning meeting 
Entry   IC, VK, VM, SC, ND; Summary of the ring commissioning meeting 20_injections.jpg
Entry   VK, VM, SC, ND, HG; Summary of the ring commissioning meeting 
Entry   VK,IC, SC, VM, ND; Summary of the ring commissioning meeting 
Entry   VM, VK, ND; Summary of the ring commissioning meeting 
Entry   IC, VM, SC, JH, VC, ND; Summary of the ring commissioning meeting data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png
Entry   IC, VK, VM, JH, ND; Summary of the ring commissioning meeting 
Entry   IC, VK, LS, JH, ND; Summary of the ring commissioning meeting 
Entry   VK, IC, JH, VM, LS, MB, ND; Summary of the ring commissioning meeting 
Entry   IC, VK, VM, LS, JH, MB, ND; Summary of the ring commissioning meeting 
Entry   IC, VK, VM, LS, JH, SC, ND; Summary of the ring commissioning meeting 
Entry   VK, IC, LS, ND; Summary of the ring commissioning meeting 
Entry   ND, IC; Steerers and BPM map for the ring BPM_ring.pngBPM_ring.pptx
Entry   ND; Réunion Physique ThomX 
Entry   IC, VK, VI, VC, JH, HG, ND ; Ring objectives 
ELOG V3.1.4-395e101