  37   Mon Oct 17 10:02:07 2022 VK, IC, VI, JH, SC, NDReference SolutionInforesumes Summary of the ring commissioning meeting #5 See slides attached to the indico page
https://indico.ijclab.in2p3.fr/event/8885/

Pb with BPM => visual check
  
  13   Thu Dec 10 14:43:07 2020 Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020Not FixedProblemproblemes Clients 1, 4 et 5 non fonctionnels En complément du message de Hayg,
client 4 et 5 ne fonctionnent pas non plus
(en plus de client 1).
  
  26   Mon Sep 19 15:56:28 2022 IC, VK, VI, VC, JH, HG, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #1 Status slides presented by Iryna available
on indico at https://indico.ijclab.in2p3.fr/event/8749/

The beam parameters required for
  
  27   Mon Sep 19 16:29:06 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees Ring objectives This entry is to be updated as the work
progresses.

1) Re-establish beam transport
  
  29   Mon Sep 26 09:39:15 2022 VK, IC, AM, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #2 Slides are at https://indico.ijclab.in2p3.fr/event/8750/

- There is a difference in BPM
numbering in Tango and MML => we should
  
  30   Mon Sep 26 10:21:20 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: Ring objectives (1),  (2), (4) and (5) from last week
have been done other items in progress.

New to do list:
  
  33   Mon Oct 3 17:29:53 2022 IC, VK, VI (ND)New SolutionInforesumes Summary of the ring commissioning meeting #3 
Shift summaries for the ring for last
week are at

https://elog.lal.in2p3.fr/THOMX/Commissionning/568

https://elog.lal.in2p3.fr/THOMX/Commissionning/570

  
  34   Wed Oct 5 09:51:12 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: RE: Ring objectives New to do list:

(0) Re-establish beam transport
to ring
  
  36   Mon Oct 10 10:37:43 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: RE: RE: Ring objectives To do list:

(0) Re-establish beam transport
to ring
  
  38   Mon Nov 7 23:53:29 2022 VK, IC, VM, JH, NDNew SolutionInforesumes Summary of the ring commissioning meeting Discussed recent orbit correction of
the expanded orbit. 

Need
to make run with  cavity detuning from
  
  39   Mon Dec 5 10:05:11 2022 VK, IC, VM, JH, KD, NDNew SolutionInfoanalyse Summary of the ring commissioning meeting The ring orbit has been re-established
despite some difficulties after the shutdown.

The ring cavity has been started.
  
  41   Tue Dec 6 00:15:55 2022 NDNew SolutionInfoanalyse RE: Summary of the ring commissioning meeting Regarding the remote control of the RF
synthetizer: it can only be controlled via
GPIB and RS-232.
  
  42   Mon Jan 9 10:12:40 2023 IC, VK, VM, SC, NDNew SolutionInforesumes Summary of the ring commissioning meeting Notes from last week:


Beam was very unstable
(probably energy instabilities), lot of time
 20_injections.jpg 
  43   Mon Jan 16 09:38:16 2023 VK, VM, SC, ND, HGNew SolutionInforesumes Summary of the ring commissioning meeting Summary of last week:

- On Thursday the beam energy was
very different from usual (magnets current
  
  44   Mon Jan 23 09:54:14 2023 VK,IC, SC, VM, NDNew SolutionInforesumes Summary of the ring commissioning meeting No beam last week. No beam this week.

Machine recovery on 2/2 => Nicolas
may try to tune the machine with students.
  
  45   Tue Jan 24 10:14:20 2023 NDNew SolutionInfoPrise de donnees Notes from ThomX Physics meeting Present: IC, VK, VM, VC, SC, MEK, KD, MJ,
HG, ND, MO (sous réserve d'oublis)

Visio: CB
  
  46   Thu Feb 9 12:16:41 2023 NDNew SolutionInfoPrise de donnees Verification variables pour l'anneau L'IHM de verification des variables
pour l'anneau a ete mis a jour.

Il est accessible dans plateforme
 ring_vars_2023_02_09_12_15.png 
  47   Mon Feb 20 10:06:36 2023 VM, VK, NDNew SolutionInforesumes Summary of the ring commissioning meeting This week: beam on Thursday.

So far we did not see any screenshot
of Ring variables check.
  
  48   Fri Feb 24 10:34:58 2023 NDNew SolutionInfoPrise de donnees RE: Notes from ThomX Physics meeting Présent: VK, SC, KD, MJ, HG, ND

Présentation par Marie.
Cf indico https://indico.ijclab.in2p3.fr/event/9242/
  
  49   Mon Mar 13 09:39:39 2023 IC, VM, SC, JH, VC, NDNew SolutionShift summaryanalyse Summary of the ring commissioning meeting Excitation (betatron oscillation) on the
beam observed by exciting it with the extraction
kicker => initial measures of the tune.
 data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png 