ID Date Author Statusdown Type Category Important Subject Icon Text Attachments
  50   Mon Mar 20 10:08:24 2023 IC, VK, VM, JH, NDNew SolutionInforesumes Summary of the ring commissioning meeting - Went up to 100kV in the cavity once it
was tuned.

- Achieved nice storage stable
  
  51   Thu Mar 23 12:29:05 2023 NDNew SolutionInforesumes Réunion Physique ThomX Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/

Quelques notes de la réunion
de Physique de ThomX:
  
  53   Mon May 22 10:05:30 2023 IC, VK, LS, JH, NDNew SolutionShift summaryanalyse Summary of the ring commissioning meeting === Summary of last week:

- Frequency was reduced to 500.0202MHz
but the beam stayed only for 100s of turns
  
  54   Tue May 30 10:12:30 2023 VK, IC, JH, VM, LS, MB, NDNew SolutionInfoanalyse Summary of the ring commissioning meeting Main studies:

- Measure bucket width in phase
on Thursday at 500.02MHz => no storage
  
  55   Fri Jun 9 19:57:14 2023 KDNew SolutionInfoPrise de donnees Mise en place Ligne X Aujourd'hui (09/06/2023), la Table1
de la ligne X est mise en position faisceau.
Je l'ai approximativement alignée
 gain_pico.pngfenetre_pico.png 
  Draft   Mon Jun 12 09:51:00 2023 IC, VK, VM, LS, JH, MB, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting Comments:

* There are strong evidences that
part of the frequency problem comes from
  
  57   Mon Jun 19 09:46:32 2023 IC, VK, VM, LS, JH, SC, NDNew SolutionShift summaryresumes Summary of the ring commissioning meeting Report from last week:

- Attempted the strategy suggested
by Alex
  
  58   Thu Jun 22 07:41:18 2023 KDNew SolutionInfoPrise de donnees RE: Mise en place Ligne X hier et ce matin la ligne a été
re-réglé.

La table optique a été
  
  59   Mon Jun 26 09:57:52 2023 VK, IC, LS, NDNew SolutionShift summaryresumes Summary of the ring commissioning meeting Discussion mécanique

- Tous les dipoles ont été
alignés par rapport à des surfaces
  
  6   Thu Dec 3 10:58:11 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020FixedInfodocs demarrage a blanc 3 dec 2020 Bilan démarrage à blanc 3
dec 2020 : (H Monard, S Cavalier)

but : verification etat IHM pour
  
  7   Thu Dec 3 13:45:13 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020FixedInfodocs signal photodiode laser    photodiode-laser2.png 
  8   Thu Dec 3 13:50:27 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020FixedInfoPrise de donnees signal photodiode 03-12-20    plot.pdf 
  9   Thu Dec 3 15:17:04 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020FixedInfoPrise de donnees   Signaux RF - REdPitaya 03-12-20

Photodiode laser - RP.04 A

QS RP.04 B
  
  10   Thu Dec 3 15:26:22 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020FixedInfoPrise de donnees   signaux photodiode PrC Qs test avec generateur
impulsion ! 2 V , 3 µs (bleu ciel) 
et signal avec rampe, 1V (moire), photodiode
 photodiode-Prc_Qs.pdf 
  11   Wed Dec 9 14:26:35 2020 Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020FixedInfoetc re-organisation PC-client en SdC suite à la discussion de lundi 7
/12/20, les PC clients en SdC ont été
déplacés et re-organisé
  
  40   Mon Dec 5 17:42:51 2022 CB/HG/SC/KDFixedInforesumes Programme linac semaine 5 décembre Lundi 5 décembre :
redémarrage technique

Pb refroidissement  Pb
  
  Draft   Tue Dec 1 14:35:01 2020 Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020      Laser :

Camera : mettre le temps d'exposition
à 0.2 secondes
  
  22   Fri Mar 4 11:07:28 2022 CB/SC Problemproblemes liste des actions à menées     
  25   Fri Sep 2 08:51:46 2022 MO Shift summaryetc démarrage 8h35  mise sous tension: PSS, LB9000,
modulateur, chillers
  