ID Date Authordown Status Type Category Important Subject Icon Text Attachments
  55   Fri Jun 9 19:57:14 2023 KDNew SolutionInfoPrise de donnees Mise en place Ligne X Aujourd'hui (09/06/2023), la Table1
de la ligne X est mise en position faisceau.
Je l'ai approximativement alignée
 gain_pico.pngfenetre_pico.png 
  58   Thu Jun 22 07:41:18 2023 KDNew SolutionInfoPrise de donnees RE: Mise en place Ligne X hier et ce matin la ligne a été
re-réglé.

La table optique a été
  
  49   Mon Mar 13 09:39:39 2023 IC, VM, SC, JH, VC, NDNew SolutionShift summaryanalyse Summary of the ring commissioning meeting Excitation (betatron oscillation) on the
beam observed by exciting it with the extraction
kicker => initial measures of the tune.
 data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png 
  42   Mon Jan 9 10:12:40 2023 IC, VK, VM, SC, NDNew SolutionInforesumes Summary of the ring commissioning meeting Notes from last week:


Beam was very unstable
(probably energy instabilities), lot of time
 20_injections.jpg 
  57   Mon Jun 19 09:46:32 2023 IC, VK, VM, LS, JH, SC, NDNew SolutionShift summaryresumes Summary of the ring commissioning meeting Report from last week:

- Attempted the strategy suggested
by Alex
  
  Draft   Mon Jun 12 09:51:00 2023 IC, VK, VM, LS, JH, MB, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting Comments:

* There are strong evidences that
part of the frequency problem comes from
  
  50   Mon Mar 20 10:08:24 2023 IC, VK, VM, JH, NDNew SolutionInforesumes Summary of the ring commissioning meeting - Went up to 100kV in the cavity once it
was tuned.

- Achieved nice storage stable
  
  27   Mon Sep 19 16:29:06 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees Ring objectives This entry is to be updated as the work
progresses.

1) Re-establish beam transport
  
  30   Mon Sep 26 10:21:20 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: Ring objectives (1),  (2), (4) and (5) from last week
have been done other items in progress.

New to do list:
  
  34   Wed Oct 5 09:51:12 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: RE: Ring objectives New to do list:

(0) Re-establish beam transport
to ring
  
  36   Mon Oct 10 10:37:43 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: RE: RE: Ring objectives To do list:

(0) Re-establish beam transport
to ring
  
  26   Mon Sep 19 15:56:28 2022 IC, VK, VI, VC, JH, HG, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #1 Status slides presented by Iryna available
on indico at https://indico.ijclab.in2p3.fr/event/8749/

The beam parameters required for
  
  33   Mon Oct 3 17:29:53 2022 IC, VK, VI (ND)New SolutionInforesumes Summary of the ring commissioning meeting #3 
Shift summaries for the ring for last
week are at

https://elog.lal.in2p3.fr/THOMX/Commissionning/568

https://elog.lal.in2p3.fr/THOMX/Commissionning/570

  
  53   Mon May 22 10:05:30 2023 IC, VK, LS, JH, NDNew SolutionShift summaryanalyse Summary of the ring commissioning meeting === Summary of last week:

- Frequency was reduced to 500.0202MHz
but the beam stayed only for 100s of turns
  
  28   Fri Sep 23 09:44:14 2022 IC, VK, AM, VC, NDUnder ProcessInfodocs Beam requirements for the ring The following parameters are required for
ring operations:

- At least 50pC on TL/DG/ICT.01
  
  12   Wed Dec 9 14:33:08 2020 HaygUnder ProcessInfoetc RE:  Pour info :


client 1 ne fonctionne
pas encore. Il n'a pas été
  
  14   Wed Mar 3 10:49:14 2021 HaygUnder ProcessInfoproblemes WC tests TANGO 
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean


 

Dans les variables MeanStd :


Charge 1 :

er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean 


Charge
  
  15   Wed Mar 3 11:30:46 2021 HaygUnder ProcessInfoproblemes RE: WC tests TANGO  




 Screenshot_from_2021-03-03_11-29-57.png 
  23   Wed Aug 17 09:48:31 2022 HM MOUnder ProcessInfoPrise de donnees redemarrage 17 aout 2022 9h30 redemarrage HM MO

- niveau 1 verifié (circuit
eau, air comprimé, etat modulateur
  
  Draft   Wed Jul 8 14:33:04 2020 Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020Under ProcessShift summaryPrise de donnees test moteur solĂ©noide en charge Prise de mesure relative entre les deux
bobines : 18.7cm avec les alimentations éteintes
mais du refroidissement.
  