Entry   VK, IC, VI, JH, ND; Summary of the ring commissioning meeting #4 
- 300 turns achieved.

- Probably more but limited by libera cut-off frequency.

- Need to measure the injection axis
Entry   IC, VK, VI (ND); Summary of the ring commissioning meeting #3 

Shift summaries for the ring for last week are at

https://elog.lal.in2p3.fr/THOMX/Commissionning/568

https://elog.lal.in2p3.fr/THOMX/Commissionning/570

https://elog.lal.in2p3.fr/THOMX/Commissionning/571

The
problem with the pulse jumpis with 12ns delays has been identified and fixed (it was related to the synchronisation system).

The main issue identified
Entry   VK, IC, AM, ND; Summary of the ring commissioning meeting #2 
Slides are at https://indico.ijclab.in2p3.fr/event/8750/

- There is a difference in BPM numbering in Tango and MML => we should stick to Tango names.

- Beam was very unstable during the past week
Entry   IC, VK, VI, VC, JH, HG, ND; Summary of the ring commissioning meeting #1 
Status slides presented by Iryna available on indico at https://indico.ijclab.in2p3.fr/event/8749/

The beam parameters required for a good injection in the ring were discussed.

The following required parameters were identified:
Entry   VK, IC, VM, JH, ND; Summary of the ring commissioning meeting 
Discussed recent orbit correction of the expanded orbit. 

Need to make run with  cavity detuning from its resonant conditions
used in the conditioning. 

 

Discussed measurement of tune, and possible origins of inconsistant/noisy measurements.
 Either BPMs signal processing or  weak excitation. Beam size?

Need to do measurements with scope, to see if we can interpret TbT
Entry   VK, IC, VM, JH, KD, ND; Summary of the ring commissioning meeting 
The ring orbit has been re-established despite some difficulties after the shutdown.

The ring cavity has been started. Whatever the phase it kills the beam.
Two hypothesis:
Entry   IC, VK, VM, SC, ND; Summary of the ring commissioning meeting 20_injections.jpg
Notes from last week:


Beam was very unstable (probably energy instabilities), lot of time was spent tuning the injector.
Beam instabilities prevented
us from having a good storage.
Unable to start the extraction line dipole.


Comments:
Entry   VK, VM, SC, ND, HG; Summary of the ring commissioning meeting 
Summary of last week:

- On Thursday the beam energy was very different from usual (magnets current higher 172A for TL; 176A for RI) => made it impossible to re-use
previous settings for the ring and to find new settings.
Entry   VK,IC, SC, VM, ND; Summary of the ring commissioning meeting 
No beam last week. No beam this week.

Machine recovery on 2/2 => Nicolas may try to tune the machine with students.

Data taking on 9/2 for diags and machine characterization.
Entry   VM, VK, ND; Summary of the ring commissioning meeting 
This week: beam on Thursday.

So far we did not see any screenshot of Ring variables check.

Looking at last week's data, shot to shot charge instability seems to be > 15%
Entry   IC, VM, SC, JH, VC, ND; Summary of the ring commissioning meeting data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png
Excitation (betatron oscillation) on the beam observed by exciting it with the extraction kicker => initial measures of the tune.

Tune measured close from expected value.

Reason for oscillation damping is not understood.
Entry   IC, VK, VM, JH, ND; Summary of the ring commissioning meeting 
- Went up to 100kV in the cavity once it was tuned.

- Achieved nice storage stable for 2500 turns and some beam for > 100ms

- Measured the tune: several peaks around 0.35[1] (near the expected value) and one peak not understood at 0.5
Entry   IC, VK, LS, JH, ND; Summary of the ring commissioning meeting 
=== Summary of last week:

- Frequency was reduced to 500.0202MHz but the beam stayed only for 100s of turns

- Good storage was achieved at 500.40MHz:
Entry   VK, IC, JH, VM, LS, MB, ND; Summary of the ring commissioning meeting 
Main studies:

- Measure bucket width in phase on Thursday at 500.02MHz => no storage beyond 45kV

- Measure frequency with spectrum analyser => 500.39MHz
Entry   IC, VK, VM, LS, JH, MB, ND; Summary of the ring commissioning meeting 
Comments:

* There are strong evidences that part of the frequency problem comes from mechanical issue

* Fring field of the dipoles seems to be longer than anticipated. This could lead to shortening of the orbit.
Entry   IC, VK, VM, LS, JH, SC, ND; Summary of the ring commissioning meeting 
Report from last week:

- Attempted the strategy suggested by Alex

- Comparison of orbit with RF ON and RF OFF helped understand the "natural" frequency of the ring: 500.33MHz
Entry   VK, IC, LS, ND; Summary of the ring commissioning meeting 
Discussion mécanique

- Tous les dipoles ont été alignés par rapport à des surfaces de référence

- Le décalage du centre magnétique par rapport au centre mécanique a été mesuré par Cynthia et pris
Entry   ND, IC; Steerers and BPM map for the ring BPM_ring.pngBPM_ring.pptx
See attached files.
Entry   ND; Réunion Physique ThomX 
Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/

Quelques notes de la réunion de Physique de ThomX:

- Présentation de Marie sur les mesures dans le linac
Entry   IC, VK, VI, VC, JH, HG, ND ; Ring objectives 
This entry is to be updated as the work progresses.

1) Re-establish beam transport to ring

2) Scan in time the septum