35
|
Mon Oct 10 10:04:49 2022 |
VK, IC, VI, JH, ND | Under Process | Shift summary | resumes |
|
Summary of the ring commissioning meeting #4 | | - 300 turns achieved.
- Probably more but limited by
libera cut-off frequency. |
| |
33
|
Mon Oct 3 17:29:53 2022 |
IC, VK, VI (ND) | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting #3 | |
Shift summaries for the ring for last
week are at
https://elog.lal.in2p3.fr/THOMX/Commissionning/568
https://elog.lal.in2p3.fr/THOMX/Commissionning/570
|
| |
29
|
Mon Sep 26 09:39:15 2022 |
VK, IC, AM, ND | New Solution | Info | Prise de donnees |
|
Summary of the ring commissioning meeting #2 | | Slides are at https://indico.ijclab.in2p3.fr/event/8750/
- There is a difference in BPM
numbering in Tango and MML => we should |
| |
26
|
Mon Sep 19 15:56:28 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Info | Prise de donnees |
|
Summary of the ring commissioning meeting #1 | | Status slides presented by Iryna available
on indico at https://indico.ijclab.in2p3.fr/event/8749/
The beam parameters required for |
| |
38
|
Mon Nov 7 23:53:29 2022 |
VK, IC, VM, JH, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Discussed recent orbit correction of
the expanded orbit.
Need
to make run with cavity detuning from |
| |
39
|
Mon Dec 5 10:05:11 2022 |
VK, IC, VM, JH, KD, ND | New Solution | Info | analyse |
|
Summary of the ring commissioning meeting | | The ring orbit has been re-established
despite some difficulties after the shutdown.
The ring cavity has been started. |
| |
42
|
Mon Jan 9 10:12:40 2023 |
IC, VK, VM, SC, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Notes from last week:
Beam was very unstable
(probably energy instabilities), lot of time |
| |
43
|
Mon Jan 16 09:38:16 2023 |
VK, VM, SC, ND, HG | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Summary of last week:
- On Thursday the beam energy was
very different from usual (magnets current |
| |
44
|
Mon Jan 23 09:54:14 2023 |
VK,IC, SC, VM, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | No beam last week. No beam this week.
Machine recovery on 2/2 => Nicolas
may try to tune the machine with students. |
| |
47
|
Mon Feb 20 10:06:36 2023 |
VM, VK, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | This week: beam on Thursday.
So far we did not see any screenshot
of Ring variables check. |
| |
49
|
Mon Mar 13 09:39:39 2023 |
IC, VM, SC, JH, VC, ND | New Solution | Shift summary | analyse |
|
Summary of the ring commissioning meeting | | Excitation (betatron oscillation) on the
beam observed by exciting it with the extraction
kicker => initial measures of the tune. |
    | |
50
|
Mon Mar 20 10:08:24 2023 |
IC, VK, VM, JH, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | - Went up to 100kV in the cavity once it
was tuned.
- Achieved nice storage stable |
| |
53
|
Mon May 22 10:05:30 2023 |
IC, VK, LS, JH, ND | New Solution | Shift summary | analyse |
|
Summary of the ring commissioning meeting | | === Summary of last week:
- Frequency was reduced to 500.0202MHz
but the beam stayed only for 100s of turns |
| |
54
|
Tue May 30 10:12:30 2023 |
VK, IC, JH, VM, LS, MB, ND | New Solution | Info | analyse |
|
Summary of the ring commissioning meeting | | Main studies:
- Measure bucket width in phase
on Thursday at 500.02MHz => no storage |
| |
Draft
|
Mon Jun 12 09:51:00 2023 |
IC, VK, VM, LS, JH, MB, ND | New Solution | Info | Prise de donnees |
|
Summary of the ring commissioning meeting | | Comments:
* There are strong evidences that
part of the frequency problem comes from |
| |
57
|
Mon Jun 19 09:46:32 2023 |
IC, VK, VM, LS, JH, SC, ND | New Solution | Shift summary | resumes |
|
Summary of the ring commissioning meeting | | Report from last week:
- Attempted the strategy suggested
by Alex |
| |
59
|
Mon Jun 26 09:57:52 2023 |
VK, IC, LS, ND | New Solution | Shift summary | resumes |
|
Summary of the ring commissioning meeting | | Discussion mécanique
- Tous les dipoles ont été
alignés par rapport à des surfaces |
| |
32
|
Wed Sep 28 09:56:44 2022 |
ND, IC | Reference Solution | Info | docs |
|
Steerers and BPM map for the ring | | See attached files. |
 | |
51
|
Thu Mar 23 12:29:05 2023 |
ND | New Solution | Info | resumes |
|
Réunion Physique ThomX | | Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/
Quelques notes de la réunion
de Physique de ThomX: |
| |
27
|
Mon Sep 19 16:29:06 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
Ring objectives | | This entry is to be updated as the work
progresses.
1) Re-establish beam transport |
|
|