55
|
Fri Jun 9 19:57:14 2023 |
KD | New Solution | Info | Prise de donnees |
|
Mise en place Ligne X | | Aujourd'hui (09/06/2023), la Table1
de la ligne X est mise en position faisceau.
Je l'ai approximativement alignée |
 |
|
58
|
Thu Jun 22 07:41:18 2023 |
KD | New Solution | Info | Prise de donnees |
|
RE: Mise en place Ligne X | | hier et ce matin la ligne a été
re-réglé.
La table optique a été |
|
|
49
|
Mon Mar 13 09:39:39 2023 |
IC, VM, SC, JH, VC, ND | New Solution | Shift summary | analyse |
|
Summary of the ring commissioning meeting | | Excitation (betatron oscillation) on the
beam observed by exciting it with the extraction
kicker => initial measures of the tune. |
    |
|
42
|
Mon Jan 9 10:12:40 2023 |
IC, VK, VM, SC, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Notes from last week:
Beam was very unstable
(probably energy instabilities), lot of time |
|
|
57
|
Mon Jun 19 09:46:32 2023 |
IC, VK, VM, LS, JH, SC, ND | New Solution | Shift summary | resumes |
|
Summary of the ring commissioning meeting | | Report from last week:
- Attempted the strategy suggested
by Alex |
|
|
Draft
|
Mon Jun 12 09:51:00 2023 |
IC, VK, VM, LS, JH, MB, ND | New Solution | Info | Prise de donnees |
|
Summary of the ring commissioning meeting | | Comments:
* There are strong evidences that
part of the frequency problem comes from |
|
|
50
|
Mon Mar 20 10:08:24 2023 |
IC, VK, VM, JH, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | - Went up to 100kV in the cavity once it
was tuned.
- Achieved nice storage stable |
|
|
27
|
Mon Sep 19 16:29:06 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
Ring objectives | | This entry is to be updated as the work
progresses.
1) Re-establish beam transport |
|
|
30
|
Mon Sep 26 10:21:20 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: Ring objectives | | (1), (2), (4) and (5) from last week
have been done other items in progress.
New to do list: |
|
|
34
|
Wed Oct 5 09:51:12 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: RE: Ring objectives | | New to do list:
(0) Re-establish beam transport
to ring |
|
|
36
|
Mon Oct 10 10:37:43 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: RE: RE: Ring objectives | | To do list:
(0) Re-establish beam transport
to ring |
|
|
26
|
Mon Sep 19 15:56:28 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Info | Prise de donnees |
|
Summary of the ring commissioning meeting #1 | | Status slides presented by Iryna available
on indico at https://indico.ijclab.in2p3.fr/event/8749/
The beam parameters required for |
|
|
33
|
Mon Oct 3 17:29:53 2022 |
IC, VK, VI (ND) | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting #3 | |
Shift summaries for the ring for last
week are at
https://elog.lal.in2p3.fr/THOMX/Commissionning/568
https://elog.lal.in2p3.fr/THOMX/Commissionning/570
|
|
|
53
|
Mon May 22 10:05:30 2023 |
IC, VK, LS, JH, ND | New Solution | Shift summary | analyse |
|
Summary of the ring commissioning meeting | | === Summary of last week:
- Frequency was reduced to 500.0202MHz
but the beam stayed only for 100s of turns |
|
|
28
|
Fri Sep 23 09:44:14 2022 |
IC, VK, AM, VC, ND | Under Process | Info | docs |
|
Beam requirements for the ring | | The following parameters are required for
ring operations:
- At least 50pC on TL/DG/ICT.01 |
|
|
12
|
Wed Dec 9 14:33:08 2020 |
Hayg | Under Process | Info | etc |
|
RE: | | Pour info :
client 1 ne fonctionne
pas encore. Il n'a pas été |
|
|
14
|
Wed Mar 3 10:49:14 2021 |
Hayg | Under Process | Info | problemes |
|
WC tests TANGO | |
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean
Dans les variables MeanStd :
Charge 1 :
er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean
Charge |
|
|
15
|
Wed Mar 3 11:30:46 2021 |
Hayg | Under Process | Info | problemes |
|
RE: WC tests TANGO | |
|
|
|
23
|
Wed Aug 17 09:48:31 2022 |
HM MO | Under Process | Info | Prise de donnees |
|
redemarrage 17 aout 2022 | | 9h30 redemarrage HM MO
- niveau 1 verifié (circuit
eau, air comprimé, etat modulateur |
|
|
Draft
|
Wed Jul 8 14:33:04 2020 |
Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020 | Under Process | Shift summary | Prise de donnees |
|
test moteur solénoide en charge | | Prise de mesure relative entre les deux
bobines : 18.7cm avec les alimentations éteintes
mais du refroidissement. |
|