  Status of installation, including shipping and de-installation of test setups., Page 1 of 3  Not logged in ELOG logo
ID Date Author Statusdown Type Category Location Title Text Attachments
  1   Mon Sep 30 16:32:31 2019 Ronic ChicheFixedissueutilitiesOptical roomChiller of the new laser amplifier We observed 2 issues for the chiller of
the new CELIA laser amplifier:


setting the water temperature
  
  2   Tue Oct 1 12:24:11 2019 Ronic ChicheFixedissueutilitiesOptical roomChiller of the new laser amplifier Today, the chiller worked at 17°C during
3 hours without error, no freezing nor flow
sensor error.
  
  3   Fri Nov 15 14:51:54 2019 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsOptical roomSmaract Controllers settingScheme of cabling of the SmarAct motors
controllers for acting on Frep and CEP.
 Origami_OneFive_33MHz_laser_SmarAct_controllers_cabling.pdf 
  4   Tue Nov 19 17:55:20 2019 Ronic ChicheFixedissuemechanics | vacuumOptical roomNew valves cablingToday, Manu and Eric changed the cavity
valves pressure system to open and close
them.
  
  6   Wed Nov 20 14:52:45 2019 Loïc AmoudryFixedinfolasers and optics | vacuumOptical roomNew valve cabling and 30Hz noise PZTThe Pneumatic valves are still coming back
to "close" position.
Now the air bottle is always "open"
 Noise_with_all_flow_off.pngNoise_with_room_flow_on.pngNoise_30Hz.png 
  8   Wed Nov 27 09:48:44 2019 Ronic ChicheFixedinfocablingOptical roomnew circuit breaker for the UPSA new circuit breaker has been installed
today before the UPS to fix the shutdown
issues we observed some months ago when too
  
  9   Wed Jul 1 17:00:18 2020 Ronic ChicheFixedreportmechanics | vacuumOptical roomEdge installation19/06/2020

The first part of the edge installation
was on done by Yann and Ronic
  
  10   Wed Feb 24 17:35:55 2021 Ronic ChicheFixedreportmechanics | vacuum | utilitiesOptical roomOperations before moving the optical tableOperations before moving the optical table
from the optical room to the Igloo.

— the cavity has been filled
  
  11   Fri Feb 26 17:04:57 2021 Ronic ChicheFixedreportmechanicsThomX iglooMoving the optical table to the IglooThis morning the Bovis company moved the
optical table from the optical room to the
Igloo without any problem.
 9x 
  12   Mon May 17 11:53:35 2021 Ronic ChicheFixedinfoutilitiesThomX iglooThomX housing roof openingToday, Yannick Petrilli removed 5 concrete
bars (5-9) from the ThomX housing roof in
order to let the optical table be installed
 IMG_20210517_105258.jpgIMG_20210517_111407.jpg 
  13   Thu Jun 10 16:55:37 2021 Ronic ChicheFixedinfomechanicsThomX iglooConnecting the optical table to the ThomX ringOn the 19th of May, the optical table has
been moved inside the ThomX concrete housing
and connected to the Symetrie hexapod and
 Image1.jpgImage2.jpgImage3.png 
  14   Thu Jun 10 17:06:42 2021 Ronic ChicheFixedinfomechanicsThomX iglooAirflow installationOn the 27th of May, the Airflow has been
dismounted from the optical room to be mounted
around the optical cavity by the AirC2 company.
  
  15   Thu Jun 10 17:45:09 2021 Ronic ChicheFixedinfomechanicsThomX iglooAirflow installationThe AC plug and the power cord of the airflow
were quite hot because they have been dimensioned
for 16A current and the total current is
  
  16   Thu Oct 14 15:08:56 2021 Ronic ChicheFixedinfodetectors and electronics | utilitiesThomX iglooCleaning, Motors Controllers mini-rack, hexapod controller, chiller and vacuumThis morning with Manar, we started to
clean the floor around the cavity, the outside
part of the panels of the housing, and the
  
  17   Thu Oct 14 18:12:39 2021 Ronic ChicheFixedinfodetectors and electronics | utilitiesThomX iglooCleaning, Motors Controllers mini-rack, hexapod controller, chiller and vacuumThis afternoon, we continued to clean the
housing with Manar and Daniele.
we did a dust measurement after cleaning
  
  18   Fri Oct 15 14:21:03 2021 Manar AmerFixedreportvacuum | cabling | softwareThomX iglooVacuum in the mirror chambers
The electron ring has been vacuum
inside it, but the valves connecting it to
the two mirror chambers are closed. Before
 First_Level_Pump.jpgSecond_Level_Pump_Turpo_blades_Controlers.jpgInkedControl_Room_Gauge_Monitoring_screen.jpgInkedOptical_cavity_vacuum_control_Modules.jpg 
  19   Fri Oct 15 14:34:34 2021 Manar AmerFixedreportvacuum | cabling | softwareThomX iglooVacuum in the mirror chambersthe ionic pumps have been also connected
this morning but not powered on, yet.
the vacuum group is waiting for a
  
  20   Fri Oct 15 17:57:54 2021 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | softwareThomX iglooInstallation updateThis afternoon with Manar, we finished
connecting FP-cavity mirrors motors and alignment
mirrors motors to their 3 ISP controllers.
  
  21   Mon Oct 18 09:46:14 2021 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | softwareThomX iglooInstallation updateafter the WE, the right vessel vacuum level
is 1.7e-7 mbar (primary + turbo pumps)

and the left vessel vacuum level
  
  22   Mon Oct 18 15:01:07 2021 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | softwareThomX iglooInstallation updateNow, both vessels are pumped by an ionic
pump (both Turbo pumping entrances have been
closed).
  