Reply to this: 19
|
|
|
- The electron ring has been vacuum inside it, but the valves connecting it to the two mirror chambers are closed. Before commencing to do measurements on the cavity, we must place the mirrors under the proper vacuum and open the valves connecting them to the electron ring.
- The vacuum system is consistent of three levels; Normal (max ~10^-3 mbar), turbo (max ~ 10^-7 mbar) and ionization.
- With the help of Frédéric LETELLIER and Mercier Bruno from the vacuum department in the morning.
- Installation of the first level vacuum (normal pump)
- Installation of the second level vacuum (turbo pump)
- can reach up to 1350 Hz = 81 000 rotation per min (how fast it reaches max rotation depends on how good the first level pump was done)
- Installation of the connections to the gauge meter, there are two gauges, one for first level and one for second.
- All turned on !!
- Both are on and can be monitored from ThomX control room
- The attached photo from the control room shows how we will be able to get a graph of vacuum over time.
- (we were able to reach approximately for Volume 11 and Volume 12 respectively 4.1*10^-6 and ~8*10^-7)
- to explain Volume 11 and volume 12 (look at Location of ThomX vacuum valves photo)
- A photo of the control module placed outside the bunker to control the optical cavity vacuum is attached
- This afternoon the third system will be installed and turned on
*** Note after vacuum is set there will be three permeant cables inside the cavity box for monitoring.
|
|
|
|
|
|
|
|
|