  23   Mon Oct 18 15:15:26 2021 Manar AmerFixedreportcabling | softwareThomX iglooMotors Controler and Software
When connecting
the Ethernet cable from the hub to the computer,
it must be connected to the correct one (shown
 ConnectEthernetToDesignatedOutlet_marked.jpgMototControlerws.jpgPositionOnMoniter.jpeg 
  24   Tue Oct 19 10:43:42 2021 Manar AmerFixedinfovacuumThomX iglooVacuum pressure to open valvesThe pressure for the mirror vacuum chambers
needs to be ~ few 10^-9 mbar for the valves
to be open to the electron ring (the rest
  
  25   Tue Oct 19 11:06:03 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror Chambers 

At
10h45 in the morning, the pressure on the
 19102021_vacuum_pressure_on_mirrorsChambers.jpg 
  26   Tue Oct 19 12:46:40 2021 Manar AmerFixedinfovacuumThomX iglooVacuum pressure to open valvesReminding: the opening of the valves is
the responsibility of the vacuum group only.

  
  27   Tue Oct 19 16:38:31 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror ChambersAt 15h30 in
the afternoon, the pressure on the mirror
chambers is:
 19102021_vacuum_pressure_on_mirrorsChambers_15h30.jpg 
  28   Wed Oct 20 10:51:29 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror ChambersAt 10h in
the morning, the pressure on the mirror chambers
is:
 20102021_vacuum_pressure_on_mirrorsChambers_10h10.jpg 
  29   Thu Oct 21 09:45:03 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror ChambersAt 9h30 in
the morning, the pressure on the mirror chambers
is:
 21102021_vacuum_pressure_on_mirrorsChambers_9h30.jpg 
  30   Thu Oct 21 18:31:11 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror Chambers Leckage TestLeakage test done in the afternoon.

The method :


an atomic mass spectrometer
 21102021_vacuum_pressure_on_mirrorsChambers_16h30.jpg21102121_MassSpectrometerOpticalCav.png 
  31   Fri Oct 22 17:36:05 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror Chambers PlotA plot showing the descend of the vacuum
in the mirror chambers (data to plot it obtained
yesterday evening)
 PressureOverTime.png 
  32   Tue Oct 26 09:20:01 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror Chambers PlotDuring the weekend 23-24th of October,
the lab and ThomX suffered a power breakdown.
All the pumping systems had to restart.
  
  33   Wed Oct 27 09:34:04 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror Chambers PlotPressure is 1.4e-9 and 2.6e-9 mbar this
morning.

  
  34   Thu Nov 4 12:42:38 2021 Ronic ChicheFixedinfovacuumThomX iglooOpening of the FP cavity valvesas the vacuum level was good enough, I
asked Eric Mistretta to open the 2 valves
of the FP cavity.
 IMG_20211104_112239.jpg 
  35   Mon Nov 8 14:50:45 2021 Ronic ChicheFixedinfovacuumThomX iglooOpening of the FP cavity valvesOn Friday the 5th of November, ThomX suffered
again from a power breakdown.

all the pumping systems had to
  
  36   Tue Nov 16 15:23:22 2021 Manar AmerFixedreportutilitiesThomX iglooIris Mounts on Cavity WindowsIn order to find the Alignment of the ThomX
cavity, Yann built mounts that could be placed
directly on the windows outside the cavity,
 Iris_Mounts_On_Windows.jpgP1_Injection_Mirror_Window_Iris_Mount.jpgInkedS3_Mirror_Window_Outside_LI.jpg 
  37   Fri Nov 19 16:33:29 2021 Manar AmerFixedreportutilitiesThomX iglooIris Mounts on Cavity WindowsThe new iris mounts fixed on the small
cavity windows.

Need additional 2 irises.
 Iris_Mounts_On_small_Windows.pngIris_Mounts_Fixed_On_small_Windows.png 
  38   Tue Jan 11 10:32:45 2022 Manar AmerFixedreportlasers and opticsThomX iglooOne Five laser moved The One Five laser and
its controller have been moved from PLIC
to ThomX Iglo.
  
  39   Wed Jan 19 18:32:47 2022 Ronic ChicheFixedinfocablingThomX igloonew power supplies connexionsthis afternoon with Viktor, we redid all
the power supplies connexions.

4x cables are now connected to
  
  40   Thu Feb 10 09:41:54 2022 Ronic ChicheFixedinfocablingThomX iglooPower supplies switched offThis afternoon, an electrical operation
will be done in ThomX, impacting possibly
the casemate power supplies.
  
  41   Thu Feb 10 15:08:41 2022 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooshutter base plate, L-shape arm and housing frameThis afternoon with Yann:
- we changed the shutter base plate
position to center the beam axis with the
  
  42   Tue Mar 8 12:40:00 2022 Ronic ChicheFixedinfomechanicsThomX iglooChiller installation + interlock- this morning with Aurélien, we
filled the water tank of the chiller and
we opened the water valves (last pipes on
  