HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of installation, including shipping and de-installation of test setups.  Not logged in ELOG logo
Message ID: 13     Entry time: Thu Jun 10 16:55:37 2021
 Author: Ronic Chiche 
 Status: Fixed 
 Type: info 
 Category: mechanics 
 Location: ThomX igloo 
 Title: Connecting the optical table to the ThomX ring 

On the 19th of May, the optical table has been moved inside the ThomX concrete housing and connected to the Symetrie hexapod and to the electron ring.

Symetrie guys started to test the hexapod and they put some software limits around the predefined zero position.

Attachment 1: Image1.jpg  117 kB  | Hide | Hide all
Image1.jpg
Attachment 2: Image2.jpg  194 kB  | Hide | Hide all
Image2.jpg
Attachment 3: Image3.png  1.008 MB  | Hide | Hide all
Image3.png
ELOG V3.1.4-395e101