HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of installation, including shipping and de-installation of test setups.  Not logged in ELOG logo
Message ID: 11     Entry time: Fri Feb 26 17:04:57 2021
 Author: Ronic Chiche 
 Status: Fixed 
 Type: report 
 Category: mechanics 
 Location: ThomX igloo 
 Title: Moving the optical table to the Igloo 

This morning the Bovis company moved the optical table from the optical room to the Igloo without any problem.

The table is now stored inside the Igloo, just after the large entrance doors, on the right side.
It has been covered with plastic blankets.

 

Attachment 1: IMG_20210225_092616.jpg  168 kB  | Hide | Hide all
IMG_20210225_092616.jpg
Attachment 2: IMG_20210226_093737.jpg  256 kB  | Hide | Hide all
IMG_20210226_093737.jpg
Attachment 3: IMG_20210226_095050.jpg  347 kB  | Hide | Hide all
IMG_20210226_095050.jpg
Attachment 4: IMG_20210226_095334.jpg  296 kB  | Hide | Hide all
IMG_20210226_095334.jpg
Attachment 5: IMG_20210226_101347.jpg  328 kB  | Hide | Hide all
IMG_20210226_101347.jpg
Attachment 6: IMG_20210226_101718.jpg  535 kB  | Hide | Hide all
IMG_20210226_101718.jpg
Attachment 7: IMG_20210226_101837.jpg  578 kB  | Hide | Hide all
IMG_20210226_101837.jpg
Attachment 8: IMG_20210226_102155.jpg  401 kB  | Hide | Hide all
IMG_20210226_102155.jpg
Attachment 9: IMG_20210226_102849.jpg  222 kB  | Hide | Hide all
IMG_20210226_102849.jpg
ELOG V3.1.4-395e101