  43   Wed Mar 9 10:51:59 2022 Ronic ChicheFixedinfomechanicsThomX iglooChiller installation + interlock- this morning the chiller leakage has
been fixed by adding some Teflon on the faulty
Swagelock adapter.
 IMG_20220309_093541.pngChiller_Sub-d15_pinout.jpg 
  44   Fri Mar 11 12:24:34 2022 Ronic ChicheFixedinfomechanicsThomX iglooChiller installation + interlockThis morning, I started the chiller and
opened the valves on the external water circuit
=> no water leakage during the morning.
  
  45   Thu Aug 25 16:43:01 2022 Ronic ChicheFixedinfodetectors and electronics | softwareThomX iglooScope and Desktop computer removingthis afternoon, because of the test on
the electron beam drive in the ring in the
next days,
  
  46   Thu Jan 5 10:16:38 2023 Manar AmerFixedinfoutilitiesThomX iglooAlphanov amplifier chiller instruction manual Adding the instructions manual for the
Alphanov Amplifier SMC Chiller

 HEC-OM-U015-B.pdf 
  47   Wed Feb 8 11:02:38 2023 Ronic ChicheFixedinfoutilitiesThomX iglooSafety patrol instructionsIf one needs to work with 3rd stage on
the laser amplifier, one needs to make the
safety patrol inspection before closing the
 key_board.jpg 
  48   Wed Feb 8 13:48:33 2023 Ronic ChicheFixedinfoutilitiesThomX iglooSafety patrol instructionsafter finishing the controlled intervention,
you just have to exit the bunker with the
2 keys and place them back in their location
  
  49   Wed Jul 5 16:50:50 2023 Ronic ChicheFixedissueutilitiesThomX iglooAirflow power breakdownsince around 2 weeks, the airflow above
the optical table housing has a power breakdown
when one tries to switch it on.
  
  50   Wed Dec 20 09:35:36 2023 Ronic ChicheFixedinfocablingThomX iglooUPS installation and commissioningJean-Noel Cayla installed several days
ago a Eaton 9PX 11kVA UPS inside the Igloo,
outside of the ThomX bunker
  
  51   Wed Dec 20 10:17:19 2023 Ronic ChicheFixedinfocablingThomX iglooUPS installation and commissioningfinally I installed the OneFive laser,
the Smaract motors of the laser and the Arduino
Peltier controller of the laser on the UPS
  
  52   Wed Dec 20 12:59:00 2023 Ronic ChicheFixedinfocablingThomX iglooUPS installation and commissioningI was able to lock back the FP-cavity.

at one moment, during the alignment
optmization process of the infection mirrors
  