1087
|
Wed Jun 11 08:46:58 2025 |
Entered by Marie Jacquet from 134.158.205.17 on Wed Jun 11 08:46:44 2025 | | Shift summary | LI | Ring |
|
2025-06-04 Fluo-spectro : Spectre du 2025-06-04 | | |
|
|
1066
|
Mon May 12 07:58:58 2025 |
Entered by Kevin Dupraz from 109.222.35.58 on Mon May 12 07:58:41 2025 | Under Process | Shift summary | LI | RF D1 | Vide | Linac Commissionning |
|
shift du 12 mai 2025 : conditionnement GUN | | 8h: mise en chauffe modulateur et frigo/chiller
- problème de lecture de
vide (visible sur toute les jauges LINAC) |
 |
|
880
|
Thu Jun 27 16:14:38 2024 |
Entered by Super Team from 134.158.195.141 on Thu Jun 27 16:14:24 2024 | | Linac | LI | RF D1 |
|
Tests reseau RF | | Charge en sortie diviseur cote section
HT = 1220V (35MW), 10Hz , 3us
Attenuateur cote canon 30 dB |
|
|
881
|
Fri Jun 28 14:37:19 2024 |
Entered by Super Team from 134.158.195.141 on Fri Jun 28 14:37:07 2024 | | Linac | LI | RF D1 |
|
Tests reseau RF : branche attenuateur | | charge en position après atténuateur,
10Hz, 3us, 1220V
Ca claque à 15dB et 10dB, |
|
|
893
|
Tue Jul 30 10:17:06 2024 |
M.O, M ELK, Hayg, Slava | Under Process | Shift summary | LI | RF D1 |
|
Conditionnement section SC/ME/MO/VK/HG | | signaux RF mesurés :
avec Oscillo :
orange |
|
|
897
|
Mon Aug 5 10:50:06 2024 |
Entered by Super Team from 134.158.195.141 on Mon Aug 5 10:49:42 2024 | | Linac | LI | RF D1 |
|
Suite conditionnement section | | 10h50 Mise en route à 10dB, HT =
1000V
11h04 HT = 1215V, Att sec 3 dB |
|
|
898
|
Tue Aug 6 09:57:48 2024 |
Entered by Super Team from 134.158.195.142 on Tue Aug 6 09:57:28 2024 | | Linac | LI | RF D1 |
|
Commissioning section accélératrice | | 9h58 Démarrage Att sec 10dB 3us
25Hz HT = 1200V
On augmente progressivement la |
|
|
899
|
Thu Aug 8 10:12:35 2024 |
Entered by Super Team from 134.158.195.142 on Thu Aug 8 10:12:02 2024 | | Linac | LI | RF D1 |
|
conditionnement section | | Remplissage SF6 de 2.3 bar à 2.5
bar par Christopher
10h08 : augmentation progressive |
|
|
900
|
Fri Aug 9 10:01:23 2024 |
Entered by Super Team from 134.158.195.142 on Fri Aug 9 10:01:08 2024 | | Linac | LI | RF D1 |
|
conditionnement section | | Vide de démarrage apres l'allumage
des chillers : in section 6.4e-10 et out
section 8.3e-10 |
|
|
1044
|
Fri Mar 21 08:37:09 2025 |
VM | Not Fixed | Problem | LI | RF D1 |
|
Modulador problem | | 08h38 There is problem with the Linac modulator
08h55 Fixed with Maher help |
|
|
1190
|
Tue Feb 10 18:34:33 2026 |
Entered by Super Team from 127.0.0.1 on Tue Feb 10 18:34:13 2026 | Under Process | Shift summary | LI | RF D1 |
|
Demarrage Linac |
| Mesures après remontage de la cale
: 1215 V sur le modulateur.
ça tient mais |
|
|
782
|
Tue Jul 4 08:56:04 2023 |
SC/CB/ME | | Linac | LI | RF Anneau | Linac Commissionning |
|
Faisceau linac et cavite RF | | 8h55 Démarrage modulateur et refroidissements
Intervention SPR terminé
Solenoide = 190A, pas de quadrupoles, |
|
|
Draft
|
Wed Jun 3 08:54:55 2026 |
IC, VM | Under Process | Urgent | LI | RF Anneau |
|
Restart of the accelerator | | 08h45 Start-up modulator, laser, magnets
09h38 Shutter Laser Linac is yellow.
Tuning off the gun operation key does not |
 |
|
1069
|
Wed May 14 08:07:26 2025 |
KD, HG | Under Process | Shift summary | LI | Opt | Linac Commissionning |
|
shift du 14 mai 2025 | | 8h: mise en chauffe à distance (modulateur,
frigo/chiller, laser)
10h30: on a du faisceau atténuateur |
9x |
|
995
|
Tue Jan 14 10:42:56 2025 |
KD | New Solution | Info | LI | Opt |
|
alignement laser PhotoCathode | | Mesure de ce matin et changement point
cathode [H,V] = [4.29,3.49]:
sortie laser : 275 - 280uJ |
|
|
1055
|
Fri Apr 11 08:52:07 2025 |
VC SC HG | Under Process | Shift summary | LI | Linac Commissionning | Ring Commissioning |
|
shift du 11 avril | | demarrage chauffage 8hh50
faisceau sur Yag 1 depuis 1heure....
le script d'alignement solenoide |
|
|
566
|
Mon Sep 26 16:30:56 2022 |
Vincent Chaumat | Under Process | Linac | LI | Linac Commissionning |
|
Mesure puissance Canon et section | | Mesure de la puissance dans la bouble (cristal
+ redpitaya)
mesure sur les 20 derniers points |
 |
|
567
|
Tue Sep 27 08:40:33 2022 |
VC SC CB | Under Process | Shift summary | LI | Linac Commissionning |
|
Shift du jour | | Summary:
- Mesure du jitter et de la position
relative de pulse laser PC avec la RF canon |
|
|
636
|
Wed Nov 30 11:44:22 2022 |
HG/CB/KD | Under Process | Linac | LI | Linac Commissionning |
|
Twiss = F(Solé) | | Phase de Q max : 195, on decale de -50
degrés
IRIS :0.7 mm, att 400, charge |
|
|
642
|
Wed Dec 7 09:07:27 2022 |
KD | Under Process | Shift summary | LI | Linac Commissionning |
|
shift du 7 decembre 2022 | | 9h : Mise en chauffe
ajout d'eau dans la boucle principale
(3 bars --> 4bars) |
|