Message ID: 897     Entry time: Mon Aug 5 10:50:06 2024
 Author: Entered by Super Team from 134.158.195.141 on Mon Aug 5 10:49:42 2024 
 Status:  
 Type: Linac 
 Category: LI | RF D1 
 Important:
 Subject: Suite conditionnement section 
 Icon:  

10h50 Mise en route à 10dB, HT = 1000V

11h04 HT = 1215V, Att sec 3 dB vide in section = 9.3e-9 vide out section = 1e-9

11h05 HT = 1215V, Att sec 2 dB vide in section = 9.4e-9 vide out section = 1e-9

11h06 HT = 1215V, Att sec 1 dB

Interlock à 1dB

11h06 HT = 1215V, Att sec 1 dB vide in section = 7.2e-9 vide out section = 1.2e-9

11h16 Att sec 0.9dB vide in section = 8.5e-9    vide out section = 2.5e-9

11h21 Att sec 0.8dB vide in section = e-9    vide out section = e-9

11h27 Att sec 0.7dB vide in section = 9.5e-9    vide out section = 6.8e-9

11h32 Att sec 0.6dB vide in section = 9.2e-9    vide out section = 7.9e-9

11h38 Att sec 0.5dB (Pis=22MW) vide in section = e-9    vide out section = e-9

12:39 : Interlock ? (scope Auto -> Norm to catch last signal)

12:51 : Interlock section

13:28 : Att sec 0.5dB (Pis=22MW)

14h03 Interlock à 0.5 dB

14h07 Att sec 0.4 dB vide in section = e-9    vide out section = e-9

14h50 interlock 0.4 dB

17h40 interlock 0.4 dB

18h55 fin

 