Entry   Entered by Super Team from 134.158.195.141 on Thu Jun 27 16:14:24 2024; Tests reseau RF test_sur_charge_config.1.pptx
Entry   Entered by Super Team from 134.158.195.141 on Fri Jun 28 14:37:07 2024; Tests reseau RF : branche attenuateur test_sur_charge_config.2.pptx
Entry   M.O, M ELK, Hayg, Slava; Conditionnement section SC/ME/MO/VK/HG  Vide_Screenshot_2024-07-30_17-13-24.png
Entry   Entered by Super Team from 134.158.195.141 on Mon Aug 5 10:49:42 2024; Suite conditionnement section 
Entry   Entered by Super Team from 134.158.195.142 on Tue Aug 6 09:57:28 2024; Commissioning section accélératrice 
Entry   Entered by Super Team from 134.158.195.142 on Thu Aug 8 10:12:02 2024; conditionnement section 
Entry   Entered by Super Team from 134.158.195.142 on Fri Aug 9 10:01:08 2024; conditionnement section 
Entry   VM; Modulador problem 
icon1.gif   Entered by Super Team from 127.0.0.1 on Tue Feb 10 18:34:13 2026; Demarrage Linac 
Entry   SC/CB/ME; Faisceau linac et cavite RF 
Entry   IC, VM; Restart of the accelerator GunCharge_vs_LaserAtt.pngGunDarkCurrent_vs_Att.png
Entry   KD, HG; shift du 14 mai 2025 9x
Entry   KD; alignement laser PhotoCathode 
Entry   VC SC HG; shift du 11 avril  align_soir.png
Entry   Vincent Chaumat; Mesure puissance Canon et section pBoucle.pngPisection.png
Entry   VC SC CB; Shift du jour 
Entry   HG/CB/KD; Twiss = F(Solé) 
Entry   KD; shift du 7 decembre 2022 
Entry   KD, HG; shift du 11 janvier 2023 BPM_stable_16h18.pngfaisceau_TL_YAG3.pngFC_Beam_OFF.pngFC_BeamON.png
Entry   CB,KD,SC; Linac profiles_darkandbeam.pngsolenoscan16h05.pngsolenoscan16h32.png