  23   Tue Jun 8 17:30:12 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:29:26 2021FixedInfoetc   Capture ecran modulateur  HT_1100.png 
  32   Thu Jun 10 14:00:05 2021 Entered by bruni from 134.158.195.141 on Thu Jun 10 13:59:50 2021FixedInfoetc Réglage des retards    reglage_des_retards_100621.png 
  16   Tue Jun 8 14:49:12 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:48:07 2021FixedInfodocs   LI/HFI/ATT.02-MOT.01 Attenuateur Canon   
  27   Wed Jun 9 12:15:41 2021 Entered by bruni from 134.158.195.141 on Wed Jun 9 12:15:27 2021Under ProcessProblemanalyse ihm retard Philippe et Alexandre regardent le problème
des unités dans l'ihm retards
  
  264   Thu Jan 20 09:38:35 2022 Entered by Super Team from 134.158.195.142 on Thu Jan 20 09:38:20 2022FixedLinacVide | Linac Commissionning redemarrage possible LA CFP est en pompage avec les vannes ouvertes
: CFP et anneau en contact vide = 1e-7 mbar

L'anneau coté IP est
  
  140   Thu Oct 28 17:25:53 2021 Entered by sophie chance from 134.158.195.141 on Thu Oct 28 17:25:40 2021FixedInfoVide Pompe PP1 Lorsqu'il y a une coupure de courant
la pompe PP1 remet une valeur d'interlock
par défaut qui n'avait pas été
  
  271   Thu Jan 20 17:16:43 2022 Entered by Super Team from 134.158.195.142 on Thu Jan 20 17:16:30 2022Under ProcessInfoVide Acces controlé casemate Acces controlé pour Mercier, G.
Mercadier, et D. Grasset à 17h. (pour
30 min)
  
  678   Wed Feb 15 11:18:06 2023 BM/NE/JNC FixVide passage TL MPS icon14.gif Bonjour,

problème passage TL au MPS
résolu suite à l'intervention
  
  1047   Mon Mar 31 09:46:56 2025 Entered by Super Team from 134.158.195.141 on Mon Mar 31 09:46:30 2025Not FixedProblemVide Problem with vacuum in the septum. TL-V3 and EL-V1 are closed. 09h45 Problem
with vacuum in the septum. TL-V3 and EL-V1
are closed.
  
  4   Tue May 28 15:07:37 2019 Entered by Aurélien Martens from 134.158.88.183 on Tue May 28 15:07:25 2019FixedInfoTango Photocathode laser DS back operational icon7.gif Following:

1) a crash on 4th of April
and a violent reboot of the ELLiOOs
  
  1001   Tue Jan 21 14:24:22 2025 MJ KDFixedShift summaryTL | Ring | Linac Commissionning | Ring Commissioning align Q1Q3 et pt fonctionnement 61.5 MeV *** Alignement meca Q1Q3

9h30
: 1 tour de cle Q3 vers le mur ( = retour
 sst03_61_5MeV_2025-01-21_16-50-30.pngtbtsum_sansRF_61_5MeV.png 
  1002   Wed Jan 22 13:32:43 2025 MJ HGFixedShift summaryTL | LE | Ring | Linac Commissionning   ** Alignement Q1Q3 du jour

str1H
0.69
 Q_vs_SolenoScan_at_17-21-28.png 
  1068   Tue May 13 08:05:21 2025 KD, HG, ME Under ProcessLinacTL | LE | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning shift du 13 mai 2025 : conditionnement GUN 8h: mise en chauffe à distance modulateur
et frigo/chiller

Demarrage à 10H
 6x 
  Draft   Thu Nov 6 08:30:52 2025 Entered by Super Team from 134.158.195.141 on Thu Nov 6 08:30:37 2025Under ProcessUrgentTL | LE   08h30  Warm-up ThomX: Modulator,
Laser, Fridge

08h36 Chillers were started,
 SectOutput20251030.pngSectOutput20251106.png 
  789   Tue Aug 1 13:45:55 2023 CB/JNC ProblemTL | Diag libera 2 problem Les BPm doivent être redémarré et
réinitialisé dans jive toutes
les 20 minutes environs.
  
  963   Fri Nov 15 12:13:42 2024 Entered by Nicolas Delerue from 134.158.195.144 on Fri Nov 15 12:13:26 2024Not FixedInfoTL Charge excess in the TL By looking at the BPM transmission tool
one can see that there is more charge on
TL/BP.03 than on TL/BPM.02 (see attached
 Screenshot_from_2024-11-15_12-12-55.pngScreenshot_from_2024-11-15_12-12-46.png 
  1099   Fri Jul 4 12:02:34 2025 ND Shift summaryTL Prise donnees 4/7 Les aimants et les chillers etaient restes
allumes.

11h59 Mise en chauffe
 temp_vs_time.pngtp2spX_vs_time.pngtp2spY_vs_time.pngpos_TL2_spX_vs_temp.png 
  127   Wed Oct 27 17:26:24 2021 Entered by Super Team from 134.158.195.141 on Wed Oct 27 17:26:09 2021Not FixedProblemSY | Linac Commissionning   Après enormément d'interlock
vide sur la PP1, le Klystron n'émet
plus rien.
  
  220   Thu Dec 16 09:53:38 2021 Entered by Super Team from 134.158.195.141 on Thu Dec 16 09:53:20 2021Under ProcessShift summarySY | Linac Commissionning Demarage machine Les chillers sont démarrés
et le modulateur en chauffe

Test de l'influence sur les
  
  239   Mon Jan 10 15:29:06 2022 Entered by Super Team from 134.158.195.141 on Mon Jan 10 15:28:51 2022Under ProcessLinacSY | Linac Commissionning Mise en route Opération : HG, JNC

but
: alignement de la tête de machine.
Nous reprenons l'alignement du Laser,
  