Entry   VM Entered by Super Team from 134.158.195.141 on Thu Nov 21 08:26:43 2024;  
08H25 Start ThomX

09H45 HV is 'ON'

09h49 Breakdown in the RF Gun
Entry   VM Entered by Super Team from 134.158.195.141 on Thu Dec 5 08:31:12 2024;  
08h28 Start ThomX

08h40 Some magnets remain switched off. Cycling was not performed

10h20 V is 'ON'
Entry   VM DN MJ KD; shift du 07 janvier 2026 16x
7h55: mise en chauffe en remote (modulateur, frigo/chillers, laser, cyclage)
11h25 HV is ON

Archivage lance
Entry   VM && HG; Linac commissioning  Vacc_2026-02-11_11-05-31.pngScreenshot_from_2026-02-11_15-57-35.pngCharge_trend_2026-02-11_17-12-31.png
09h12 Warm-up ThomX: Modulator, Laser, Fridge

09h21 Chillers were started, cycling all magnets.

RF 50 pps
Entry   VM;  9x
14h31 Start ThomX/ Modulator, Frig, Laser

14h37 Cycling all magnets, Chillers started

15h34 HV is 'On'
Entry   VM; Modulador problem 
08h38 There is problem with the Linac modulator

08h55 Fixed with Maher help
Entry   VM;  
08h22 ThomX was started: modulator, frig, laser

08h28 Chillers was started, all magnets cycling

09h45 HV is 'ON'
Entry   VM;  
09h00 Warm-up ThomX: Modulator, Laser, Fridge

09h05 Chillers were started, cycling all magnets

10h03 HV is on
Entry   VK/ND/SC; Faisceau Anneau 10x
Modulateur Impossible à passer en Standby ==> problème manque d'eau.

      * Remise à ~4bars le réseau principal

      *  Restart du soft du modulateur (sinon l'erreur reste)
Entry   VK,VM,IC,ND; Operations 18/1 10x
9:05 Git pull

9h14: Demarrage modulateur

10h22 Client 3 does not respond; Reboot the machine
Entry   VK, VM, IC, LS; Restart storage in the Ring 
~9h Start of the modulator

10h Tuning of the injector with KD

11h Try to inject in the ring. Only 1-2 turns after optimization. We tried previous injector settings, the situation is the same. We retuned
Entry   VK, VM, IC, LS; Work on the new ring lattice (August, 2-4) 13x
Starting point nominal lattice D1Thomx_017_064_r56_02_chro00 with the MCF=0.014  chro=0/0

Goal: test the new lattice with MCF=0.0231  chro=0/0 which alows to decrease the RF frequesncy down to 500.25 MHz. This will make possible
operation witht eh FPC.
Entry   VK, VM, IC, KD; Ring commissioning 7x
Start of the machine by KD

11h20 The beam is in the ring

Optimization of the injection with the RCDS
Entry   VK, VM, IC on Thu Feb 29 ; Recomissioning of the SR, search for the revolution frequency  Screenshot_from_2024-02-29_12-15-58.pngScreenshot_from_2024-02-29_14-27-36.pngScreenshot_from_2024-02-29_11-27-21.png
Start of the machine 9h

Optimization of the beam transport to the Ring.

Work on the lattice of the Ring and search for the revolution frequency.
Entry   VK, VM, IC; Recomissioning of the SR, search for the revolution frequency  13x
8h50 Start of the machine

Laser amplifier was somehow OFF. Very strange situation and not clear why it happen. To be understood.

Call Viktor, who came and start the laser.
Entry   VK, VM, IC; Recomissioning of the SR, search for the X-rays Screenshot_from_2024-03-07_09-02-36.png
8h50 Warming up the machine

Problem with the vaccum around the RF cavity (see screenshot attached). Intervention of vacuum team is needed.

Mohamed is installing the powermeter to monitor the incomingt RF power for the accelerating structure.
Entry   VK, VM, HG,IC, AL;  
Shift started with machine receipy from Monday .

Scan parameters, injection to find orbit in the ring. Testing alghrithms for orbit correction.

15.55 Energy , charge not stable, asked Hayg to stabilize .
Entry   VK, IC. VM, ND, LS; beam storage closed_orbit_13062023.pngScreenshot_from_2023-06-13_18-27-36.pngScreenshot_from_2023-06-13_18-25-45.pngScreenshot_from_2023-06-13_17-23-16_WO_RF.png
The main idea fo this week is to prepare the beam for the search of the first X-rays.

Start without RF cavity. Study of the orbit. Orbit correction. We menage to correct hor. and vert. orbit.

We put the RF cavity ON. A lot of interlocks during the day. Difficult to operate i this conditions.
Entry   VK, IC. VM, LS, JNC; Test of the new optics (27-28 July) 6x
Start of the modulator and laser at ~9h and hour later start the beam.

Working at 500.38 MHz to retrieve the previous state of the ring. Then switching to 500.33 MHz (assumed ring proper frequency).

- Optimization of the injection and ring (orbit, betatron/synchrotron oscyllations,  tune....)
Entry   VK, IC. VM, LS; Studies on the beam revolution frequency 12x
The main task for today is to measure the revolution frequency without RF cavity with the spectrum analyzer.

Start-up of the machine.

After setting the previous setting, the orbit was very different. We checked the injector, the beam also was different (based on the beam images)