HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX  Not logged in ThomX    logo
This is a draft message, edit and submit it to make it permanent  
Message ID: 577     Entry time: Wed Oct 5 19:02:28 2022
 Author: VK, VM, HG,IC, AL 
 Status:  
 Type:  
 Category:  
 Important:
 Subject:  
 Icon:  

Shift started with machine receipy from Monday .

Scan parameters, injection to find orbit in the ring. Testing alghrithms for orbit correction.

15.55 Energy , charge not stable, asked Hayg to stabilize .

Ring Dipoles up 160.4A

Problem with steerers : RIC2 STR02-V01 and RIC1/ STR.05-H01 NEED TO BE REPAIRED

Fixed orbit correction gui. Units in libera are [nm] should be in [mm] to correctly scale currents.

 

 

 

 

 

 

 

 

 

ELOG V3.1.4-395e101