Message ID: 1063     Entry time: Fri May 2 08:23:50 2025
 Author: VM 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject:  
 Icon:  

08h22 ThomX was started: modulator, frig, laser

08h28 Chillers was started, all magnets cycling

09h45 HV is 'ON'

There was a problem with the section phase shifter motor. It was fixed by moving the motor a lot.

11h11 RF Gun phase is 149.6 dg., Sect. phase is 207 dg., Att. is 2.77 dB. TL/BPM2 X=0.9 mm. Linac steerers: H [0.54 -2.76], V [-2.29 2.61], -36 pC, -36 pC, -39 pC, RF cav. at 50 kV, phase 21.0 dg. TbTSum in the ring about 2e7

13h0.5 TL optics was set to MADX simulated one. After adjusting the DPI and the septum, charge in the ring and X ray flux did not change. (receipt 20250502_13_04) RF Cav. at 150kV, phase 13.5 dg

13h20 dispersion measurement in the TL

15h38 New lattice loaded, injection was adjusted as well as the ring elements a little bit.

17h00 ThomX was stopped