  Toutes les notes concernant les Commissionning de ThomX, Page 2 of 63  Not logged in ThomX    logo
Entry   VM, MJ, DN, RC; Check point du fonctionnement anneau du 24/02 suite a l'ajout de resistances dipole le 24/02 au soir 7x
08h35 Warm-up ThomX: Modulator, Laser, Fridge

Programme shift : verifier que la recette orbite plate utilisee lors du shift du 24/02/2026 (= orbite
PLATE, vers 15h) est toujours ok apres l'ajout de resistance sur dipole anneau (resistance installee apres le shift, = le 24/02 au soir)
Entry   VM, IC, VK, HG ;  8x
08h25 Start ThomX

09h55 HV is 'ON'

10h18 RF Gun Phase is 159 dg. Sect. Phase is 208 dg. Att. 2.66 TL/BPM2 X=-2mm, Isol =230 A, Charges: -115 pC, -95.7 pC, -100 pC
Entry   VM, IC, VK ;  
08h18 Start ThomX

10h00 HV is 'ON'

10h35 RF Gun phase is 174 dg. Section Phase is  209 dg. Sect. Att. is 2.70 dB TL/BPM2 X=0, Charge is -127 pC
Entry   VM, IC, VK;  6x
9h25 Start ThomX

11h20 HV on, linac RF OK, but there is no laser on the cathode. Trying to fix.

The problem was with the M4 position. initial positions now are: M4 mot.01 2855.00,  M4 mot.02 4631.00,
Entry   VM, IC, VK;  Screenshot_from_2024-12-13_11-28-46.pngScreenshot_from_2024-12-13_14-44-28.pngScreenshot_from_2024-12-13_14-46-59.png
08h23 Start ThomX

09h40 HV is 'On'

10h24 RF Gun Phase 183 dg. Sect. Att. is 2.533, Phase 212 dg. Charges; -100.0 pC, -93.0 pC, -109.0 pC, Linac steerers H [2.68 -4.4], V [-2.0
Entry   VM, IC, VK;  10x
08h25 Start ThomX: Modulator, frigo

08h35 Start chilers, laser, cycling all magnets

10h05 HV is 'On'
Entry   VM, IC, VK; 70 MeV WP 
10h30 Start beam

Since Friday evening the problem to store the beam at 70 MeV. There is 1 turn only. Probably some subsystem failure. At this moment the reason
is not found. Help is needed: synchronization/Diag/Magnets.
Entry   VM, IC, RC;  Screenshot_from_2025-03-31_18-06-59.pngScreenshot_from_2025-03-31_17-52-04.pngScreenshot_from_2025-03-31_17-14-56.png2025-03-31_10_40_04_li_dg_sst_01-ccd_01_RAW.png
08h00 ThomX started by Maher

09h50 Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.

ThomX configuration changed to 'Linac'.
Entry   VM, IC, ND; Measurements 18/4 Screenshot_from_2025-04-18_09-42-24.pnginjection_sequence_blank2ms_009.pnginjection_sequence_blank2ms_003.pnginjection_sequence_blank2ms_002.pnginjection_sequence_blank2ms_036.png
08h21 Thomx Started: modulator, frig, laser

08h27 Chillers started, cycling all magnets

09h32 HV is 'ON'
Entry   VM, IC, DN, RC; Interaction region studies 6x
Goals: Optimization of the IP. Verification of the llaser waist position and electron
beam angle wrt. collision plane.

08h25 ThomX was started; Modulator, Frig, Laser
Entry   VM, IC, DN ;  
08h20 ThomX was started: Modulator, frig, laser

08h27 Chillers were started, cycling all magnets

10h50 HV is 'ON'
Entry   VM, IC, DN;  
08h42 Start ThomX: Morulator, firg, laser

08h47 Chillers, cycling all magnets

10h40 HV is 'ON'
Entry   VM, IC; Ring BLM and charge linearity 6x
Goals: 

- Work on the BLM to have the signals at the injection and from the arc in the ring.

- Study on the ring injection and beam storage at higher beam charge. Check the linearity.
Entry   VM, IC;  9x
Goal: Beam Loss Monitors and Ring injection at high charge. Studies of the injector for high charge. Emittance measurements.


08h33 ThomX was started: modulator,frig, laser
Entry   VM, IC; BBA Ring Errors.jpegScreenshot_from_2025-11-20_14-04-53.png
Goal: Ring BBA

09h14 Unable to start thomx. Need help. Probably problem with cooling water.

12h35 
Entry   VM, IC; 40 MeV operation 12x
8h37 Warm-up ThomX: Modulator, Laser, Fridge

8h44 Chillers were started, cycling all magnets.

9h49 HV is ON
Entry   VM, IC; Check of the 70 MeV with MRSV, Ring studies Screenshot_from_2025-12-12_14-02-43.pngScreenshot_from_2025-12-12_14-02-27.pngScreenshot_from_2025-12-12_14-02-14.pngScreenshot_from_2025-12-12_14-02-02.pngScreenshot_from_2025-12-12_14-01-35.png
08h40 Warm-up ThomX: Modulator, Laser, Fridge

8h45 Chillers were started, cycling all magnets.

10h10 HV is ON
Entry   VM, HG, RC, SC; RF conditionning : 2 aout  
Start from 10 dB 

decrease up to 1 dB : Vacuum is OK decrease up to 10â»8 mBar

11h10 : att.sec 0.7 dB ==> vide in section 1.1 10-8 mbar & vide out section 8 10-9 mbar 
Entry   VM, HG, JN;  Screenshot_from_2026-03-06_18-22-28.png
09h00 Warm-up ThomX: Modulator, Laser, Fridge

09h05 Chillers were started, cycling all magnets

10h03 HV is on
Entry   VM Entered by Super Team from 134.158.195.142 on Fri Mar 14 08:31:03 2025; Streak camera measurements Measurements_summary.pngphase_217.pngphase_224.pngphase_208.pngCR_V1_Blank100ms_linacOptimisedPhase_213_014.png
08h28 Start Thomx: Modulator, Laser, Frig

08h33 Chillers were started, cycling al magnets

9h00 MPS affichage: Arret d'urgence... Appel Nourredine, probleme resolu.