~9h Start of the modulator

10h Tuning of the injector with KD

11h Try to inject in the ring. Only 1-2 turns after optimization. We tried previous injector settings, the situation is the same. We retuned the injector based on our previous experience with

Isolenoid = 234 ->220 A,

Laser phase = 289 -> 288 

LIL phase = 114 -> 110 (Att = 2.04 dB)

Settings are saved.

We found that the injection kicker timing was not good (-7.19 us). We put the previous setting -7.23 us

Problem to start RF Cavity. IP adress problem . A lot of Debug with Jean Noel. Working when not connected to THomx network. Philip is informed.

Machine stay in standby till tomorrow. 

 