Draft
|
Tue Jun 16 11:34:11 2026 |
IC, VM | | Shift summary | |
|
Restart of the accelerator | |
11h20 Try to restart the accelerator. Start-up modulator, laser, fridge, chillers
Problem, with all magnets control All DS are in FAULT state. Help is needed.
It is solved.
MPS prevents klystron output power from turning on. Probably due to the closed FP valve.
15h45 ThomX was stopped. |
|
Draft
|
Wed Jun 17 08:36:20 2026 |
IC, VM | Under Process | Problem | Vide |
|
Restart of the accelerator | |
08h35 Start-up modulator (it was already on standby), laser, magnets, cycling.
As yesterday there is a problem with the MPS to start the machine. We are trying to investigate whether it is related to the vacuum or something else.
Problem with the solenoid COL.01 (Internal Interlock Hard).
Help is needed.
At this moment, apparently we are blocked by the closed vacuum valve of the FPC. To be checked with Nourredine (emails sent).
The vaccum level in the FPC is not yet good to open the valve. Eric will check it.
10h10 Switched to the Linac+TL+EL configuration. HV is on (the modulator was in the local mode). Interlocks even at HV 1200 V, the sect att. 3 dB. Linac 04 vac is high.
10h33 There are breakdowns at 26 dB the section att. and 25 dB of the RF gun att. These are not in vacuum breakdowns. Probably it is the klystron problem.
10h50 The modulator is in the standby mode.
Maher is coming to check the klystron and Jean-Noel is working on the solenoid power supplies.
11h40 Maher fixed problem with the klystron by increasing the filament power. At 84 kV, I = 48.7 A (microperveance 2.0). At 293 kV, I = 294 A (microperveance 1.85, should be 2.0).
12h03 The machine configuration without FP closes the photocathode laser shuter, so we can operate only in the Linac+TL+EL configuration.
12h36 Energy = 50 MeV, Laser Phase 25 dg., Sect. Phase 253 dg., Sect. Att. 2.26 dB, I_Gun -95.0704 pC, I_Linac -92.7397 pC, I_TL -3.7568 pC RF_Ampl. 0 kV, RF_Phase 35.5 dg.
Laser Att. 360, Linac steerers H: [0.31 -2.62], V: [-1.87 2.88]
12h43 Energy = 50 MeV, Laser Phase 26 dg., Sect. Phase 250 dg., Sect. Att. 2.35 dB, I_Gun -101.3924 pC, I_Linac -99.5194 pC, I_TL -101.3812 pC RF_Ampl. 0 kV, RF_Phase 35.5 dg.
13h17 Laser Att. 410 (max) Energy = 50 MeV, Laser Phase 26 dg., Sect. Phase 250 dg., Sect. Att. 2.35 dB, I_Gun -138.8712 pC, I_Linac -135.3968 pC, I_TL -137.4172 pC RF_Ampl. 0 kV, RF_Phase 35.5 dg.
At the moment maximum charge is 135 pC with irise Ø of 1.3 mm (possibly because the laser photocathode shutter is in the wrong position)
13h25 The modulator is in standby mode. Maher can remove the MPS short.
The problem with MPS is the OC/AVAL02 FP valve. It is in two states at the same time: Closed and Open.
It was the OC/AVAL01 FP valve
recipe_recipe_LI_TL_RI_all_20260422_18_34_34.txt loaded
14h54 Beam is in the ring w/o RF. Thank you all !!!!.
15h15 Laser Att. 360, Energy = 50 MeV, Laser Phase 26 dg., Sect. Phase 250 dg., Sect. Att. 2.42 dB, I_Gun -179.1795 pC, I_Linac -205.8011 pC, I_TL -186.6367 pC RF_Ampl. 99.1184 kV, RF_Phase -50 dg.
Laser Att. set to 320 for 100 pC
15h25 Energy = 50 MeV, Laser Phase 26 dg., Sect. Phase 250 dg., Sect. Att. 2.33 dB, I_Gun -96.7941 pC, I_Linac -124.7882 pC, I_TL -102.9734 pC RF_Ampl. 99.1184 kV, RF_Phase -50 dg.
15h28 recipe_recipe_LI_TL_RI_all_20260121_10_35_05.txt loaded. There is storage, but it is necessary to optimize it
15h33 ring_saving
15h35 recipe_recipe_LI_TL_RI_all_20260422_18_34_34.txt loaded
15h36 ring_saving
17h41 ThomX was stopped |
| Attachment 1: Screenshot_from_2026-06-17_15-54-18.png
|
 |
| Attachment 2: Screenshot_from_2026-06-17_15-50-21.png
|
 |
|
Draft
|
Thu Jun 18 07:37:17 2026 |
IC, VM | | Shift summary | |
|
Ring working point studies | |
07h35 Start-up modulator (does not go to standby), laser, magnets, cycling.
9h50 HT ON
~10h30 Electricity cut
14h Restart of all the machine...
Almost all systems were restarted, except for the photocathode laser.
17h40 ThomX was stopped |
|
Draft
|
Fri Nov 15 07:56:03 2024 |
IC, VK, VM, ND | | Shift summary | |
|
Ring studies, MRSV | |
07h50 Start ThomX
09h20 HV is 'ON'
09h25 HV 1215 V
09h52 RF Gun phase 234 dg. Att. 0.0 dB, Charge -110.0 pC; Sect. phase 208 dg., Att. 2.566 dB, TL/BPM2 X +2 mm
10h00 injection to the ring TL/BPM2 X -2 mm
10h02 Ring RF 100 kV
Today compared to yesterday shift the synchrotron oscillation amplitude is very unstable. Phase ? To be investigated.
First beam imaging with the MRSV.
BBA studies
Horizontal plane
BPM3 (BPM.04-Lib.03) dX=1.1 mm
BPM9 (BPM.04-Lib.05) dX=0.8 mm
BPM5 (BPM.06-Lib.04) dX=0.2 mm
BPM11 (BPM.06-Lib.05) dX=-0.3 mm
BPM4 (BPM.05-Lib.04) dX=-0.3 mm
BPM10 (BPM.05-Lib.05) dX=1.2 mm
Set offsets on X in Liberas (OffX)
BPM.01-Lib.03, 130000+1800000 = 1930000
BPM.02-Lib.03, 70000+400000 = 470000
BPM.04-Lib.03, 40000+1100000 = 1140000
BPM.06-Lib.04, 30000+200000 = 230000
BPM.03-Lib.03, 60000+100000 = 160000
BPM.05-Lib.04, 130000-300000 = -170000
BPM.01-Lib.04, 300000+400000 = 700000
BPM.02-Lib.04, 70000+200000 = 270000
BPM.05-Lib.05, 140000+1200000 = 1340000
BPM.06-Lib.05, -20000-300000 = -320000
BPM.04-Lib.04, -50000+800000 = 750000
BPM.03-Lib.03, 60000+100000 = 160000
Vertical plane
BPM12 ri-c1/dg/bpm.01-lib.03 dY = -2.4 mm
BPM1 ri-c1/dg/bpm.02-lib.03 dY = - 0.1 mm
BPM2 ri-c1/dg/bpm.03-lib.03 dY = - 0.5 mm
BPM3 ri-c1/dg/bpm.04-lib.03 dY = -0.2 mm
BPM4 ri-c1/dg/bpm.05-lib.04 dY = -1.0 mm
BPM5 ri-c1/dg/bpm.06-lib.04 dY = - 0.7 mm
BPM6 ri-c2/dg/bpm.01-lib.04 dY = - 1 mm
BPM7 ri-c2/dg/bpm.02-lib.04 dY = - 0.1 mm
BPM8 ri-c2/dg/bpm.03-lib.05 dY = -0.3 mm
BPM9 ri-c2/dg/bpm.04-lib.05 dY = -0.6 mm
BPM10 ri-c2/dg/bpm.05-lib.05 dY = + 0.3 mm
BPM11 ri-c2/dg/bpm.06-lib.05 dY = +0.5 mm
Set offsets on Y in Liberas (OffY)
BPM12 ri-c1/dg/bpm.01-lib.03 dY_new = -300000 -2.4 mm = -2700000
BPM1 ri-c1/dg/bpm.02-lib.03 dY_new = - 10000 - 0.1 mm = -110000
BPM2 ri-c1/dg/bpm.03-lib.03 dY_new = 105000 - 0.5 mm = -395000
BPM3 ri-c1/dg/bpm.04-lib.03 dY_new = 190000 -0.2 mm = -10000
BPM4 ri-c1/dg/bpm.05-lib.04 dY_new = - 110000 -1.0 mm = -1110000
BPM5 ri-c1/dg/bpm.06-lib.04 dY_new = -100000 - 0.7 mm = -800000
BPM6 ri-c2/dg/bpm.01-lib.04 dY_new = -20000 - 1 mm = -980000
BPM7 ri-c2/dg/bpm.02-lib.04 dY_new = 150000 - 0.1 mm = 50000
BPM8 ri-c2/dg/bpm.03-lib.05 dY_new = 0 - 0.3 mm = -300000
BPM9 ri-c2/dg/bpm.04-lib.05 dY_new = - 90000 -0.6 mm = -690000
BPM10 ri-c2/dg/bpm.05-lib.05 dY_new = 70000 + 0.3 mm = 370000
BPM11 ri-c2/dg/bpm.06-lib.05 dY_new = 10000 +0.5 mm = 510000
Studies in single trigget mode. See screenshots.
Beam is stored (sligth decay) in the ring around 15 minutes without touching anything. This opens way for beam dynamics studies and for better understanding of machine. Need to find a way to have diagnostics data (trigger only diag) in such mode.
17h50 Stop ThomX
|
| Attachment 1: Screenshot_from_2024-11-15_17-28-09.png
|
 |
| Attachment 2: Screenshot_from_2024-11-15_17-14-46.png
|
 |
| Attachment 3: Screenshot_from_2024-11-15_17-14-38.png
|
 |
| Attachment 4: Screenshot_from_2024-11-15_17-13-08.png
|
 |
| Attachment 5: Screenshot_from_2024-11-15_17-12-53.png
|
 |
| Attachment 6: Screenshot_from_2024-11-15_17-10-09.png
|
 |
| Attachment 7: Screenshot_from_2024-11-15_17-10-00.png
|
 |
| Attachment 8: Screenshot_from_2024-11-15_17-06-09.png
|
 |
| Attachment 9: Screenshot_from_2024-11-15_17-04-24.png
|
 |
| Attachment 10: Screenshot_from_2024-11-15_16-43-47.png
|
 |
| Attachment 11: Screenshot_from_2024-11-15_16-42-08.png
|
 |
| Attachment 12: Screenshot_from_2024-11-15_16-41-59.png
|
 |
| Attachment 13: Screenshot_from_2024-11-15_16-40-52.png
|
 |
| Attachment 14: Screenshot_from_2024-11-15_16-40-44.png
|
 |
| Attachment 15: 1HzOscScreenshot_from_2024-11-15_16-32-30.png
|
 |
| Attachment 16: Screenshot_from_2024-11-15_17-33-43.png
|
 |
| Attachment 17: Screenshot_from_2024-11-15_17-33-35.png
|
 |
| Attachment 18: Screenshot_from_2024-11-15_17-28-09.png
|
 |
| Attachment 19: Screenshot_from_2024-11-15_17-14-46.png
|
 |
| Attachment 20: Screenshot_from_2024-11-15_17-14-38.png
|
 |
| Attachment 21: Screenshot_from_2024-11-15_17-12-53.png
|
 |
| Attachment 22: Screenshot_from_2024-11-15_17-10-09.png
|
 |
| Attachment 23: Screenshot_from_2024-11-15_17-38-16.png
|
 |
| Attachment 24: Screenshot_from_2024-11-15_12-12-55.png
|
 |
| Attachment 25: Screenshot_from_2024-11-15_12-12-46.png
|
 |
| Attachment 26: Screenshot_from_2024-11-15_12-11-23.png
|
 |
| Attachment 27: Screenshot_from_2024-11-15_12-03-43.png
|
 |
| Attachment 28: Screenshot_from_2024-11-15_11-55-01.png
|
 |
| Attachment 29: Screenshot_from_2024-11-15_11-52-36.png
|
 |
| Attachment 30: Screenshot_from_2024-11-15_11-47-59.png
|
 |
| Attachment 31: Screenshot_from_2024-11-15_11-47-39.png
|
 |
| Attachment 32: Screenshot_from_2024-11-15_11-21-31.png
|
 |
| Attachment 33: Screenshot_from_2024-11-15_11-16-37.png
|
 |
| Attachment 34: Screenshot_from_2024-11-15_10-59-46.png
|
 |
| Attachment 35: Screenshot_from_2024-11-15_17-35-21-2.png
|
 |
| Attachment 36: Screenshot_from_2024-11-15_17-36-04-2.png
|
 |
|
990
|
Thu Jan 9 08:35:10 2025 |
IC, VK, VM, ND | Under Process | Shift summary | Ring |
|
| |
08h35 Start ThomX: Modulator, Frigo, All magnets.
08h40 Cicling all magnets, Start Chillers
10h00 HV is 'On'
Modulator Interlocks at HV=1215V
10h25 HV=1215 V
Rec. from 20241219 18:14
Linac Steerers: H [2.38 -4.16], V [-1.70 2.15]
RF Gun Phase is 199.0 dg., RF Gun Att. is 0 dB, (Dark Current is 18 mV, too low), Sect. Att. 2.53 dB, Sect. Phase is 221 dg.
Charges: -106 pC, -107 pC, -116 pC
10h50 Beam is injected to the ring
Trying the LOCO
12h35 Modulator Interlocks at HV=1215V, Went to 1200 V. Did not help even at 1000V (Maher's intervention needed).
13h00 This is the problem with triggering. When triggered internally, the modulator is working.
13h07 OK at HV=1215 V (Unknown reason). Nikolas said miss triggering is less than 5%
13h20 Linac frequency was changed a little bit to diminish miss triggering
18h00 Stop ThomX
|
| Attachment 1: Screenshot_from_2025-01-09_16-00-44.png
|
 |
| Attachment 2: Screenshot_from_2025-01-09_14-24-06.png
|
 |
| Attachment 3: Screenshot_from_2025-01-09_11-11-21Change_inRingChargedueLinacEnrgy.png
|
 |
| Attachment 4: TL_SST01_Screenshot_from_2025-01-09_10-34-15.png
|
 |
| Attachment 5: Screenshot_from_2025-01-09_10-32-26.png
|
 |
| Attachment 6: Screenshot_2025-01-09_10-30-03.png
|
 |
| Attachment 7: Screenshot_from_2025-01-09_16-03-40.png
|
 |
| Attachment 8: Screenshot_from_2025-01-09_16-31-08.png
|
 |
| Attachment 9: Screenshot_from_2025-01-09_17-55-28.png
|
 |
| Attachment 10: Screenshot_from_2025-01-09_17-52-20.png
|
 |
| Attachment 11: Screenshot_from_2025-01-09_17-49-53.png
|
 |
| Attachment 12: Screenshot_from_2025-01-09_17-39-00.png
|
 |
| Attachment 13: Screenshot_from_2025-01-09_17-38-38.png
|
 |
| Attachment 14: Screenshot_from_2025-01-09_17-38-03.png
|
 |
| Attachment 15: TrendTBTSumScreenshot_from_2025-01-09_18-06-08.png
|
 |
|
993
|
Fri Jan 10 08:24:25 2025 |
IC, VK, VM, ND | Under Process | Shift summary | Ring Commissioning |
|
| |
08h25 Start ThomX: Modulator, Frigo, cycling all magnets
08h30 Start chillers
10h00 HV is 'On'
10h25 RF Gun Phase is 193 dg., Sect. Att. is 2.46 dB, Phase is 218 dg. Charges: -98 pC, -105 pC, -106 pC
Linac steerers: H [2.38 -4.16], V [-1.8 2.15]
Ring injection. After cycling Ri-C1 QP5 is out of order, fixed
10h30 Beam is in the ring, Rec. from 20250109_17_23, TL/BPM02 X=+3 mm
11h00 setings for ring without sextupoles for LOCO
11h04 setings for ring without sextupoles for LOCO (Matlab config file) is saved
The same with sextupoles.
Trying LOCO with sextupoles: LOCO inprove results on storage and tune. Tune changed from 0.15 to 0.17
13h30 HV is 'Off'. Controled access to the bunker.
13h55 HV is 'On'
/tmp_mnt/data/shared/commissioning_scripts/MatLab/pilotage/libera_calctunesS_ThomxOperateur.m to measure tune from operateut.thomx account
16h55 Stop ThomX
|
| Attachment 1: Screenshot_from_2025-01-10_16-35-44.png
|
 |
| Attachment 2: Screenshot_from_2025-01-10_16-03-43.png
|
 |
| Attachment 3: Screenshot_from_2025-01-10_15-51-56.png
|
 |
| Attachment 4: ChargeTransitionScreenshot_from_2025-01-10_14-51-56.png
|
 |
| Attachment 5: Screenshot_from_2025-01-10_12-45-41.png
|
 |
| Attachment 6: Screenshot_from_2025-01-10_12-03-50.png
|
 |
| Attachment 7: Screenshot_from_2025-01-10_11-13-55.png
|
 |
| Attachment 8: TBTSumScreenshot_from_2025-01-10_10-59-16.png
|
 |
| Attachment 9: Screenshot_from_2025-01-10_10-58-28.png
|
 |
| Attachment 10: Screenshot_from_2025-01-10_10-58-14.png
|
 |
|
955
|
Thu Nov 7 08:53:22 2024 |
IC, VK, VM, JN | Under Process | Shift summary | Ring |
|
| |
8h50 Start of the modumator and all subsystems
PC client 1 was frozen => we restarted
10h20 HV on 1215 V
RF gun phase 28 dg., Att. 0.0 dB, Charge -106 pC
The beam shape at screen TL/DG/SST.01 is very strange. Big change. Try to allign the QP1 QP3
Steerers: H [2.48 -4.46]; V [-1.86 2.29]
Section Att. 2.77 dB, Phase 208, TL/BPM2 X= 0.1
11h45 Ring injection. Ri-c2/ps/str.06-h.01 and Ri-c2/ps/str.06-v.01 tango servers were off
12h59 Measure Beem energy with TL Steerer: 53.2 MeV (screenshot), TL/BPPM2 X about zero.
12h53 Start ring RF
14h0 Section chiller 'off' (unknown reason), Energy start to drop . Switch to 'on'.
15h27 Modulator on Standby
16h30 HV on.
16h37 Modulator 'off' voluntary. Unknown reason.
17h55 HV 'on' 1215 V, Section Phase 217, -125 pC
18h30 'access controle' to install shunt resistances of 33 Ohm at four magnets (close placed).
18h55 HV 'on' 1215 V, Section Phase 217, -125 pC
Orbit at straight sections goes down on 2 mm.
19h13 Stop ThomX
|
| Attachment 1: Screenshot_from_2024-11-07_10-57-55.png
|
 |
| Attachment 2: TL_SST1_QP1QP3ZeroScreenshot_from_2024-11-07_10-58-30.png
|
 |
| Attachment 3: TLSST1QP1QP3onScreenshot_from_2024-11-07_11-00-47.png
|
 |
| Attachment 4: Screenshot_from_2024-11-07_19-09-59.png
|
 |
| Attachment 5: Screenshot_from_2024-11-07_19-01-44.png
|
 |
| Attachment 6: Screenshot_from_2024-11-07_18-56-43.png
|
 |
|
Draft
|
Thu Dec 19 11:10:03 2024 |
IC, VK, VM | Under Process | Shift summary | Ring Commissioning |
|
| |
11h05 Start ThomX
11h50 BPM02-Libera04 wiring has been checked: 'OK'
12h20 HV is 'ON' 1215 V
12h31 RF Gun phase is 179 dg.
12h48 RF Gun phase is 181 dg. Sect. Att. 2.534 dB, Phase is 213 dg. Linac Steerers H [2.98 -4.66], V [-1.8 2.15]
14h50 HV on Standby. Controlled access
15h20 HV is 'ON'
17h50 Reajust linac transport: linac steerers H [2.38 -4.18], V [-1.9 2.05] Charge -121 pC, -114 pC, -123 pC
18h55 Stop ThomX |
|
956
|
Fri Nov 8 09:35:41 2024 |
IC, VK, JN | Under Process | Shift summary | Ring |
|
ring studies | |
8h50 Start of the modumator and all subsystems
Beam studies.
Orbit Correction.
Transport only with dipoles - turn at 161.4A
Frequency from 500.0853 change to 500.0913
Tries BBA
16h12 Problem with sudden change of params.
Recepies did nopt store corrected orbit: due to erro in EL steerer.
In continuation to yesterday study Jean Noel soldered in parallel 33 ohm : effect on orbit visible . Need to find correct shunt resistance (temperature) and power > 10 W.
Power supply does not show any sign of problem.
18.40 End of shift |
| Attachment 1: scan_charge_phase_min_0.0_max_360.0_10_11_13.png
|
 |
| Attachment 2: Screenshot_from_2024-11-08_12-01-54.png
|
 |
| Attachment 3: Screenshot_from_2024-11-08_12-10-59.png
|
 |
| Attachment 4: Screenshot_from_2024-11-08_12-31-24.png
|
 |
| Attachment 5: Screenshot_from_2024-11-08_12-31-48.png
|
 |
| Attachment 6: Screenshot_from_2024-11-08_12-38-19.png
|
 |
| Attachment 7: Screenshot_from_2024-11-08_12-42-58.png
|
 |
| Attachment 8: Screenshot_from_2024-11-08_13-16-14.png
|
 |
| Attachment 9: Screenshot_from_2024-11-08_13-49-36.png
|
 |
| Attachment 10: Screenshot_from_2024-11-08_14-34-45.png
|
 |
| Attachment 11: Screenshot_from_2024-11-08_16-12-07.png
|
 |
| Attachment 12: Screenshot_from_2024-11-08_18-26-43.png
|
 |
| Attachment 13: withWORF5000913Screenshot_from_2024-11-08_12-11-51.png
|
 |
|
1177
|
Thu Jan 8 09:07:08 2026 |
IC, HG, RC, DN, JM | Under Process | Shift summary | LI | TL | LE | Ring | Linac Commissionning | Ring Commissioning |
|
Test of the new receipt from BMAD Isol = 242 A | |
8h55: mise en chauffe (modulateur, frigo/chillers, laser, cyclage)
10h20 HV ON
Start with the receipt nominal. problem with the RF gun laser camera. Solved.
Going to the new receipt for Isol = 242 A
Tuning injection. Good storage.
We performed sveral scans with FPC. The measured vert beam siwe is about 82 um. The best X-ray fluc I3+I4 was about 30-40 kpA.
The size at MRSv hor/vert is about 15/19 pixels
Starting from a certain moment, the trig to trig injection stability changed. See the screenshot. This to be understood.
Going to nominal receipt. After the tuning of the injection, the good storage is obtained. Size at MRSV 15/24 pixels
measurements of the dispersion and LOCO studies. First without sextupoles and later with. To be continued.
Going back to new receipt Isol = 242 A. Storage is bad. Retuning of the TL and injeciton. Good storage is obtained with good tunes 0.17/0.7.
Studies with X-rays will be continued tomorrow.
dispersion and beta function measurement as tunes are seems to be quite stable
Switching on the streak camera.
Phases during the day:
RF Gun: 296; 229; 242
RF section: 218; 209; 218
|
| Attachment 1: Screenshot_from_2026-01-08_12-19-34.png
|
 |
| Attachment 2: Screenshot_from_2026-01-08_12-06-27.png
|
 |
| Attachment 3: Screenshot_from_2026-01-08_12-39-03.png
|
 |
| Attachment 4: Screenshot_from_2026-01-08_12-39-34.png
|
 |
| Attachment 5: Screenshot_from_2026-01-08_12-46-37.png
|
 |
| Attachment 6: Screenshot_from_2026-01-08_12-47-55.png
|
 |
| Attachment 7: Screenshot_from_2026-01-08_12-50-17.png
|
 |
| Attachment 8: Screenshot_from_2026-01-08_13-15-31.png
|
 |
| Attachment 9: FWHM_Trend_Screenshot_from_2026-01-08_13-43-57.png
|
 |
| Attachment 10: Screenshot_from_2026-01-08_14-14-01NOM.png
|
 |
| Attachment 11: Screenshot_from_2026-01-08_14-32-38nominal.png
|
 |
| Attachment 12: Screenshot_from_2026-01-08_17-22-16BMAD242.png
|
 |
| Attachment 13: Screenshot_from_2026-01-08_17-36-18.png
|
 |
|
Draft
|
Wed Jun 3 08:41:41 2026 |
IC, HG, JNC | | Shift summary | |
|
Restart of the accelerator | |
02/06/2026
~15h30 Starting all system
16h Start up of the modulator, laser, magnets
Problem with the shutter, it is in the orange state. |
|
1094
|
Thu Jun 26 08:55:15 2025 |
IC, DN, RC, HG, ME | Under Process | Shift summary | Ring Commissioning |
|
Improve ring for X-rays | |
Goal: Vertical orbit and angle at the IP with I3 and I4 X-ray signals
8h55 Switch ON the modulator and all the machine
Camera SST2 : impossible de changer le temps d'expo and SST3 not started 
- Phase max Q = 333° with Q = 130 pC
- Phase Sec : 203° and Att = 2.46 dB
- Aligned quads
With the previously saved receipt, the injection and charge of the stored beam was quite bad. We tried several receipts. We tried to tune the ring till ~16h.
The FPC was operated in synchronous mode with the power twice less as typical value.
The TL transport was different from previously used. We should try to keep the same orbit in the TL for reproducibility.
The FPC scan showed the two peaks structure => to be understood.
Then, we re-loaded the lattice from folder Reference (changed the laser position @photocathode). With the energy-phase adjustments we arrived to the resonable conditions. The FPC scan is attached.
Both I3 and I4 were recorded/displayed during the shift. In this configuraiton, the X-ray signal was mainly maximized and I3 ~7k-8k pA (I4~ a few hundreds of pA).
The vertical orbit was modifief to have zero angle at the IP. See the plot attached.
In this configuraiton, the X-ray signal was almost equally shared between I3 and I4 ~ 1k pA.
A proper conditions and FoM should be defined for further optimization procedures.
18h15 STOP THOMX |
| Attachment 1: flat_orbit2025-06-26_17-49-26.png
|
 |
| Attachment 2: flat_orbit2025-06-26_17-52-31.png
|
 |
| Attachment 3: flatOrbit_FPCmanualScan2025-06-26_18-00-39.png
|
 |
| Attachment 4: oscillations_synchro_sortie_BPM_2025-06-26_15-51-10.png
|
 |
| Attachment 5: Screenshot_from_2025-06-26_17-03-44.png
|
 |
| Attachment 6: SimilarI3I4_2025-06-26_18-06-49.png
|
 |
| Attachment 7: TLSST2_BeamProfile.png
|
 |
|
669
|
Wed Jan 18 14:02:39 2023 |
IC | Under Process | Anneau | Aimants |
|
RE: Test cyclage aimants | |
I have decresed the Imax to 8 A and loaded the new cycling curves
RI-C1/PS/QP.06 and RI-C2/PS/QP.02: normally cycling with Imax 8 A , finish without error => PS to be checked for Imax >8 A (nominal 10 A
| ND wrote: |
|
17h25: Test de cyclage de
RI-C1/PS/QP.05
RI-C1/PS/QP.06
RI-C2/PS/QP.02
Resultats
RI-C1/PS/QP.05
RI-C1/PS/QP.06: Failed at 11% when magnet reached 10A => Ne pas cycler au dela de 9.4A
RI-C2/PS/QP.02: Failed at 11% when magnet reached 10A=> Ne pas cycler au dela de 8.5A
|
|
| Attachment 1: cylage_quad8A.png
|
 |
|
Draft
|
Thu Jan 15 09:09:37 2026 |
IC | Under Process | Shift summary | |
|
Ring studies | |
08h56 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.
Low SF6 pressure.
10h20 HV ON
Tuning of the Linac. Charge at ICT1 is about 100 pC
Load the nominal receipt.
Modulator put to stand by. Lunch break.
13h16 HV ON
Application of the quadrupol calibration curve -12..12 A.
NEW
K1i_model =
-1.5941
-1.5941
-1.5941
-1.5941
K2i_model =
3.2615
3.2615
3.2615
3.2615
K3i_model =
-6.1107
-6.1107
-6.1107
-6.1107
K4i_model =
5.4292
5.4292
5.4292
5.4292
K5i_model =
-3.5901
-3.5901
-3.5901
-3.5901
K6i_model =
2.3630
2.3630
2.3630
2.3630
>>
OLD
K1i_model =
-1.5473
-1.5473
-1.5473
-1.5473
K2i_model =
3.1987
3.1987
3.1987
3.1987
K3i_model =
-6.0302
-6.0302
-6.0302
-6.0302
K4i_model =
5.3524
5.3524
5.3524
5.3524
K5i_model =
-3.5248
-3.5248
-3.5248
-3.5248
K6i_model =
2.3082
2.3082
2.3082
2.3082
Machine-Model studies.
Nominal receipt
Before LOCO
=== dQ/dx comparison (axis: delta (dk*steps)) ===
Family dQx/dx(M) dQx/dx(T) ratio dQy/dx(M) dQy/dx(T) ratio
QP1 +4.975e-01 +5.370e-01 0.927 -3.362e-01 -4.067e-01 0.826
QP2 +7.289e-01 +8.119e-01 0.898 -2.407e-01 -2.830e-01 0.851
QP3 +2.198e-01 +2.420e-01 0.908 -9.850e-01 -6.102e-01 1.614
QP4 +1.026e+00 +1.136e+00 0.903 -2.736e-01 -2.968e-01 0.922
QP31 +6.600e-02 +7.543e-02 0.875 -2.357e+00 -1.288e+00 1.830
QP41 +5.350e-01 +6.000e-01 0.892 -1.024e+00 -5.563e-01 1.841
LOCO studies.
Checked that the first turn on which we inject now is 13-14th.
18h20 STOP THOMX
|
| Attachment 1: Screenshot_from_2026-01-15_11-04-16.png
|
 |
| Attachment 2: Screenshot_from_2026-01-15_11-33-33.png
|
 |
| Attachment 3: Ri_C1_Quads_is_off_Screenshot_from_2026-01-15_18-19-14.png
|
 |
| Attachment 4: Screenshot_from_2026-01-15_16-42-27.png
|
 |
| Attachment 5: Screenshot_from_2026-01-15_17-36-28after1LOCO.png
|
 |
|
Draft
|
Mon Feb 23 09:43:36 2026 |
IC | | | |
|
Ring studies | |
9h40: mise en chauffe (chillers/frigo, modulateur, cyclage)
HV ON
The ICT signal (GUN) is frozen. Need help to restart it. Use the BPM SpSum instead.
13h Beam in the ring.
RF gun phase 31 dg., Sect. att. 2.47 dB, Sect. phase 237 dg., charges (ICT): about -120 pC
17h16 ThomX stopped
|
|
Draft
|
Mon Apr 20 10:37:11 2026 |
IC | | Shift summary | |
|
| |
10h30 : mise en chauffe (frigo/chillers, modulateur, laser, cyclage)
All rondes are broken, THOMX key is turned. What is the reason of this intervention?, There is nobody around. Jean-Noel came and helped to solve the problems.
Help is needed to set up everythiing (rondes sous-sol, PSS....) and tune the photocathode laser. |
|
35
|
Fri Jun 11 18:47:23 2021 |
Hayg | Reference Solution | Linac | RF D1 |
|
DS pour les températures des chillers |
|
Listes des Ds pour les températures des chillers
- GUN : ER/HF/RAC.17-API.AI1/AI2
- Section : ER/HF/RAC.17-API.AI1/AI1
Emplacements :
- Sortie Chiller : AI1 en Volt
- Sortie Clarinette : AI2 en °C
- PT100 Structure : AI3 en °C
|
|
70
|
Fri Sep 17 12:02:40 2021 |
Hayg | Not Fixed | Problem | Linac Commissionning |
|
Conditionnement Canon | |
Conditionnement du canon
Niveaux de vide pendant le conditionnement :
- toujours le vide 1, à l'avant du Canon qui domine
- Pas de claquages aux valeurs de puissance atteintes, environ 150 kW
- Vide / sécurité : Les pompes ioniques ont été mises en local afin de mettre le seuil d'interlock à 10E-7 mBar
- les interlocks n'ont pas fonctionné
- pour que les interlock fonctionnent, il faut se mettre en reseau profibus, mais le seuil passe alors à 5E-6 mBar.
- Le vide (Jauges) a toujours une structure temporelle de periode 2 min environ
- Le RGA a été démarré en soirée pour Lundi
- Un boitier jauge a été mis en place dans la casemate pour comprendre la structure temporelle des signaux de vide (en trouver la cause)
- Côté CC :
- pour éviter des soucis avec les modifications des valeurs des atténuations, le changement de la valeur pourra se faire par les fleches par valeur de 0.5 dB
|
| Attachment 1: Thomx.png
|
 |
| Attachment 2: Thomx1.png
|
 |
|
1136
|
Mon Oct 13 13:40:05 2025 |
Hayg | Under Process | Info | Linac Commissionning |
|
Emittance QP3 | |
QP3 scan
vary Soleno
Iris 1mm ATT 400 (150 pC)
|
|
1179
|
Mon Jan 12 13:51:05 2026 |
Hayg | Under Process | Info | LI | TL |
|
Monday Shift : Q-scan + Data (Active Learning) |
|
Mesures du jour :
- Quad scans à QP1 pour voir d'autres points de fonctionnement avec une matcihing anneau correct (Figure de merite <1 ?)
- autres points Solé
- autres points Q > 100pC (jusqu'à 300pC)
- Active learning pour données TL jusqu'à TLSST3 inclus.
Attenuation laser : 320 pour pour avoir 100 pC @ Emax
Alignement Quads + minimisation disp E ok
14h40 : Laser s'est arreté ... le Ds s'est mis en fault --> soucis de liquide de refroidissement
--> intervention de kevin
18h04: plus de trig (Synchro? ) --> trigger ne clignotte plus
18h20 : Stop ThomX
|