  539   Tue Sep 6 08:28:09 2022 AM ND LP KD et al Shift summaryAimants Démarrage de la machine 

8h20 : EXTINCTION DE TOUTES LES INTERFACES LAISSÉ EN PLAN !!!
Certaine interface avait même planté depuis hier soir (horloge bloqué a ~18h30)
Il vaut mieux les éteindres avant de partir le soir !

8h30 : Demarrage machine :
- Allumage chiller/frigo

9h: Mise en chauffe du modulateur

9h20: Chiller RF Section n'atteint pas la consigne

Client4 est tres lent/inutilisable

9h35 Intervention Maher: Chiller RF Section OK

10h Resisistivite en baie 18: 5MO

10h11 Cycling des aimants en cours

Intervention sur EL/DP/PS.01 en parallele

10h13 HV ON

10h20 RI-C1/PS/DP.01 avait ete eteint.

Demarrage de RI-C1/PS/DP.01 Relance du cyclage; Probleme de debimetre (repare)

10h34 Fin du cyclage

Trig difficile a obtenir sur le modulateur (Pb vide)

10h50: Faisceau

11h00 Test DS Laura sur LI/DG/SST.01

11h10: Scan charge phase

Phase charge max= 345 deg => Max energy 315 deg

Operation avec phase laser/RF  315deg

Utilisation de la recette recipe_test 20220902 18 41 38.txt

11h45

Faisceau sur TL/DG/SST.01

Recette: recipe_LI_TL_straight_20220906_11_45

11h58 Faisceau sur TL/DG/SST.02

Attention il faut ajuster le courant du dipole a 158.10 pour compenser le champ des  dipoles de l'anneau

12h... Faisceau faible ur TL/DG/SST.02 a cause de l'etalement de la charge

12h50 Faisceau sur TL/DG/SST.03

15h Nombreuses pertes modulateur

15h30 Intervention EP.

Il faut mettre Current a 6A et Voltage a 106V

16h09: Nouvelle phase: 312

Apres.... Recherche du signal...

Rien trouve

 

 

 

  Draft   Wed Apr 8 07:29:51 2026 7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)    , entered from 127.0.0.1 

7h30 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

8h30 HV is ON

recipe_recipe_LI_TL_RI_all_20260402_14_37_41.txt loaded

10h16 Energy = 50 MeV, Laser Phase 72 dg., Sect. Phase 220 dg., Sect. Att. 2.51 dB, I_Gun -116.9607 pC, I_Linac -140.3135 pC, I_TL -131.2199 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
10h18 Energy = 50 MeV, Laser Phase 72 dg., Sect. Phase 220 dg., Sect. Att. 2.51 dB, I_Gun -98.3498 pC, I_Linac -120.5804 pC, I_TL -111.3074 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.

11h19 Energy = 50 MeV, Laser Phase 75 dg., Sect. Phase 219 dg., Sect. Att. 2.62 dB, I_Gun -92.4726 pC, I_Linac -115.7833 pC, I_TL -106.6548 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
13h55 Energy = 50 MeV, Laser Phase 79 dg., Sect. Phase 224 dg., Sect. Att. 2.58 dB, I_Gun -94.4872 pC, I_Linac -117.7063 pC, I_TL -107.6493 pC RF_Ampl. 148.7161 kV, RF_Phase -36.5 dg.
 

 

  772   Fri Jun 16 09:36:07 2023 VK, IC. VM, AL, ND, LS Shift summaryRing Commissioning Orbit correction, optimization of the storage, study of the RF frequency 

9h30 Start of the modulator and lasser (GATE is closed).

9h46 Data is taken as background.

Cavity is tuned to 500.38 MHz. Optimization of the energy and phase. 

RF cavity OFF. After previous tuning, the orbit is the same. Based on the simple calculation, to match to orbits, the RF frequency should be reduced by 60 khz.

New tuning of the cavity at 500.32 MHz.

After energy and phase optimization, the storage is obtained with a small dispersive orbit. Probably the real frequency is 500.33 MHz.

Test to decreaase the frequency to see at which frequency we can operate with the FPC if needed. Tuning of the cavity at 500.22 MHz. No storage obtained.

New test at 500.27 MHz. The beam storage is obtained with the dispersive orbit. Machine is depleted. At the moment the lowest frequency at which we can potentially operate is 500.27 MHz.

Coming back to the machine frequency of 500.33 MHz. Storage is obtained. Optimization to be done.

Data are taking at each configiration.

During the shift, we monitored the beam losses measured by 3 connected fibers. The turn-by-turn losses are clearly visible.

Attachment 1: scan_charge_phase_min_0.0_max_360.0_12_0_49.png
scan_charge_phase_min_0.0_max_360.0_12_0_49.png
Attachment 2: Screenshot_from_2023-06-16_16-35-09.png
Screenshot_from_2023-06-16_16-35-09.png
Attachment 3: Screenshot_from_2023-06-16_15-26-04_50023MHz.png
Screenshot_from_2023-06-16_15-26-04_50023MHz.png
Attachment 4: Screenshot_from_2023-06-16_16-57-16.png
Screenshot_from_2023-06-16_16-57-16.png
Attachment 5: Screenshot_from_2023-06-16_14-50-56.png
Screenshot_from_2023-06-16_14-50-56.png
Attachment 6: Screenshot_from_2023-06-16_14-44-53.png
Screenshot_from_2023-06-16_14-44-53.png
Attachment 7: Screenshot_from_2023-06-16_14-39-16.png
Screenshot_from_2023-06-16_14-39-16.png
Attachment 8: Screenshot_from_2023-06-16_17-00-15_50033MHz.png
Screenshot_from_2023-06-16_17-00-15_50033MHz.png
  901   Tue Aug 13 10:28:30 2024 M ELKUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Suite conditionnement section 13/08 pour validation  

Vérification Pression SF6 =2.45 bar

Vérification Températeure chiller Clarinette =30 +/_ 0.1 °C (consigne 29.20°C)

Vide section sans HF @ 30 °C: In section 5.3 10-10 mbar & Out section 6.6 10-10 mbar

Impossible de mettre HV => erreur  de lecture de débit modulateur ==> intervention de Maher (redemarrage nécessaire de PC modulateur)

signaux RF mesurés :

avec Oscillo :

orange : reflechi section Prs

violet: incident section Pis

vert: refléchi Klystron Prk

jaune : incident Klystron Pik

avec la carte Redpitaya:

vert : puissance transmise dans la charge fin de section : P charge section

rouge : puissance reflechi section  Prs

blue: puissance incidente section Pis

* Reprise conditionnement 3µs & 25 Hz et faire durer le conditionnement à l'étape de la puissance nominale (att. sec = 0.1 dB correspondant à Pisection =24 MW)

* Mettre Att. sec @ 10 dB

* Augmenter progressivement HT de Alim 1000 V @ Alim 1215 V _HT 289 kV (Pik=33 MW)

* Faire baisser Att. sec progressivement

A partir de la valeur att. sec =1 dB on baisse l'att sec d'un pas de 0.1 dB

Att. sec = 0.9 dB (Pis= 20 MW) ==> vide In section 6.9 10-9 mbar & vide Out section 1.9 10-9 mbar

Att. sec = 0.5dB (Pis= 22 MW) ==> vide In section 6.6 10-9 mbar & vide Out section 3.7 10-9 mbar

13h30 : Att. sec = 0.1dB (Pis= 24 MW) ==> vide In section 5.3 10-9 mbar & vide Out section 2.6 10-9 mbar ==> voir capture ecrans RF signals jointes

16h00: Att. sec = 0.1dB (Pis= 24 MW) ==> vide In section 3.2 10-9 mbar & vide Out section 2.2 10-9 mbar ==> Au bout deux heures et demi la pression in section baisse et reste stable à 3.2 10-9 mbar quant à la pression out section  baisse légerement et reste  stable autour de 2.2 10-9 mbar . 

Fin 16h00

NB: un autre test est programmée vendredi 16/08 pour finaliser et valider le conditionnement de la section à sa puissance nominale  (Pis=24 MW) .

 

Attachment 1: Scope_RF_signals_0.1dB_3µs_25Hz_13082024.png
Scope_RF_signals_0.1dB_3µs_25Hz_13082024.png
Attachment 2: Redpitaya_RFsignals_0.1_dB_3µs_25_Hz_13082024.png
Redpitaya_RFsignals_0.1_dB_3µs_25_Hz_13082024.png
  Draft   Tue Apr 4 15:21:51 2023      , entered from 134.158.195.141 
<p>12h10: Mise en chauffe modulateur, laser et chiller + PA</p>

<p>14h30: mesure phase relative sortie pilote/ sortie PA&nbsp; Vrms pilote, Vrms PA&nbsp; &nbsp;<strong>Sans HT dans le Klystron</strong></p>

<p>s&#39;il vous plait,&nbsp; Indiquez l&#39;heure du passage&nbsp;&nbsp;sous haute&nbsp; tension (pour voir si cela change quelque chose &agrave; aux mesures RF) MERCI</p>

<p>15h03 modulateur trig</p>

<p>Wave catchers arretes soft - Vincent les a redemarre (c&#39;est la 2eme fois) Est-vr</p>

<p>&nbsp;</p>

<p>&nbsp;</p>