HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 18 of 61  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Status Type Category Important Subject Icon Text Attachments
  882   Tue Jul 9 14:43:10 2024 JNC, MO, KDUnder ProcessInfoRF D1 | Linac Commissionning test nouveau atténuateur V3 MegaIndustry ATTENTION : KLYSTRON BRIDE A
1215V, HT 288.7kV (32.5MW).

montage charge derrière
 trend_montee_puissance_attenuateur.pdftrend_3us_1215V_30dB_PiK.dattrend_3us_1215V_30dB_PrK.dattrend_3us_1215V_10dB.pdfoscilloscope_3us_1215V_30dB.png 
  881   Fri Jun 28 14:37:19 2024 Entered by Super Team from 134.158.195.141 on Fri Jun 28 14:37:07 2024 LinacLI | RF D1 Tests reseau RF : branche attenuateur charge en position après atténuateur,
10Hz, 3us, 1220V

Ca claque à 15dB et 10dB,
 test_sur_charge_config.2.pptx 
  880   Thu Jun 27 16:14:38 2024 Entered by Super Team from 134.158.195.141 on Thu Jun 27 16:14:24 2024 LinacLI | RF D1 Tests reseau RF Charge en sortie diviseur cote section

HT = 1220V (35MW), 10Hz , 3us

Attenuateur cote canon 30 dB
 test_sur_charge_config.1.pptx 
  879   Tue Jun 11 08:44:30 2024 M EK, NDUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning claquage et test micros 8:30 impossible de mettre en chauffe modulateur

Pompe ThomX HS

Dalkia a été contacté
 6x 
  878   Mon Jun 10 13:36:25 2024 KD, CJ, WE, GO, VC, NDUnder ProcessShift summaryLinac Commissionning claquage et test micros 9h: accès sous-sol

12h: démarrage modulateur
pour test micro (atténuateur à
 11x 
  877   Fri Jun 7 09:24:59 2024 Entered by Super Team from 134.158.195.141 on Fri Jun 7 09:24:42 2024New SolutionShift summaryInfra | Linac Commissionning Interventions du matin 9h Intervention sur les filtres de la CTA
(Dalkia, Stéphane)

9h Intervention dans les sous-sols
  
  876   Thu Jun 6 08:29:19 2024 M EK, SC, ND, VCUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 6/06 8h20 : mise en chauffe de modulateur

start frigo et chiller section

Pression SF6 2.6 bar
 1100V_3us_10Hz_attsec_16dB.png1120V_3us_10Hz_attsec_16dB.png 
  875   Wed Jun 5 09:49:26 2024 MJ MK HG WKUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning conditionnement section - On augmente l'attenuation pour démarrer
(7 dB)
- 2 µs @ 10 Hz
 3us_10Hz_30dB_breakdown_SF6_OK.png3us_10Hz_30dB_breakdown_etrange_SF6_OK.png3us_10Hz_30dB_normal_condition_SF6_OK.png0_2us_10Hz_0_2dB_SF6_OK.png0_5us_10Hz_0_2dB_SF6_OK_vide.png 
  874   Tue Jun 4 08:38:05 2024 MEK RC Under ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 04/06 8h30 start chauffe modulateur

start frigo & chiller

sonde radioprotection TN en defaut
 Pik35MW_1µs_10_Hz_2024-06-04_11-05-13.pngPik_35_MXW_3µs_10Hz_vide__2024-06-04_11-07-17.pngPik_35_MW_3dB_1µs_10Hz__reflechi_Kly_2024-06-04_11-15-52.pngRF_signals__Pik_35_MW_2.9_dB_3µs_10HZ_-06-04_11-43-04.pngvide__Pik_35_MW_3dB_3us_5Hz_2024-06-04_11-47-55.png 
  873   Mon Jun 3 08:38:52 2024 MJ EK, KD, ICUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning conditionnement section 03 juin 8H15 : Mise en chauffe modulateur 

start frigo et chiller section 

3 microsec 5 Hz attenu 6 dB (PIS
 13x 
  872   Fri May 31 08:08:56 2024 M EK, IC, DN, SC Under ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning   8h10 : Impossible de mettre en chauffe
le modulateur via IHM

En local également impossible
 6x 
  871   Thu May 30 08:36:04 2024 MEK, ND, VC, Under ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 30/05 icon8.gif 08h30: set to stanby modulator

start frigo & chiller section

start cond. @ 2 dB ( Pis= 16 MW)
 1.5_dB_2µs_5Hz_RF_breakdown.png1.1dB_2µs_5Hz_RF_breakdown_réseau_HF.png 
  870   Wed May 29 08:47:44 2024 M EK, KD, DN, HGUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 29/05 8h45: set to standby Modulateur

start Frigo et chiller section

start cond. @ 1.4 dB ( Pis=18 MW)
 1dB_1us_5Hz_interlock.png 
  869   Tue May 28 09:30:48 2024 MEC,SC, MO, RC Under ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 28/05 8h30 : Set to standby modulator

Vérification des cables
de chaines de mesures : constat un pb au
 scope_0.9dB_3us_1Hz_11h28.pngcapture_zoom_vide_0.9dB_3us_1Hz.png1dB_3us_1Hz.png0_6dB_3us_1Hz.png 
  868   Fri May 24 14:53:09 2024 ND InfoRF D1 Notifications sonores changement d'etat klystron Ajout d'un systeme de notification
sonore sur client1 quand le klystron change
d'etat.
 Screenshot_from_2024-05-24_14-52-04.pngScreenshot_from_2024-05-24_14-52-37.png 
  867   Fri May 24 08:21:49 2024 MEK , SC, Victor, Vincent Under ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Ring Commissioning Conditionnement section 24/05 8h10: set to standby Modulateur

Démarrage Frigo et Chiller

8h30 - 9h : intervention de Kevin
 1_1dB_3us_1Hz.pngScreenshot_1.6dB_3us_2024-05-24_17-05-27.pngclaquage_1_1dB_3us_1Hz.pdfpassage_5Hz_3us_1dB.pdf 
  866   Thu May 23 08:19:19 2024 M EK, ND, Iryna, VictorUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 23/05 8h15: set to standby Modulateur

démarrage frigo et chiller
section
 RF_signals_1.7dB_1µs_1HzAtt1dB_2us_1Hz_2024-05-23_14-51-45.pngScr_0.6_us_0.6_dB_2024-05-23_17-01-31.png 
  865   Wed May 22 08:47:19 2024 MEK,KDUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 22/05 8h45 : mise en marche de modulateur "set
to standby "

9h50 : démarrage, passage
 scope_3dB_2us_apres_claquage.pngscope_2dB_2us_apres_claquage.pngscope_1_7dB_2us_mauvais_reflechis.pngscope_1_7dB_2us_reflechis_OK.png 
  864   Tue May 21 08:33:12 2024 MEK, SC, KD, IC, MOUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 21/05 8h15 impossible de mettre " standby"
du modulateur ==> la pompe de refroidissement
n'est en marche
 red_pitayafrom_2024-05-21_17-39-23.png 
  863   Fri May 17 08:08:29 2024 MEK SC SV DNUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 17/05 set to standby modulateur 8h05

demarrage modulateur à 9h

impossible de passer à 1220V
  
ELOG V3.1.4-395e101