Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021; Tests IHM RF
|
CB/SC; liste des actions à menées
|
HM MO; redemarrage 17 aout 2022
|
MO HM; test RF modulateur longue durée (journée)
|
MO; démarrage
|
IC, VK, VI, VC, JH, HG, ND; Summary of the ring commissioning meeting #1
|
IC, VK, VI, VC, JH, HG, ND ; Ring objectives
|
IC, VK, AM, VC, ND; Beam requirements for the ring
|
VK, IC, AM, ND; Summary of the ring commissioning meeting #2
|
IC, VK, VI, VC, JH, HG, ND ; RE: Ring objectives
|
ND; RE: Beam requirements for the ring
|
ND, IC; Steerers and BPM map for the ring 
|
IC, VK, VI (ND); Summary of the ring commissioning meeting #3
|
IC, VK, VI, VC, JH, HG, ND ; RE: RE: Ring objectives
|
VK, IC, VI, JH, ND; Summary of the ring commissioning meeting #4
|
IC, VK, VI, VC, JH, HG, ND ; RE: RE: RE: Ring objectives
|
VK, IC, VI, JH, SC, ND; Summary of the ring commissioning meeting #5
|
VK, IC, VM, JH, ND; Summary of the ring commissioning meeting
|
VK, IC, VM, JH, KD, ND; Summary of the ring commissioning meeting
|
CB/HG/SC/KD; Programme linac semaine 5 décembre
|
|