37
|
Mon Oct 17 10:02:07 2022 |
VK, IC, VI, JH, SC, ND | Reference Solution | Info | resumes |
|
Summary of the ring commissioning meeting #5 | | See slides attached to the indico page
https://indico.ijclab.in2p3.fr/event/8885/
Pb with BPM => visual check |
| |
13
|
Thu Dec 10 14:43:07 2020 |
Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020 | Not Fixed | Problem | problemes |
|
Clients 1, 4 et 5 non fonctionnels | | En complément du message de Hayg,
client 4 et 5 ne fonctionnent pas non plus
(en plus de client 1). |
| |
26
|
Mon Sep 19 15:56:28 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Info | Prise de donnees |
|
Summary of the ring commissioning meeting #1 | | Status slides presented by Iryna available
on indico at https://indico.ijclab.in2p3.fr/event/8749/
The beam parameters required for |
| |
27
|
Mon Sep 19 16:29:06 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
Ring objectives | | This entry is to be updated as the work
progresses.
1) Re-establish beam transport |
| |
29
|
Mon Sep 26 09:39:15 2022 |
VK, IC, AM, ND | New Solution | Info | Prise de donnees |
|
Summary of the ring commissioning meeting #2 | | Slides are at https://indico.ijclab.in2p3.fr/event/8750/
- There is a difference in BPM
numbering in Tango and MML => we should |
| |
30
|
Mon Sep 26 10:21:20 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: Ring objectives | | (1), (2), (4) and (5) from last week
have been done other items in progress.
New to do list: |
| |
33
|
Mon Oct 3 17:29:53 2022 |
IC, VK, VI (ND) | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting #3 | |
Shift summaries for the ring for last
week are at
https://elog.lal.in2p3.fr/THOMX/Commissionning/568
https://elog.lal.in2p3.fr/THOMX/Commissionning/570
|
| |
34
|
Wed Oct 5 09:51:12 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: RE: Ring objectives | | New to do list:
(0) Re-establish beam transport
to ring |
| |
36
|
Mon Oct 10 10:37:43 2022 |
IC, VK, VI, VC, JH, HG, ND | New Solution | Shift summary | Prise de donnees |
|
RE: RE: RE: Ring objectives | | To do list:
(0) Re-establish beam transport
to ring |
| |
38
|
Mon Nov 7 23:53:29 2022 |
VK, IC, VM, JH, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Discussed recent orbit correction of
the expanded orbit.
Need
to make run with cavity detuning from |
| |
39
|
Mon Dec 5 10:05:11 2022 |
VK, IC, VM, JH, KD, ND | New Solution | Info | analyse |
|
Summary of the ring commissioning meeting | | The ring orbit has been re-established
despite some difficulties after the shutdown.
The ring cavity has been started. |
| |
41
|
Tue Dec 6 00:15:55 2022 |
ND | New Solution | Info | analyse |
|
RE: Summary of the ring commissioning meeting | | Regarding the remote control of the RF
synthetizer: it can only be controlled via
GPIB and RS-232. |
| |
42
|
Mon Jan 9 10:12:40 2023 |
IC, VK, VM, SC, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Notes from last week:
Beam was very unstable
(probably energy instabilities), lot of time |
| |
43
|
Mon Jan 16 09:38:16 2023 |
VK, VM, SC, ND, HG | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Summary of last week:
- On Thursday the beam energy was
very different from usual (magnets current |
| |
44
|
Mon Jan 23 09:54:14 2023 |
VK,IC, SC, VM, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | No beam last week. No beam this week.
Machine recovery on 2/2 => Nicolas
may try to tune the machine with students. |
| |
45
|
Tue Jan 24 10:14:20 2023 |
ND | New Solution | Info | Prise de donnees |
|
Notes from ThomX Physics meeting | | Present: IC, VK, VM, VC, SC, MEK, KD, MJ,
HG, ND, MO (sous réserve d'oublis)
Visio: CB |
| |
46
|
Thu Feb 9 12:16:41 2023 |
ND | New Solution | Info | Prise de donnees |
|
Verification variables pour l'anneau | | L'IHM de verification des variables
pour l'anneau a ete mis a jour.
Il est accessible dans plateforme |
| |
47
|
Mon Feb 20 10:06:36 2023 |
VM, VK, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | This week: beam on Thursday.
So far we did not see any screenshot
of Ring variables check. |
| |
48
|
Fri Feb 24 10:34:58 2023 |
ND | New Solution | Info | Prise de donnees |
|
RE: Notes from ThomX Physics meeting | | Présent: VK, SC, KD, MJ, HG, ND
Présentation par Marie.
Cf indico https://indico.ijclab.in2p3.fr/event/9242/ |
| |
49
|
Mon Mar 13 09:39:39 2023 |
IC, VM, SC, JH, VC, ND | New Solution | Shift summary | analyse |
|
Summary of the ring commissioning meeting | | Excitation (betatron oscillation) on the
beam observed by exciting it with the extraction
kicker => initial measures of the tune. |
    |
|